Permit Information
Permit NumberBLD00-02740
StatusFinaled
Name IDAHO COMMERCIAL CONSTRUCTION
Site Address 8047 W EMERALD ST
Project Name BOISE TOWNE PLAZA
Customer Number 
ePlanReviewNo
Description
SHOPS AT BOISE TOWNE PLAZA * FOUNDATION ONLY IN PREPARATION FOR THE FUTURE CONSTRUCTION OF SHOPS AT BOISE TOWN PLAZA BUILDING A-B. NO CONSTRUCTION BEYOND FOUNDATION IS ALLOWED UNDER THIS PERMIT. ALL PER ENGINEERED PLANS ON FILE AS APPROVED BY THE PUBLIC WORKS DEPARTMENT. NO BUILDINGS TO BE CONSTRUCTED, DEMOLISHED OR INSTALLED UNDER THIS PERMIT. DRH00-00041, PC#738-00, GRADING PERMIT IS UNDER BLD00-02694.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  7/18/2002 DONE
Fee Review-notes3/16/20013/16/20011/28/2002 DONE
DOC - Permit Finaled1/17/20021/17/20021/17/2002PPASS
DetailsRuss Owen
Finaled by inspector at 1/17/2002 4:47:21 PM
BLD-Aging Inspection1/16/20021/16/20021/16/2002 PASS
DetailsRuss Owen
this has been done 1/17/2002 4:47:16 PM
BLD-Aging Inspection10/16/200110/16/200110/16/2001 PART
DetailsRuss Owen
work is done building under construction. 10/16/2001 11:04:01 AM
BLD-Aging Inspection8/16/20018/16/20018/16/2001 PART
DetailsRuss Owen
work completed pending s-i reports. 8/22/2001 1:06:36 PM
BLD-Footing5/29/20015/31/20015/31/2001ANR
DetailsRuss Owen
###-#### bryan wil recall. 12/31/2001 11:19:58 AM
BLD-Footing5/24/20015/25/20015/25/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/24/2001 at 16:10:39. Contact: ###-####.
Plan resubmittals received  5/7/2001 DONE
Received one set of plan resubmittals from erstad thorton,all civil sheets, forwarded same to John Menard with the small documents. 5/7/01 DAR
Issue PAID IN FULL permit  4/27/2001 DONE
Inspection Record Card- Bld  4/11/2001 DONE
Print Occupancy Form  4/11/2001 DONE
Telephone call  4/11/2001 DONE
called Skip Hyde at ###-####
Routing - PLAN CHECK3/26/2001 4/10/2001 PASS
Plans routed and approved under the full building permit BLD00-02631. JCM
Plan assigned to (JCM)3/20/2001 4/10/2001 PASS
DetailsJohn Menard
4/10/01 14:36:58 JCM - activity updated through activity BLDA022 from case BLD00-02740.
PLANS/APPL TAKEN TO FRONT DESK  4/10/2001 PASS
Foundation plans included within the set of complete building plans. JCM
Routing - PLUMBING3/23/2001 3/26/2001 PASS
Second submittal per plans and 97 upc
Routing - PLANNING3/21/2001 3/23/2001 PASS
Approved per DRH00-41 and DRH01-35.
Routing - PUBLIC WORKS3/19/2001 3/21/2001 FAIL
Second submittal. requires drainage plan revision, per Brian Murphy. 3/21/01 DAR
Plans ACCEPTED BY PLAN TECH  3/19/2001 DONE
Second submittal
Recd Pcfee & Taken To Pln CK  3/16/2001 DONE
CHANGE STATUS TO (PND)  2/2/2001 DONE
per JCM
Telephone call  1/25/2001 DONE
talked to skip to verify plans are ready
Inspection Record Card- Bld  1/9/2001 DONE
Plan assigned to (JCM)9/15/2000 10/10/2000 PASS
DetailsJohn Menard
10/10/00 10:18:15 JCM - activity updated through activity BLDA022 from case BLD00-02740.
Routing - PLAN CHECK9/26/2000 10/10/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/10/2000 PASS
Routing - PLUMBING9/20/2000 9/26/2000 PASS
Routing - PLANNING9/18/2000 9/20/2000 PASS
Approved per DRH00-41.
Routing - PUBLIC WORKS9/15/2000 9/18/2000 PASS
Plans ACCEPTED BY PLAN TECH  9/15/2000 DONE
Application received  9/14/2000