Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD00-02752
StatusFinaled
Name ST LUKES
Site Address 316 W WASHINGTON ST
Project NameST LUKES
Customer NumberSTL200419
ePlanReviewNo
Description
*I.S. REMODEL - SLRMC* THIS IS AN OCCUPANCY USE CHANGE FOR THE FACILITY, "I1.1" (NURSING HOME) TO "B" (OFFICE), AND REQUIRES FULL CODE COMPLIANCE UPGRADE, SEC. 3405 & APPENDIX CH. 11, SEC. 1113, 1997 UBC. To remodel a 19,480 sq.ft.building main floor for new office's & support services space for "SLRMC Information Services", serving the internal functions of St. Luke's R.M.C., per approved plans on file. The 1,440 s.f. basement is for service of the building only (mechanical/electrical). Work to include selective demolision of interior walls; removal of portion of existing roof structure to raise the roof elevation W/ new structure, above the new computer room; construction of interior walls to form offices, accessiblity upgrades throughout, and new support areas; to upgrade exterior walls at North & East to 1-hour construction W/ protected openings / penetrations & rated parapets; new exterior wall finish; install new "Class C" roof covering system, drainage and parapet screen on South & West walls, with new RTU HVAC equipement / support structure; and interior refurbishment of ceiling, wall & floor finishes W/ electrical, plumbing, mechanical & sprinkler /alarm systems upgrades. (P.C.#743-00)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/30/20036/30/20036/30/2003 DONE
Permanent occupancy  3/4/2002 DONE
Perm. Occ. Cert. #9055 issued 3-4-02 to St. Luke's Regional Medical Center for offices.
BLD-Final2/27/20022/27/20022/27/2002PPASS
DetailsCarl Dependahl
This is the one we talked about, Carl... ok for perm. occ. 2/27/2002 4:25:07 PM
Permanent Occupancy 2/27/20022/27/2002 DONE
Details
BLD-Final8/24/20018/24/20018/24/2001PFAIL
DetailsCarl Dependahl
###-#### dan; C/n, firestop bsmt lid penetrations, manual bolts at doors, etc...ok for t/o. 8/24/2001 5:35:07 PM
DOC - Permit Finaled8/24/20018/24/20018/24/2001PPASS
DetailsCarl Dependahl
Finaled by inspector at 8/24/2001 4:39:38 PM
FIRE-Final Inspection8/22/20018/23/20018/23/2001APASS
DetailsRick Jackson
###-#### delilah
FIRE-Final Inspection8/14/20018/14/20018/14/2001PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/14/2001 at 08:53:41. Contact: ###-####. FM 200 panel in trouble; strobe in basement must ceiling mount 8/14/2001 11:37:44 AM
FIRE-Final Inspection8/8/20018/9/20018/9/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/08/2001 at 13:06:12. Contact: ###-####. items from previous correction notice weren't completed; fire sprinkler preaction system air pressure switch activated the "general fire alarm". alarm system not tested properly. reinspection fee added with parcel hold by Marsha per my request 8/9/2001 9:34:03 AM
BLD-Aging Inspection8/6/20018/6/20018/6/2001 PASS
DetailsCarl Dependahl
wip 8/6/2001 9:23:57 AM
BLD-Wall cover6/5/20016/6/20016/6/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/05/2001 at 13:41:12. Contact: ###-####.ALL ROOMS OK TO COVER & TILE 6/6/2001 11:56:01 AM
BLD-Conference5/17/20015/17/20015/17/2001PPASS
DetailsCarl Dependahl
ED ###-####
FIRE-Conference5/11/20015/14/20015/14/2001APART
DetailsRick Jackson
###-#### 10 am pressure test of FM 200 room pass 5/14/2001 11:06:37 AM
BLD-Framing/Rough-in5/11/20015/14/20015/14/2001APART
DetailsCarl Dependahl
for comp room for pres test---10:00 ??????????/ed -###-####..grid ok, seal membrane penetrations at 1hr walls 5/14/2001 10:37:21 AM
BLD-Conference5/7/20015/7/20015/7/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/7/2001 1:23:16 PM w/ Ed re handraills
BLD-Other4/17/20014/17/20014/17/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/17/2001 at 07:35:42. Contact: ###-####. grid at computer rm ok, add spacer bars, obtain elec. r/i... chk at final... 4/17/2001 3:48:18 PM
BLD-Framing/Rough-in4/6/20014/9/20014/9/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/06/2001 at 14:22:57. Contact: ###-####. southwest area partitions ok. C/N issued re ID label on fire glazing and grid install at rooms 4/9/2001 11:17:35 AM, 4/9/2001 11:18:36 AM
BLD-Framing/Rough-in4/2/20014/3/20014/3/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/02/2001 at 17:05:12. Contact: ###-####. west end ok to cover. 4/3/2001 12:42:18 PM
BLD-Framing/Rough-in3/30/20014/2/20014/2/2001APART
DetailsCarl Dependahl
###-####...rec'd termite reports, eng'r ok'd straps for holes in joists...add stud shoes at overbored studs at west end; ok to cover except as noted; submit comple ER for ext stucco ( 1hr) gaps at windows at N. & E. 4/2/2001 5:25:19 PM
BLD-Framing/Rough-in3/30/20013/30/20013/30/2001PCANC
DetailsJim Storey
###-#### out of time contractor will recall. 4/2/2001 2:03:00 PM
BLD-Framing/Rough-in3/22/20013/22/20013/22/2001PFAIL
DetailsCarl Dependahl
Ed ###-####, keep c/n, do not cover lids til joist holes resolved; submit termite report and eifs info... 3/22/2001 5:20:05 PM
BLD-Framing/Rough-in3/21/20013/21/20013/21/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/21/2001 at 10:12:52. Contact: ###-####. 2nd c/n issued, ok to cover walls at cental areas pend other insps; need submittal for eifs, ok for holes at joists, etc; infill gaps at 1hr walls3/21/2001 2:32:53 PM 3/21/2001 2:34:23 PM
BLD-Framing/Rough-in3/20/20013/20/20013/20/2001PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/20/2001 at 07:42:13. Contact: ###-####. center area, seal/ fireblock; add straps; engr to chk holes at joists 3/20/2001 6:03:39 PM
BLD-Final3/19/20013/19/20013/19/2001PNR
DetailsCarl Dependahl
###-####\\nailing
BLD-Framing/Rough-in3/19/20013/19/20013/19/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/19/2001 10:00:29 AM west portion roof heathing ok; need termite report info
BLD-Framing/Rough-in3/15/20013/16/20013/16/2001APART
DetailsCarl Dependahl
ED ###-#### partial rough in ; ok to 1 side central portion int walls & elec room walls. 3/16/2001 12:23:10 PM
BLD-Framing/Rough-in3/9/20013/12/20013/12/2001PPART
DetailsCarl Dependahl
###-####, central section roof deck nailing ok; ok to cover int partition walls at east end only...awaiting termite report. 3/12/2001 4:30:20 PM
BLD-Framing/Rough-in2/27/20012/28/20012/28/2001AFAIL
DetailsCarl Dependahl
late am ###-####;c/n: fireblocks, tighten nuts at col's & saddles; arch to clarify beam brg condition at ext wall. Possible termite damage noted at existing ext walls. OK to insul walls at east end only. 2/28/2001 3:49:20 PM
BLD-Framing/Rough-in2/28/20012/28/20012/28/2001PPART
DetailsCarl Dependahl
roofing deck insp-- john- ###-#### low section south side center 1/3 ok 2/28/2001 3:40:51 PM
BLD-Framing/Rough-in2/27/20012/27/20012/27/2001PPART
DetailsCarl Dependahl
nail insp--john-- ###-#### ok, s.e. corner low roof area...watch over driv 2/27/2001 4:45:24 PM ennails 2/27/2001 4:45:29 PM
BLD-Conference2/23/20012/26/20012/26/2001PPASS
DetailsCarl Dependahl
###-####; new supt. on job for Petra....WIP 2/26/2001 10:48:09 AM
BLD-Framing/Rough-in2/23/20012/26/20012/26/2001PNR
DetailsCarl Dependahl
###-####; need elec & plbg r/i. complete nailing at roof 2/26/2001 10:48:49 AM
BLD-Framing/Rough-in2/20/20012/20/20012/20/2001PPART
DetailsRuss Owen
ROOF NAILING\\PARTIAL###-#### ###-#### JOHN.need more nailing painted areas in blue with contractor. 2/20/2001 2:55:06 PM
BLD-Framing/Rough-in2/15/20012/16/20012/16/2001APART
DetailsTom Arcoraci
###-#### roof sheeting nailing ok parapet sheeting nailing ok parapet sheet rock wip nailing ok ok to rock int walls of elec room at north side of building 2/16/2001 10:59:14 AM
BLD-Foundation2/14/20012/15/20012/15/2001PPART
DetailsCarl Dependahl
###-#### pend spec insp report 2/15/2001 3:42:33 PM
BLD-Conference2/8/20012/8/20012/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/8/2001 11:07:19 AM w/ supt re fire rated windows...req'd at n. & e. sides, rated assy needed
BLD-Foundation2/6/20012/7/20012/7/2001APART
DetailsCarl Dependahl
re-bar Bill ###-#### pouring concrete at 11; int col. ftgs; also has spec insp report for epoxy inserts 2/7/2001 11:26:44 AM
BLD-Conference1/25/20011/25/20011/25/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/25/2001 9:38:58 AM w/ bldr re fire windows
BLD-Framing/Rough-in1/23/20011/24/20011/24/2001ANR
DetailsSteven Webb
###-####
BLD-Framing/Rough-in1/24/20011/24/20011/24/2001PPART
DetailsCarl Dependahl
###-####, parapet frame ok to sheath,add dens-deck gold at north & east sides for 1hr. 1/24/2001 4:22:55 PM
Issue & PRINT to be Invoiced  1/17/2001 DONE
Inspection Record Card- Bld  1/16/2001 DONE
Print Occupancy Form  1/16/2001 DONE
Telephone call  1/16/2001 DONE
E-MAILED CURTIS
Routing - FIRE1/8/20011/8/20011/12/2001 PASS
DetailsBill Alexander
Routing - PLAN CHECK1/12/2001 1/12/2001 PASS
ROUTED TO PERMIT DESK TO ISSUE.
PLANS/APPL TAKEN TO FRONT DESK  1/12/2001 PASS
ROUTING TO ISSUE
Plan assigned to (DRS)9/21/2000 1/12/2001 PASS
DetailsDan Stuart
1/12/2001 15:39:04 DRS - activity updated through activity BLDA022 from case BLD00-02752.
Routing - PLAN CHECK12/14/2000 1/8/2001 PEND
Resubmittals received and approved. Complete sets of new plans on 1/4/01 & clarifications on 8-1/2" x 11" sheets 0n 1/8/00. Routing to fire code analyst for review.
Plan resubmittals received  1/4/2001 DONE
Two sets of plan resubmittals received from St. Lukes, CSHQA, and small documents. Forwarded same to Dan Stuart. 1/4/01 DAR
Routing - PUBLIC WORKS12/8/2000 12/14/2000 PASS
Routing - FIRE12/5/200012/8/200012/8/2000 FAIL
DetailsBill Alexander
Lack sufficient info relating with UBC to finish review.
Plan Review Completed(1st rev)  12/8/2000 FAIL
Routing - PLANNING12/4/200012/4/200012/5/2000 DONE
Approved as per DRH00-00147
Plan resubmittals requested  12/2/2000  
Faxed & mailed copy of plan review comments to John Maulin, Architect, CSHQA for response / resubmittals.
Routing - PLAN CHECK10/2/2000 12/2/2000 FAIL
Copy of plan review comments to John Maulin, mailed & faxed. Corrections / resubmittals required. Routing to planning & fire code analysts for review while waitng for response.
Routing - PUBLIC WORKS9/22/2000 10/2/2000 FAIL
GEO THERMAL SERVICE ALREADY EXISTS TO THIS BUILDING.NO INFORMATION PROVIDED AS TO HOW THIS WILL BE ABANDONED. 10/2/00 DAR
Plan routing begun/TENANTS  9/22/2000 DONE
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  9/18/2000 DONE
Received Certificate of Value  9/15/2000 DONE
Application received  9/15/2000  
BLD-Framing/Rough-in3/6/20013/6/20013/7/2000APART
DetailsCarl Dependahl
John ###-#### roof nailing; 65 sq. west of penthouse ok 3/7/2001 9:23:24 AM
BLD-Framing/Rough-in2/26/20012/26/20012/27/2000PNR
DetailsCarl Dependahl
###-#### John