Permit Information
Permit NumberBLD00-02758
StatusFinaled
Name NATIONWIDE HEALTH PROPERTIES
Site Address 727 E RIVERPARK LN Unit: #200
Project NameRIVER RUN CENTER
Customer Number 
ePlanReviewNo
Description
To remodel for a new doctor's office/surgery center tenant space and increasing the area from 3,864 to 4,090 sq.ft. in an existing building per approved plans on file. Work to include miscellaneous interior demolition work, a new exterior window, a new exterior accessible sloped walk, a new unisex accessible bathing/toilet room, accessible upgrades including existing restrooms, structural modifications to reinforce the wood framed floor underneath the Radiology room (new beams, posts, and footings), structural support for new light fixture in Operating room at existing roof truss, new portions of one-hour rated tenant demising wall and new rated door, new one-hour rated medical gas closet, new interior walls and doors, interior finish, new suspended ceiling, alarm work, plumbing work, mechanical work, and electrical work. The surgery area is being separated from the office/exam area by a one-hour fire rating (walls and ceiling) and 20 minute rated doors, because of a State of Idaho requirement, not a Boise City requirement. NOTE: This building has an alarm system. (P.C.#746-00) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/23/2014 DONE
Permanent Occupancy 4/19/20014/19/2001 DONE
Details
BLD-Final4/18/20014/19/20014/19/2001APASS
DetailsJim Storey
Final
Permanent occupancy  4/19/2001 DONE
Perm. Occ. Cert. #8638 issued 4-19-01 to Dr. David Blackmer.
Fee Review-notes9/18/20009/18/20003/19/2001 DONE
Temporary occupancy  3/5/2001 PART
Temp. Occ. Cert. #4521 issued 3-5-01 to Dr. David Blackmer.
BLD-Final2/28/20013/2/20013/2/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/28/2001 at 09:49:24. Contact: ###-####. ok for temp pending ele sign off of cat scan room. 3/2/2001 3:17:40 PM
FIRE-Final Inspection2/26/20012/26/20012/26/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 2/26/2001 2:48:38 PM
FIRE-Final Inspection2/22/20012/23/20012/23/2001ANR
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/22/2001 9:13:39 AM contractor will reschedule 2/23/2001 8:52:05 AM
FIRE-Final Inspection2/21/20012/22/20012/22/2001ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/21/2001 at 13:06:06. Contact: ###-####.
BLD-Other2/13/20012/14/20012/14/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/13/2001 at 12:36:31. Contact: ###-####. ceilling ok pending ele aproval required/ fire stopping at back wall. 2/14/2001 9:43:23 AM
FIRE-Final Inspection2/12/20012/13/20012/13/2001PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/12/2001 at 13:14:10. Contact: ###-####. fire alarm plans needed; gas lines labeling; need to test generator transfer switch 2/13/2001 3:08:52 PM
BLD-Framing/Rough-in12/16/200012/18/200012/18/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/2000 at 10:39:04. Contact: ###-####. framing ok pending med-gas insp. 12/18/2000 10:58:57 PM
BLD-Framing/Rough-in12/14/200012/15/200012/15/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/2000 at 11:19:34. Contact: ###-####. framing ok pending med-gas insp. 12/18/2000 11:00:02 PM
Inspection Record Card- Bld  11/28/2000 DONE
Print Occupancy Form  11/28/2000 DONE
Inspection Record Card- Bld  11/28/2000 DONE
Telephone call  11/28/2000 DONE
gave dollar amount
Issue PAID IN FULL permit  11/28/2000 DONE
Routing - PLUMBING11/24/2000 11/27/2000 PASS
Routing - PLAN CHECK11/27/2000 11/27/2000 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  11/27/2000 PASS
Plan assigned to (JCB)9/19/2000 11/27/2000 PASS
DetailsJason Blais
11/27/2000 13:13:45 JCB - activity updated through activity BLDA022 from case BLD00-02758.
Routing - PLAN CHECK10/26/2000 11/24/2000 PEND
Permit and plan approval dependent on Plumbing approval of plans. Plans routed to the Plumbing Division.
Plan resubmittals received  11/22/2000 DONE
Received plan resubmittals from Larry Knopp Architect, two sets of sheets A7,M1,P1 and P2, forwarded same to Jason Blais. 11/22/00 DAR
Routing - PLUMBING11/15/200011/15/200011/15/2000 FAIL
provide shut off valves outside operating room for those outlets/inlets only. an additional set of shut off valves will be required to isolate the other outlet/inlets. an alarn system will be required, vacuum exhaust must be 30' from any door or window and 50' from any fresh air intake, vacuum piping must be copper, provide a floor sink next to the vacuum pump, additional cross connection protection may be required.
Plan resubmittals received  11/15/2000 DONE
Received plan resubmittals from Larry Knopp, two sets of sheets A2 and A4, forwarded same to Jason Blais with small document. 11/15/00 DAR
Plan Reviewer's activity  11/9/2000  
Not all issues addressed on resubmittal sheets. Talked with architect's representative on remaining deficient items requesting more resubmittal sheets. The items will be addressed and resubmittal sheets provided.
Plan resubmittals requested  11/9/2000  
Resubmittal drawings required again.
Plan resubmittals received  11/7/2000 DONE
Received plan resubmittals from Larry Knopp forwarded two sets to Jason Blais, and two sets of sheet A-7 to Gerry Varner. 11/7/00 DAR
Routing - FIRE10/23/2000 10/26/2000 PASS
Plan Review Completed(1st rev)  10/26/2000 FAIL
Failed Bldg review
Routing - PLUMBING10/20/2000 10/23/2000 FAIL
Routing - PLAN CHECK9/20/2000 10/20/2000 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routing to Plumbing and then to the Fire Dept. for review.
Plan resubmittals requested  10/20/2000  
Plan resubmittals required for further review.
Routing - PUBLIC WORKS9/19/2000 9/20/2000 PASS
Pending Assignment by MYS9/19/2000 9/19/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  9/19/2000 DONE
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  9/18/2000 DONE
Received Certificate of Value  9/18/2000 DONE
Application received  9/18/2000  
Recd Pcfee & Taken To Pln CK