BLD-Final | 8/8/2001 | 8/8/2001 | 8/8/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/8/2001 2:38:39 PM demo ok
|
DOC - Permit Finaled | 8/8/2001 | 8/8/2001 | 8/8/2001 | P | PASS |
Carl Dependahl
|
|
|
Finaled by inspector at 8/8/2001 2:38:54 PM
|
Issue PAID IN FULL permit | | | 10/2/2000 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 9/21/2000 | | 9/29/2000 | | PASS |
Dan Stuart
|
|
|
9/29/2000 13:02:59 DRS - activity updated through activity BLDA022 from case BLD00-02766.
|
Routing - PLAN CHECK | 9/22/2000 | | 9/29/2000 | | PASS |
|
|
|
Approved for demolition work only as described within body of permit.
|
Telephone call | | | 9/29/2000 | | DONE |
Dan Stuart
|
|
|
Called Bob Smith, architect, to review the existing building and the 1992 letter of agreement and if was aware of the requirements for the sprinkler system, smoke detection, pre-action and occupancy separation wall requirements and review with him that this demolition and proposed remodel will require relocation of each of these items based on the new area uses. Stated to him that the sprinkler, smoke, & preaction systems could not be modified in the least under this demo permit and that I would specifically not this fact in the permit. He understood the situation. I told him I would call the contractor and review with him the specific limits of the permit.
|
Meeting | | | 9/29/2000 | | |
|
|
|
Had Bill Alexander come to my desk to review with him the intended demolition and future proposed remodel. Discussed the sprinkler system & smoke detection / pre-action system and the different areas covered by one or the other and that the demo permit would be issued with specific limits. I let Bill read the permit and modified per his suggestions. Preparing to rout for issuance of demo permit only aslisted in permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2000 | | PASS |
|
|
|
Routed to permit desk for issuance per specific notes in body of permit.
|
Inspection Record Card- Bld | | | 9/29/2000 | | DONE |
|
|
|
|
Application received | | | 9/18/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/18/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 9/18/2000 | | DONE |
|
|
|
|
Routing - FIRE | 6/29/2000 | | 6/29/2000 | | PASS |
|
|
|
Reviewed plans with Bill Alexander, ire code analyst for sprinkler system plans and had him review my demolition permit for thought or comments he wanted included. Made modifications to permit body. Bill stated he would cover requirements for system modifications in his review of the plans routing for the proposed remodel/use changes in the area.
|