Permit Information
Permit NumberBLD00-02770
StatusFinaled
Name BOISE RESEARCH CENTER INC
Site Address 6213 N CLOVERDALE RD
Project NameBRC - FREMONT BLDG
Customer Number 
ePlanReviewNo
Description
BOISE RESEARCH CENTER (SHELL & CORE) - TO BUILD A NEW 24,000 SQUARE FOOT, ONE STORY, SHELL & CORE BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING WILL BE CONSTRUCTED OF CONCRETE TILT-UP EXTERIOR WALLS AND STEEL ROOF FRAMING WITH METAL ROOF DECK. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE. NOTE: THE SPRINKLER DESIGN FOR THIS BUILDING IS APPROVED FOR LIGHT HAZARD ONLY. THIS WOULD ALLOW "B" OCCUPANCIES ONLY. SPRINKLER SYSTEM UPGRADES AND NEW REVIEW REQUIRED BEFORE HIGHER HAZARD OCCUPANCIES CAN BE WITHIN THIS BUILDING. THIS IS A SHELL AND CORE PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS WILL BE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. ALL CONSTRUCTION PER THE APPROVED PLANS, REDLINES AND ATTACHED COMMENT LIST. DRH00-00157/PC #749-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes1/25/20021/25/20021/29/2002 DONE
Case Summary (BLD)  10/30/2001 DONE
Case Summary (BLD)  10/25/2001 DONE
Case Summary (BLD)  10/25/2001 DONE
Letter of compliance  7/20/2001 DONE
Letter of Compliance #21564 issued 7-20-01.
BLD-Final7/19/20017/19/20017/19/2001PPASS
DetailsTom Arcoraci
###-####-- OK FOR FINAL 7/19/2001 1:24:18 AM
BLD-Final7/17/20017/18/20017/18/2001AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/17/2001 at 17:39:13. Contact: ###-####. non compliance to first c/notice 7/17/2001 10:10:23 PM
BLD-Final7/16/20017/17/20017/17/2001AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/16/2001 at 13:58:18. Contact: ###-####. CN POSTED 7/16/2001 10:02:41 PM
Code Occupancy Approval  7/10/2001 PASS
Meets compliance - Signed Final.
FIRE-Final Inspection7/5/20017/6/20017/6/2001PPASS
DetailsJoe Tawney
Reinsp OK for certificate of completion 7/6/2001 11:14:24 AM
FIRE-Final Inspection6/28/20016/29/20016/29/2001PFAIL
DetailsJoe Tawney
Final Fail Alarm system 6/29/2001 2:40:36 PM
BLD-Framing/Rough-in3/28/20013/28/20013/28/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/28/2001 at 09:55:12. Contact: ###-####. Shell/core framing OK. 3/28/2001 2:01:18 PM
BLD-Footing1/17/20011/17/20011/17/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/17/2001 at 06:48:25. Contact: ###-####. crew still working on rebar spec inspector will be on site to final 1/17/2001 12:17:01 PM
BLD-Footing1/11/20011/12/20011/12/2001PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 01/11/2001 at 16:13:36. Contact: ###-####. No one on site (snowing). 1:20 PM. 1/12/2001 1:41:16 PM
BLD-Footing1/9/20011/10/20011/10/2001APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/09/2001 at 16:53:56. Contact: ###-####. crew is working on ftg bar spec insp will be on site to ck final and test conc. 1/10/2001 1:08:24 PM
BLD-Concrete1/2/20011/3/20011/3/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/02/2001 at 16:52:14. Contact: ###-####. westec on site to inspect & test concrete 1/3/2001 9:28:38 AM
Plan resubmittals received  12/18/2000 DONE
Received three copies of revsied sheet C-1. Routed to Jim Sly. KMM
BLD-Footing12/12/200012/12/200012/12/2000PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/12/2000 at 11:01:53. Contact: ###-####. Foot OK pending spec.insp & appr. 12/12/2000 2:22:32 PM
(F) Reprint permit  12/6/2000 DONE
Issue PAID IN FULL permit  12/5/2000 DONE
Print Occupancy Form  10/23/2000 DONE
Inspection Record Card- Bld  10/23/2000 DONE
Telephone call  10/23/2000 DONE
called permit ready and fees due and need ACHD
Routing - PLAN CHECK10/19/2000 10/20/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/20/2000 PASS
Plan assigned to (JCM)9/19/2000 10/20/2000 PASS
DetailsJohn Menard
10/20/00 16:00:01 JCM - activity updated through activity BLDA022 from case BLD00-02770.
Routing Off Site - STRUCTURAL10/12/2000 10/20/2000 PASS
SENT RESUBS TO STRUCTURAL ENGINEER VIA PDQ. RECEIVED A FAX FROM THE CONSULTING ENGINEER INDICATING THAT ALL COMMENTS HAD BEEN ADEQUATELY ADDRESSED WITH THE RESUBMITTED PLANS.
Routing - FIRE10/17/2000 10/19/2000 PASS
REsubmittal acceptable
Plan resubmittals received  10/17/2000 DONE
RECEIVED THREE COPIES OF REVISED SHEET SP-1 ROUTED TO JOHN M. KMM
Plan Reviewer's activity  10/17/2000  
INSERTED REVISED SITE PLANS AND ROUTED TO FIRE REVIEW. JCM
Routing - PLAN CHECK10/13/2000 10/17/2000 PASS
Plan resubmittals received  10/16/2000 FAIL
RECEIVED THREE COPIES OF REVISED SHEETS SP-1. NOT SIGNED CONTACTED CORNEL OF THIS NEED. PLANS WERE PICKED UP BY BENNY. KMM
Routing - PLUMBING10/12/2000 10/13/2000 PASS
Plan Reviewer's activity  10/12/2000  
INSERTED REVISED ARCHITECTURAL, STRUCTURAL AND PLUMBING REVISED PLANS AND ROUTED TO PLUMBING. JCM
Plan Review Completed(1st rev)  10/12/2000 FAIL
failed fire review
Routing - PLAN CHECK10/12/2000 10/12/2000  
Routing - FIRE10/9/2000 10/12/2000 FAIL
comments faxed to architect
Plan resubmittals received  10/11/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM LARSON ARCHITECTSSTRUCTURAL COMMENTS AND 3 SETS OF SHEETS A-7, S-4 AND M-1, FORWARDED SAME TO JOHN MENARD
Routing - PUBLIC WORKS10/6/2000 10/9/2000  PAS
Routing - PLAN CHECK10/9/2000 10/9/2000  
Routing - PLAN CHECK10/3/2000 10/6/2000  
Routing Off Site - STRUCTURAL9/19/2000 10/5/2000 FAIL
SENT PLANS TO ENGINEERING CONSULTANT VIA PDQ. 9/19/00 DAR
Plan resubmittals requested  10/5/2000  
FAXED THE ARCHITECT OF RECORD A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS. JCM
Plan Reviewer's activity  10/4/2000 PASS
PLANS REVIEWED AND APPROVED AS DRAWN WITH REDLINED NOTES AND ATTACHED COMMENT LIST. JCM
Routing - PLUMBING9/29/2000 10/2/2000 FAIL
your water piping diagram does not match your fixture schedule or upc, please provide a waste and vent piping diagram for the restrooms
Routing - PLANNING9/22/2000 9/29/2000 PASS
Routing - PUBLIC WORKS9/19/2000 9/22/2000 FAIL
REQUIRES EASEMENTS AND SOILS REPORT PER BRIAN MURPHY. 9/22/00 DAR
Plans ACCEPTED BY PLAN TECH  9/19/2000 DONE
SOILS REPORT REQUIRED. NOTIFIED CORNELL LARSON. 9/19/00 DAR
RECEIVED SOILS REPORT. 9/19/00 DAR
Application received  9/18/2000  
Recd Pcfee & Taken To Pln CK  9/18/2000 DONE