DOC - Permit Expired | 2/6/2003 | 2/6/2003 | 2/6/2003 | P | PASS |
Carl Dependahl
|
|
|
Expired by inspector at 2/6/2003 3:45:48 PM
|
BLD-Aging Inspection | 1/31/2003 | 1/31/2003 | 2/6/2003 | | DONE |
Carl Dependahl
|
|
|
work appears to have been done...space is vacant, ownership of bldg has changed...unable to locate responsible party 2/6/2003 3:45:45 PM
|
BLD-Foundation | 11/29/2000 | 11/30/2000 | 11/30/2000 | A | PASS |
Jim Storey
|
|
|
found -###-#### phil
|
Routing - PLAN CHECK | 11/27/2000 | 11/27/2000 | 11/29/2000 | | PASS |
|
|
|
Collected appropriate ER Report for Epoxy Connection W/ Concrete #4016; URM, #4815; EIFS, #2728 & attached to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2000 | | PASS |
|
|
|
Routing to permit desk for issuance.
|
Inspection Record Card- Bld | | | 11/29/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/29/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/29/2000 | | DONE |
|
|
|
left mess that permit is ready
|
Issue PAID IN FULL permit | | | 11/29/2000 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 9/24/2000 | | 11/29/2000 | | PASS |
Dan Stuart
|
|
|
11/29/2000 13:48:04 DRS - activity updated through activity BLDA022 from case BLD00-02794.
|
Routing - PLAN CHECK | 11/15/2000 | | 11/20/2000 | | FAIL |
|
|
|
Resubmittal information in question or incomplete. ER #4016 for epoxy connection into URM is not current and no longer listed for use W/ epoxy in URM, 1998 Listing. Have contacted architect. Will call and discuss W/ Engineer. Hilti HIT HY-20 is listed product for URM - ER#4815. Questions on EFIS System Specified - ER Report Number not provided, only generic manufacture's sales specifications data.
|
Plan resubmittals received | | | 11/17/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF REVISED DRAWINGS W/PLAN CHECK CORRECTIONS (A2.0, A3.0, A4.0) W/STRUCTURAL CALCS. & DETAILS. ONE COPY OF PLAN CHECK RESPONSE LETTER, PRODUCT INFO ON EIFS, HORIZONTAL SURFACE FINISH SYSTEMS. ROUTED TO DAN S. KMM
|
Plan Review Completed(1st rev) | | | 11/15/2000 | | FAIL |
|
|
|
failed bldg review
|
Routing - FIRE | 11/10/2000 | | 11/14/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/26/2000 | | 11/10/2000 | | FAIL |
Dan Stuart
|
|
|
ROUTING TO FIRE CODE ANALYSTS FOR REVIEW AND APPROVAL.
|
Plan resubmittals requested | | | 11/10/2000 | | FAIL |
|
|
|
FAXED AND MAILED COPY OF CORRECTIONS FROM PLAN REVIEW NEEDING REPSONSE BY NEW DETAIL SUBMITTALS.
|
Plan resubmittals received | | | 11/2/2000 | | DONE |
|
|
|
Received plan resubmittals from Simplot Construction, all small documents, forwarded same to Dan Stuart. 11/2/00 DAR SMALL DOCS WERE COPY OF LICENCE AGREEMENT WITH ACHD TO ALLOW TENANT TO BUILD INTO ACHD RIGHT-OF-WAY. COPY ON PLANS & IN FILE.
|
Routing - PUBLIC WORKS | 9/24/2000 | | 9/26/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 9/26/2000 | | 9/26/2000 | | PASS |
|
|
|
approved as per conditions in DRH00-00140.
|
Plan routing begun/TENANTS | | | 9/24/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 9/20/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 9/20/2000 | | DONE |
|
|
|
|
Application received | | | 9/19/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/19/2000 | | DONE |
|
|
|
|
Fee Review-notes | 9/19/2000 | 9/19/2000 | | | |
|
|
|
|