BLD-Final | 3/7/2001 | 3/8/2001 | 3/8/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 20:47:40. Contact: ###-####. lc issued 3/8/2001 10:14:11 AM
|
DOC - Permit Finaled | 3/8/2001 | 3/8/2001 | 3/8/2001 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 3/8/2001 10:14:41 AM
|
BLD-Final | 3/6/2001 | 3/7/2001 | 3/7/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 12:33:48. Contact: ###-####. c/n issued-deck needs completed, fire caulk needed at garage ceiling at vacuum line penetration. 3/7/2001 12:50:36 PM
|
BLD-Final | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 09:31:04. Contact: ###-####. cn postrd 3/1/2001 4:21:41 PM
|
BLD-Energy code compliance | 1/10/2001 | 1/11/2001 | 1/11/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 13:14:40. Contact: ###-####. ok to cover 1/11/2001 9:02:42 AM
|
BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 08:22:51. Contact: ###-####. ok to insulate 1/8/2001 11:00:04 AM
|
BLD-Framing/Rough-in | 1/3/2001 | 1/4/2001 | 1/4/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 14:38:14. Contact: ###-####.c/n items dated 1/3/01 not completed. 1/4/2001 9:30:53 AM
|
BLD-Framing/Rough-in | 1/3/2001 | 1/3/2001 | 1/3/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 10:01:54. Contact: ###-####. c/n issued 1/3/2001 1:04:36 PM
|
BLD-Framing/Rough-in | 12/28/2000 | 1/2/2001 | 1/2/2001 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 09:53:20. Contact: ###-####.
420 will do 1/2/2001 11:26:09 AM
|
BLD-Footing | 1/2/2001 | 1/2/2001 | 1/2/2001 | A | PART |
Steven Webb
|
|
|
Added by Inspector: 420 On 1/2/2001 11:06:12 AM already poured
|
BLD-Framing/Rough-in | 1/2/2001 | 1/2/2001 | 1/2/2001 | A | FAIL |
Steven Webb
|
|
|
Added by Inspector: 420 On 1/2/2001 11:56:52 AM c/n posted; no address posted and no approved plans on site
|
BLD-Framing/Rough-in | 12/5/2000 | 12/6/2000 | 12/6/2000 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 11:19:43. Contact: ###-####. need hd inside ent 12/6/2000 3:27:55 PM y, c/n issued. 12/6/2000 3:28:01 PM
|
Inspection Record Card- Bld | | | 10/30/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/30/2000 | | DONE |
|
|
|
called permit ready
|
Issue PAID IN FULL permit | | | 10/30/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 10/16/2000 | | 10/27/2000 | | PASS |
Steve Munroe
|
|
|
10/27/2000 14:56:18 SAM - activity updated through activity BLDA022 from case BLD00-02804.
|
Pending Assignment by DJO | 9/20/2000 | | 10/16/2000 | | DONE |
Dan Overy
|
|
|
10/16/2000 06:44:25 SAM - activity updated through activity BLDA183 from case BLD00-02804.
|
BLD-Foundation | 10/5/2000 | 10/5/2000 | 10/5/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### 14236, bsmt, bar looks ok,hd's not in 10/5/2000 4:08:20 PM
|
BLD-Footing | 10/3/2000 | 10/3/2000 | 10/3/2000 | P | PART |
Russ Owen
|
|
|
FT INSP GREG ###-#### early start appears ok. 10/4/2000 8:43:25 AM
|
Routing - PUBLIC WORKS | 9/20/2000 | 9/20/2000 | 9/21/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 9/20/2000 | 9/20/2000 | 9/21/2000 | | PASS |
|
|
|
|
Application received | | | 9/20/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 9/21/2000 | 9/21/2000 | | | PEND |
|
|
|
|
Early Start Permit | | | | | DONE |
|
|
|
|
Plan Reviewer's activity | | | | | FAIL |
|
|
|
10/16/00 10:06 Called and told Greg D. that I need the engineer to look this house. Greg informed me that he is on his way down and will talk to me then. (I need the engineer to look at front wall, concrete lintels, all beams and floor joists.)
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|