Permit Information
Permit NumberBLD00-02809
StatusFinaled
Name LINGER LONGER LODGE APARTMENTS
Site Address 923 N MAPLE GROVE RD
Project NameLINGER LONGER LODGE AP
Customer Number 
ePlanReviewNo
Description
BUILDING # 4 - TYPE A * TO CONSTRUCT A NEW 22,292 SQ.FT., THREE STORY, WOOD FRAMED, 18 UNIT APARTMENT BUILDING. THE FIRST FLOOR IS 8,328 SQ,FT AND CONTAINS 6 GARAGES, TWO, TWO BEDROOM UNITS AND FOUR, ONE BEDROOM UNITS, THE SECOND FLOOR IS 8,514 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR, ONE BEDROOM UNITS. THE THIRD FLOOR IS 5,550 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS. ALL CONSTRUCTION PER THE APPROVED PLANS. NOTE: THIS BUILDING HAS A NFPA 13-R FIRE SPRINKLER SYSTEM. MJP DRH 99-126 CUP 00-00061 PC#765-00
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/30/20036/30/20036/30/2003 DONE
Case Summary (BLD)  1/23/2002  
Permanent Occupancy 11/16/200111/16/2001 DONE
Details
Permanent occupancy  11/16/2001 DONE
Perm. Occ. Cert. #8905 issued 11-16-01 to the Linger Longer Lodge Apts.
BLD-Final11/14/200111/15/200111/15/2001APASS
DetailsTom Arcoraci
###-#### ok for perm when others sign perm 11/15/2001 11:43:59 AM
Temporary occupancy  10/1/2001 PART
Temp. Occ. Cert. #4604 issued 10-1-01 to the Linger Longer Lodge Apts.
BLD-Framing/Rough-in9/12/20019/12/20019/12/2001PPART
DetailsRuss Owen
Added by Inspector: 407 On 12/9/2001 1:53:41 PM ok to rock left side of building, except for the garage .needs ele insp.
BLD-Final8/10/20018/10/20018/10/2001PPASS
DetailsJoe Tawney
Added by Inspector: 406 On 8/10/2001 12:39:40 PM Reinsp OK for permanant
BLD-Final7/25/20017/25/20017/25/2001APART
DetailsRuss Owen
tim ###-####ok temp oc only , needs all per signatures and stairs have corrections.c/n on site. ok for temporary. 7/25/2001 5:08:42 PM
BLD-Final7/25/20017/25/20017/25/2001APART
DetailsRuss Owen
tim ###-####ok temp oc only , needs all per signatures and stairs have corrections.c/n on site. ok for temporary. 7/25/2001 5:08:42 PM
FIRE-Final Inspection7/25/20017/25/20017/25/2001PPASS
DetailsJoe Tawney
###-#### Reinsp OK for temp Occ 7/25/2001 3:10:52 PM Move FDC Monitor Contr vlvs on back flow 7/25/2001 3:11:41 PM
FIRE-Final Inspection7/20/20017/23/20017/23/2001PFAIL
DetailsJoe Tawney
###-#### Final Fail C/N issued 7/23/2001 3:46:16 PM
FIRE-Final Inspection7/19/20017/20/20017/20/2001PCANC
DetailsRick Jackson
###-#### inspector #409 didn't have enough time to get to it 7/20/2001 3:58:21 PM
BLD-Final7/20/20017/20/20017/20/2001PFAIL
DetailsRuss Owen
###-####. c/n posted also needs fire/life safety. 7/20/2001 3:33:01 PM
Code Occupancy Approval  7/19/2001 FAIL
Signed Temporary - have bonded $110,000 +/- on this project for landscaping. Signed temporary occupancy for building #4.
FIRE-Conference6/19/20016/20/20016/20/2001APASS
DetailsJoe Tawney
Conf with contr regarding signage for project 6/20/2001 12:01:07 PM
Override - Parcel Holds  6/19/2001  
BLD-Framing/Rough-in5/31/20016/1/20016/1/2001PPASS
DetailsRuss Owen
###-#### ok to sheetrock soffit. 1/4/2002 9:38:39 AM
Override - Parcel Holds  5/31/2001  
Override - Parcel Holds  5/30/2001  
BLD-Energy code compliance5/18/20015/21/20015/21/2001APASS
DetailsRuss Owen
John ###-#### ok to rock garages. 12/21/2001 1:56:02 PM
FIRE-Alarm Testing5/18/20015/21/20015/21/2001APASS
DetailsJoe Tawney
###-#### Conf with Lea Elect reg exit signs. Adv not req by code 5/22/2001 10:50:33 AM
Override - Parcel Holds  5/18/2001  
Override - Parcel Holds  5/18/2001  
BLD-Energy code compliance5/15/20015/16/20015/16/2001APASS
DetailsRuss Owen
###-#### ok to sheetrock 12/16/2001 12:44:04 PM
BLD-Energy code compliance5/15/20015/15/20015/15/2001PFAIL
DetailsRuss Owen
JOHN ALSO WANTS DRY NAILING INSPECTION ###-####
Override - Parcel Holds  5/15/2001  
Override - Parcel Holds  5/15/2001  
BLD-Framing/Rough-in5/14/20015/14/20015/14/2001PPART
DetailsRuss Owen
###-#### ok to add 2nd layer at req areas. 12/14/2001 4:43:48 PM
FIRE-Conference5/11/20015/14/20015/14/2001PPASS
DetailsJoe Tawney
Tim ###-#### Conf with Gen contr about alarm system 5/14/2001 2:07:53 PM
Override - Parcel Holds  5/14/2001  
BLD-Framing/Rough-in5/10/20015/11/20015/11/2001PPART
DetailsRuss Owen
Tim ###-#### ok to i nsulate need some adnl caulking done . 12/11/2001 3:44:11 PM
Override - Parcel Holds  5/11/2001  
Override - Parcel Holds  5/10/2001  
BLD-Energy code compliance5/8/20015/8/20015/8/2001PPART
DetailsRuss Owen
john ###-#### .need to re-insp addnl items noted with contractor. 12/8/2001 5:43:47 PM
Override - Parcel Holds  5/8/2001  
BLD-Framing/Rough-in5/4/20015/7/20015/7/2001APART
DetailsRuss Owen
john ###-#### 2/7/2001 12:00:19 PM 12/7/2001 12:00:30 PM ok to insulate need to firestop walls at floor lines. 12/7/2001 1:35:35 PM
BLD-Framing/Rough-in5/4/20015/4/20015/4/2001PFAIL
DetailsRuss Owen
Tim ###-#### Building #4 12/4/2001 9:18:08 AM
Override - Parcel Holds  5/4/2001  
Override - Parcel Holds  5/4/2001  
BLD-Framing/Rough-in4/30/20015/1/20015/1/2001APART
DetailsRuss Owen
TIM ###-#### FR ok to cover ext walls only,needs ele before frame insp. 12/2/2001 9:20:09 AM
Override - Parcel Holds  4/30/2001  
Override - Parcel Holds  4/30/2001  
BLD-Foundation4/26/20014/27/20014/27/2001AFAIL
DetailsDave Hannah
shear wall Kenneth ###-####crew covered up strapes they are going to uncover they also need to add bolts to mud plate and nail bottom plates on sec and third floors and nail strapes by stairs 4/27/2001 10:20:13 AM
BLD-Conference4/11/20014/12/20014/12/2001APART
DetailsRuss Owen
Tim ###-####
BLD-Conference4/9/20014/10/20014/10/2001ACANC
DetailsDave Hannah
tim ###-#### bldg #4
BLD-Conference3/6/20013/6/20013/6/2001PPART
DetailsRuss Owen
Tim ###-####
BLD-Concrete2/28/20013/1/20013/1/2001APASS
DetailsTom Arcoraci
###-####
BLD-Foundation2/5/20012/5/20012/5/2001PPASS
DetailsRuss Owen
###-####
Override - Parcel Holds  2/5/2001  
BLD-Footing1/25/20011/26/20011/26/2001APASS
DetailsRuss Owen
ft insp tim ###-####
Override - Parcel Holds  1/25/2001  
Issue PAID IN FULL permit  1/22/2001 DONE
Inspection Record Card- Bld  1/18/2001 DONE
Print Occupancy Form  1/18/2001 DONE
Plan Reviewer's activity  1/17/2001 PASS
Print Pending Permit.LaserJet4  1/17/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/17/2001 DONE
Case Summary (BLD)  1/17/2001 DONE
Plan assigned to (M_P)9/20/2000 1/17/2001 PASS
DetailsMike Phillips
1/17/2001 13:24:26 M_P - activity updated through activity BLDA022 from case BLD00-02809.
Routing - PLANNING1/8/20011/8/20011/9/2001 PASS
Approved per CUP00-00061 & DRH00-00126.
Plan resubmittals received  1/8/2001 DONE
Received plan resubmittals, two sets from Jensen/Fey, forwarded same to Mike Phillips. 1/8/01 DAR
Plan Reviewer's activity  12/28/2000 FAIL
Additional information required for further review.
Routing - FIRE12/27/200012/27/200012/27/2000 PASS
DetailsBill Alexander
Routing - FIRE12/14/200012/18/200012/18/2000 FAIL
DetailsBill Alexander
Lack sprinkler water supply design criteria. Lack fire line supply information, taps, size, locations, etc.
Plan resubmittals received  12/4/2000 DONE
Received plan resubmittals from Jensen/Fey, forwasrded three sets to Mike Phillips. 12/5/00 dar
Routing - FIRE10/24/200010/27/200010/25/2000 FAIL
DetailsBill Alexander
Lack sufficient UFC, UBC related information.
Plan Review Completed(1st rev)  10/25/2000 FAIL
Routing Off Site - STRUCTURAL9/26/2000 10/24/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
SECOND REVIEW REQUIRED MJP
Routing - PLAN CHECK10/10/2000 10/24/2000  
ROUTING TO FIRE.
Plan Reviewer's activity  10/24/2000 FAIL
ADDITIONAL INFORMATION REQUIRED FOR FURTHER REVIEW.
Routing - PLUMBING10/5/2000 10/9/2000 PASS
Routing - PLANNING10/5/2000 10/5/2000 FAIL
Routing - PUBLIC WORKS9/28/2000 10/5/2000 FAIL
Plans ACCEPTED BY PLAN TECH  9/28/2000 DONE
Plan routing begun/NEW & ADDTN  9/28/2000 DONE
Plans ACCEPTED BY PLAN TECH  9/25/2000 HOLD
WAITING FOR ON SITE FOUNDATION COPY OF PLANS. SPOKE WITH JAY BONNETT. HE IS SENDING ASAP. KMM
Received Certificate of Value  9/25/2000 DONE
Application received  9/20/2000  
Routing - PLAN CHECK12/18/200012/18/2000   
took to mike p
Case Summary (BLD)     
Routing - PUBLIC WORKS11/29/2000