Fee Review-notes | 6/30/2003 | 6/30/2003 | 6/30/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/23/2002 | | |
|
|
|
|
Permanent Occupancy | | 11/16/2001 | 11/16/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/16/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8905 issued 11-16-01 to the Linger Longer Lodge Apts.
|
BLD-Final | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm when others sign perm 11/15/2001 11:43:59 AM
|
Temporary occupancy | | | 10/1/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4604 issued 10-1-01 to the Linger Longer Lodge Apts.
|
BLD-Framing/Rough-in | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 12/9/2001 1:53:41 PM ok to rock left side of building, except for the garage .needs ele insp.
|
BLD-Final | 8/10/2001 | 8/10/2001 | 8/10/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 8/10/2001 12:39:40 PM Reinsp OK for permanant
|
BLD-Final | 7/25/2001 | 7/25/2001 | 7/25/2001 | A | PART |
Russ Owen
|
|
|
tim ###-####ok temp oc only , needs all per signatures and stairs have corrections.c/n on site. ok for temporary. 7/25/2001 5:08:42 PM
|
BLD-Final | 7/25/2001 | 7/25/2001 | 7/25/2001 | A | PART |
Russ Owen
|
|
|
tim ###-####ok temp oc only , needs all per signatures and stairs have corrections.c/n on site. ok for temporary. 7/25/2001 5:08:42 PM
|
FIRE-Final Inspection | 7/25/2001 | 7/25/2001 | 7/25/2001 | P | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK for temp Occ 7/25/2001 3:10:52 PM Move FDC Monitor Contr vlvs on back flow 7/25/2001 3:11:41 PM
|
FIRE-Final Inspection | 7/20/2001 | 7/23/2001 | 7/23/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 7/23/2001 3:46:16 PM
|
FIRE-Final Inspection | 7/19/2001 | 7/20/2001 | 7/20/2001 | P | CANC |
Rick Jackson
|
|
|
###-#### inspector #409 didn't have enough time to get to it 7/20/2001 3:58:21 PM
|
BLD-Final | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | FAIL |
Russ Owen
|
|
|
###-####. c/n posted also needs fire/life safety. 7/20/2001 3:33:01 PM
|
Code Occupancy Approval | | | 7/19/2001 | | FAIL |
|
|
|
Signed Temporary - have bonded $110,000 +/- on this project for landscaping. Signed temporary occupancy for building #4.
|
FIRE-Conference | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Joe Tawney
|
|
|
Conf with contr regarding signage for project 6/20/2001 12:01:07 PM
|
Override - Parcel Holds | | | 6/19/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/31/2001 | 6/1/2001 | 6/1/2001 | P | PASS |
Russ Owen
|
|
|
###-#### ok to sheetrock soffit. 1/4/2002 9:38:39 AM
|
Override - Parcel Holds | | | 5/31/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/30/2001 | | |
|
|
|
|
BLD-Energy code compliance | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PASS |
Russ Owen
|
|
|
John ###-#### ok to rock garages. 12/21/2001 1:56:02 PM
|
FIRE-Alarm Testing | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Conf with Lea Elect reg exit signs. Adv not req by code 5/22/2001 10:50:33 AM
|
Override - Parcel Holds | | | 5/18/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/18/2001 | | |
|
|
|
|
BLD-Energy code compliance | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | PASS |
Russ Owen
|
|
|
###-#### ok to sheetrock 12/16/2001 12:44:04 PM
|
BLD-Energy code compliance | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | FAIL |
Russ Owen
|
|
|
JOHN ALSO WANTS DRY NAILING INSPECTION ###-####
|
Override - Parcel Holds | | | 5/15/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/15/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PART |
Russ Owen
|
|
|
###-#### ok to add 2nd layer at req areas. 12/14/2001 4:43:48 PM
|
FIRE-Conference | 5/11/2001 | 5/14/2001 | 5/14/2001 | P | PASS |
Joe Tawney
|
|
|
Tim ###-#### Conf with Gen contr about alarm system 5/14/2001 2:07:53 PM
|
Override - Parcel Holds | | | 5/14/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/10/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Russ Owen
|
|
|
Tim ###-#### ok to i nsulate need some adnl caulking done . 12/11/2001 3:44:11 PM
|
Override - Parcel Holds | | | 5/11/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/10/2001 | | |
|
|
|
|
BLD-Energy code compliance | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PART |
Russ Owen
|
|
|
john ###-#### .need to re-insp addnl items noted with contractor. 12/8/2001 5:43:47 PM
|
Override - Parcel Holds | | | 5/8/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PART |
Russ Owen
|
|
|
john ###-#### 2/7/2001 12:00:19 PM 12/7/2001 12:00:30 PM ok to insulate need to firestop walls at floor lines. 12/7/2001 1:35:35 PM
|
BLD-Framing/Rough-in | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | FAIL |
Russ Owen
|
|
|
Tim ###-#### Building #4 12/4/2001 9:18:08 AM
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | PART |
Russ Owen
|
|
|
TIM ###-#### FR ok to cover ext walls only,needs ele before frame insp. 12/2/2001 9:20:09 AM
|
Override - Parcel Holds | | | 4/30/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/30/2001 | | |
|
|
|
|
BLD-Foundation | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | FAIL |
Dave Hannah
|
|
|
shear wall Kenneth ###-####crew covered up strapes they are going to uncover they also need to add bolts to mud plate and nail bottom plates on sec and third floors and nail strapes by stairs 4/27/2001 10:20:13 AM
|
BLD-Conference | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | PART |
Russ Owen
|
|
|
Tim ###-####
|
BLD-Conference | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | CANC |
Dave Hannah
|
|
|
tim ###-#### bldg #4
|
BLD-Conference | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PART |
Russ Owen
|
|
|
Tim ###-####
|
BLD-Concrete | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Foundation | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
Override - Parcel Holds | | | 2/5/2001 | | |
|
|
|
|
BLD-Footing | 1/25/2001 | 1/26/2001 | 1/26/2001 | A | PASS |
Russ Owen
|
|
|
ft insp tim ###-####
|
Override - Parcel Holds | | | 1/25/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/22/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/18/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/18/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/17/2001 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/17/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/17/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 9/20/2000 | | 1/17/2001 | | PASS |
Mike Phillips
|
|
|
1/17/2001 13:24:26 M_P - activity updated through activity BLDA022 from case BLD00-02809.
|
Routing - PLANNING | 1/8/2001 | 1/8/2001 | 1/9/2001 | | PASS |
|
|
|
Approved per CUP00-00061 & DRH00-00126.
|
Plan resubmittals received | | | 1/8/2001 | | DONE |
|
|
|
Received plan resubmittals, two sets from Jensen/Fey, forwarded same to Mike Phillips. 1/8/01 DAR
|
Plan Reviewer's activity | | | 12/28/2000 | | FAIL |
|
|
|
Additional information required for further review.
|
Routing - FIRE | 12/27/2000 | 12/27/2000 | 12/27/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 12/14/2000 | 12/18/2000 | 12/18/2000 | | FAIL |
Bill Alexander
|
|
|
Lack sprinkler water supply design criteria. Lack fire line supply information, taps, size, locations, etc.
|
Plan resubmittals received | | | 12/4/2000 | | DONE |
|
|
|
Received plan resubmittals from Jensen/Fey, forwasrded three sets to Mike Phillips. 12/5/00 dar
|
Routing - FIRE | 10/24/2000 | 10/27/2000 | 10/25/2000 | | FAIL |
Bill Alexander
|
|
|
Lack sufficient UFC, UBC related information.
|
Plan Review Completed(1st rev) | | | 10/25/2000 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/26/2000 | | 10/24/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
SECOND REVIEW REQUIRED MJP
|
Routing - PLAN CHECK | 10/10/2000 | | 10/24/2000 | | |
|
|
|
ROUTING TO FIRE.
|
Plan Reviewer's activity | | | 10/24/2000 | | FAIL |
|
|
|
ADDITIONAL INFORMATION REQUIRED FOR FURTHER REVIEW.
|
Routing - PLUMBING | 10/5/2000 | | 10/9/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 10/5/2000 | | 10/5/2000 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 9/28/2000 | | 10/5/2000 | | FAIL |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/28/2000 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/28/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/25/2000 | | HOLD |
|
|
|
WAITING FOR ON SITE FOUNDATION COPY OF PLANS. SPOKE WITH JAY BONNETT. HE IS SENDING ASAP. KMM
|
Received Certificate of Value | | | 9/25/2000 | | DONE |
|
|
|
|
Application received | | | 9/20/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 12/18/2000 | 12/18/2000 | | | |
|
|
|
took to mike p
|
Case Summary (BLD) | | | | | |
|
|
|
|
Routing - PUBLIC WORKS | 11/29/2000 | | | | |
|
|
|
|