Permit Information
Permit NumberBLD00-02811
StatusFinaled
Name LINGER LONGER LODGE APARTMENTS
Site Address 931 N MAPLE GROVE RD
Project NameLINGER LONGER LODGE AP
Customer Number 
ePlanReviewNo
Description
BUILDING # 5 - TYPE A * TO CONSTRUCT A NEW 22,292 SQ.FT., THREE STORY, WOOD FRAMED, 18 UNIT APARTMENT BUILDING. THE FIRST FLOOR IS 8,328 SQ,FT AND CONTAINS 6 GARAGES, TWO, TWO BEDROOM UNITS AND TWO ONE BEDROOM UNITS, THE SECOND FLOOR IS 8,514 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR, ONE BEDROOM UNITS. THE THIRD FLOOR IS 5,550 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS. ALL CONSTRUCTION PER THE APPROVED PLANS. NOTE: THIS BUILDING HAS A NFPA 13-R FIRE SPRINKLER SYSTEM. MJP DRH 99-126 CUP 00-00061 PC#765-00
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/23/2002  
Permanent Occupancy 11/16/200111/16/2001 DONE
Details
Permanent occupancy  11/16/2001 DONE
Perm. Occ. Cert. #8906 issued 11-16-01 to the Linger Longer Lodge Apts.
BLD-Final11/14/200111/15/200111/15/2001APASS
DetailsTom Arcoraci
###-#### ok for perm when others sign perm 11/15/2001 11:44:28 AM
Telephone call  11/8/2001 DONE
Talked w/John re: status of temp. occ.
BLD-Aging Inspection10/11/200110/11/200110/11/2001 PART
DetailsRuss Owen
Temporary occupancy  8/16/2001 DONE
Temp. Occ. Cert. #4576 issued 8-16-01 to the Linger Longer Lodge Apartments, Bldg. #5.
FIRE-Final Inspection8/9/20018/10/20018/10/2001APASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 8/10/2001 12:36:38 PM
BLD-Final8/9/20018/10/20018/10/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/09/2001 at 17:40:34. Contact: ###-####. Ok temp oc , c/n corrections posted, also other final oc signed job card. 8/10/2001 12:52:02 PM
FIRE-Final Inspection8/9/20018/9/20018/9/2001PFAIL
DetailsJoe Tawney
fire fn tim ###-#### Reinsp Fail Alarm system not programmed properly 8/9/2001 2:45:53 PM
BLD-Final8/9/20018/9/20018/9/2001PNR
DetailsRuss Owen
tim ###-#### fn occ
BLD-Final8/6/20018/7/20018/7/2001ANR
DetailsTom Arcoraci
###-####
BLD-Final8/7/20018/7/20018/7/2001PNR
DetailsRuss Owen
###-####
FIRE-Final Inspection8/3/20018/6/20018/6/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued. Alarm system tested OK 8/6/2001 11:36:57 AM
BLD-Framing/Rough-in6/11/20016/12/20016/12/2001APART
DetailsRuss Owen
John ###-####ok floor 1, 1st unit lower floor to the south fire caulk ele home run at front door, ok to rock others. 1/12/2002 1:59:54 PM
BLD-Energy code compliance6/11/20016/11/20016/11/2001PPASS
DetailsDave Hannah
john ###-#### floors 2&3 tower one bldg #1 6/11/2001 3:20:55 PM
Override - Parcel Holds  6/11/2001  
Override - Parcel Holds  6/11/2001  
BLD-Framing/Rough-in6/7/20016/7/20016/7/2001PPART
DetailsRuss Owen
John ###-#### see yellow marked areas for penetrations. 1/7/2002 4:22:14 PM
Override - Parcel Holds  6/7/2001  
BLD-Framing/Rough-in6/6/20016/6/20016/6/2001PPART
DetailsRuss Owen
shear john ###-#### 1/6/2002 5:14:08 PMint drywall. 1/6/2002 5:14:18 PM
Override - Parcel Holds  6/6/2001  
BLD-Energy code compliance5/31/20015/31/20015/31/2001PPASS
DetailsRuss Owen
John ###-####
Override - Parcel Holds  5/31/2001  
BLD-Framing/Rough-in5/30/20015/30/20015/30/2001PFAIL
DetailsRuss Owen
john ###-#### complete fire stoping. 12/30/2001 4:31:46 PM
Override - Parcel Holds  5/30/2001  
BLD-Framing/Rough-in5/25/20015/29/20015/29/2001PFAIL
DetailsRuss Owen
john ###-####
BLD-Energy code compliance5/25/20015/25/20015/25/2001PPART
DetailsDave Hannah
###-#### south half 5/25/2001 4:23:11 PM
Override - Parcel Holds  5/25/2001  
Override - Parcel Holds  5/25/2001  
BLD-Framing/Rough-in5/22/20015/23/20015/23/2001APART
DetailsRuss Owen
john ###-#### ok to insulate half of buiilding ,no corrections. 12/23/2001 3:48:00 PM
BLD-Framing/Rough-in5/22/20015/22/20015/22/2001PNR
DetailsRuss Owen
John ###-####
Override - Parcel Holds  5/22/2001  
Override - Parcel Holds  5/22/2001  
FIRE-Alarm Testing5/18/20015/21/20015/21/2001APASS
DetailsJoe Tawney
###-#### Conf with Lea Elect reg exit signs. Adv not req by code 5/22/2001 10:51:09 AM
BLD-Framing/Rough-in5/17/20015/18/20015/18/2001APART
DetailsRuss Owen
###-#### ok to install drop ceiling in 1,2 fllor of left side of complex. 12/18/2001 12:35:59 PM
Override - Parcel Holds  5/18/2001  
BLD-Framing/Rough-in5/17/20015/17/20015/17/2001PCANC
DetailsRuss Owen
###-####
Override - Parcel Holds  5/17/2001  
Override - Parcel Holds  5/17/2001  
BLD-Aging Inspection5/16/20015/16/20015/16/2001 PART
DetailsRuss Owen
This is an aging activity, working on apartments 12/16/2001 11:40:27 AM
BLD-Conference3/2/20013/2/20013/2/2001PPART
DetailsRuss Owen
###-####
BLD-Foundation2/15/20012/15/20012/15/2001APASS
DetailsRuss Owen
Added by Inspector: 407 On 2/15/2001 12:20:15 PM
BLD-Footing1/31/20012/1/20012/1/2001PPASS
DetailsRuss Owen
###-####
Override - Parcel Holds  1/31/2001  
Issue PAID IN FULL permit  1/22/2001 DONE
Inspection Record Card- Bld  1/18/2001 DONE
Print Occupancy Form  1/18/2001 DONE
Plan Reviewer's activity  1/17/2001 PASS
Print Pending Permit.LaserJet4  1/17/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/17/2001 DONE
Case Summary (BLD)  1/17/2001 DONE
Plan assigned to (M_P)9/20/2000 1/17/2001 PASS
DetailsMike Phillips
1/17/2001 13:37:07 M_P - activity updated through activity BLDA022 from case BLD00-02811.
Routing - PLANNING1/8/20011/8/20011/9/2001 PASS
Approved per CUP00-00061 & DRH00-00126.
Plan Reviewer's activity  12/28/2000 FAIL
Additional information required for further review.
Routing - FIRE12/27/200012/27/200012/27/2000 PASS
DetailsBill Alexander
Routing - FIRE12/14/200012/18/200012/18/2000 FAIL
DetailsBill Alexander
Lack sprinkler water supply design criteria. Lack fire line supply information, taps, size, locations, etc.
Routing - FIRE10/24/200010/27/200010/25/2000 FAIL
DetailsBill Alexander
Lack sufficient UFC, UBC related information.
Plan Review Completed(1st rev)  10/25/2000 FAIL
Routing Off Site - STRUCTURAL9/26/2000 10/24/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
SECOND REVIEW REQUIRED MJP
Routing - PLAN CHECK10/10/2000 10/24/2000  
ROUTING TO FIRE
Plan Reviewer's activity  10/24/2000 FAIL
ADDITIONAL INFORMATION REQUIRED FOR FURTHER REVIEW.
Routing - PLUMBING10/5/2000 10/9/2000 PASS
Routing - PLANNING10/5/2000 10/5/2000 FAIL
Routing - PUBLIC WORKS9/28/2000 10/5/2000 FAIL
REQUIRES STREET LIGHT PLAN PER BILL COLSON. 10/6/00 DAR
Received Certificate of Value  10/3/2000 DONE
ROUTED TWO COPIES TO MIKE P. PUT ONE IN FILE. KMM
Plans ACCEPTED BY PLAN TECH  9/28/2000 DONE
Plan routing begun/NEW & ADDTN  9/28/2000 DONE
Plans ACCEPTED BY PLAN TECH  9/25/2000 HOLD
WAITING FOR FOUNDATION ON SITE COPY. SPOKE WITH JAY BONNETT. HE IS SENDING ASAP. KMM
Waiting for Cert. of Value  9/25/2000 DONE
Application received  9/20/2000  
Plan routing begun/NEW & ADDTN    DONE
Routing - PUBLIC WORKS11/29/2000    
Case Summary (BLD)