BUILDING # 8 - TYPE A * (SECTION 1 OF 2) A TWO HOUR AREA SEPARATION WALL WILL DIVIDE THIS 16 UNIT APARTMENT BUILDING INTO TWO. TO CONSTRUCT A NEW 11,146 SQ.FT. THREE STORY APARTMENT BUILDING. THE FIRST FLOOR CONTAINS 9 GARAGES, ONE, TWO BEDROOM UNIT. THE SECOND FLOOR IS 4,257 SQ.FT AND CONTAINS TWO, TWO BEDROOM UNITS AND TWO, ONE BEDROOM UNITS. THE THIRD FLOOR IS 2,725 SQ.FT AND CONTAINS TWO, TWO BEDROOM UNITS. ALL CONSTRUCTION PER THE APPROVED PLANS. NOTE: THIS BUILDING IS FIRE SPRINKLERED WITH A NFPA 13-R RESIDENTIAL SPRINKLER SYSTEM AND CAN NOT BE USED FOR ANY CODE REDUCTIONS. REFER TO BLD 01 FOR OTHER SIDE OF THE AREA SEPARATION WALL. MJP DRH 99-126 CUP 00-00061 PC#765-00 ** PLAN MODIFICATION 5/15/01
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/30/20036/30/20036/30/2003 DONE
Case Summary (BLD)  1/23/2002  
Permanent Occupancy 12/6/200112/6/2001 DONE
Details
BLD-Final12/5/200112/6/200112/6/2001APASS
DetailsRuss Owen
Cathy has the card - all others have signed for perm.. ok perm oc. 12/6/2001 10:48:29 AM
Permanent occupancy  12/6/2001 DONE
Perm. Occ. Cert. #8935 issued 12-6-01 to the Linger Longer Lodge Apts., Bldg. 8 Sec. 1 of 2.
BLD-Final12/5/200112/5/200112/5/2001PCANC
DetailsRuss Owen
Scheduled by Inspector: 407 On 12/5/2001 3:46:23 PM
BLD-Aging Inspection11/28/200111/28/200111/28/2001 PART
DetailsRuss Owen
Fee Review-notes5/18/20015/18/200110/18/2001 DONE
5/18/01- split permits so had to split value and paid fees.
Temporary occupancy  10/1/2001 PART
Temp. Occ. Cert. #4607 issued 10-1-01 to the Linger Longer Lodge Apts.
BLD-Final9/28/20019/28/20019/28/2001PPART
DetailsRuss Owen
fn ###-####- john fn c/n posted ok for a temp oc. 9/28/2001 4:03:53 PM
FIRE-Final Inspection9/27/20019/27/20019/27/2001PPASS
DetailsJoe Tawney
fire fn john ###-####. Reinsp. OK permanent occ. 9/27/2001 3:51:29 PM
FIRE-Final Inspection9/19/20019/19/20019/19/2001PFAIL
DetailsJoe Tawney
Spklr system not completed. Could not test alarms 9/19/2001 2:07:02 PM
Print Occupancy Form  8/16/2001 DONE
Code Occupancy Approval  8/16/2001 TEMP
Temp approved, bond posted.
BLD-Framing/Rough-in7/30/20017/30/20017/30/2001PFAIL
DetailsRuss Owen
###-#### ok to start rock except 2hr walls c/ns. 7/30/2001 3:00:40 PM
BLD-Framing/Rough-in7/11/20017/11/20017/11/2001PFAIL
DetailsRuss Owen
John ###-####need 2hr (after the fact) wall to be continous through all areas. 7/11/2001 4:27:43 PM
BLD-Framing/Rough-in7/2/20017/3/20017/3/2001APART
DetailsRuss Owen
john ###-####.c/n for 2 hr area separation wall. 7/3/2001 12:25:18 PM
BLD-Framing/Rough-in7/2/20017/3/20017/3/2001APART
DetailsRuss Owen
john ###-#### exterior shear
BLD-Framing/Rough-in6/27/20016/28/20016/28/2001APART
DetailsRuss Owen
partial framing shear wall tim ###-#### ok to side 6/28/2001 11:26:35 AM
Receive PAYMENT IN FULL  6/27/2001 DONE
CHANGE STATUS TO (ISS)  6/27/2001 DONE
Print Occupancy Form  5/23/2001 DONE
Override - Parcel Holds  5/23/2001  
Inspection Record Card- Bld  5/23/2001 DONE
FIRE-Alarm Testing5/18/20015/21/20015/21/2001APASS
DetailsJoe Tawney
###-#### Conf with Lea Elect reg exit signs. Adv not req by code 5/22/2001 10:49:56 AM
Override - Parcel Holds  5/18/2001  
Plan assigned to (M_P)4/26/2001 5/15/2001 PASS
DetailsMike Phillips
5/15/2001 10:55:51 M_P - activity updated through activity BLDA022 from case BLD00-02815.
Plan Reviewer's activity  5/15/2001 PASS
Plan modification approved.
Override - Parcel Holds  5/15/2001  
Print Pending Permit.LaserJet4  5/15/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/15/2001 DONE
CHANGE STATUS TO (PND)  4/26/2001 DONE
per kathy miller/plan modification/mls
Plans ACCEPTED BY PLAN TECH  4/26/2001 DONE
Plan modification - two hour wall
Received Certificate of Value  4/26/2001 DONE
Plan modification
BLD-Concrete3/30/20014/2/20014/2/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/30/2001 at 16:29:27. Contact: ###-####.
BLD-Foundation3/14/20013/15/20013/15/2001PPART
DetailsRuss Owen
###-####ext walls. 3/15/2001 1:00:04 PM
BLD-Foundation3/9/20013/12/20013/12/2001PPASS
DetailsRuss Owen
###-####ext footings ok, also approved by soils engineer. 3/12/2001 2:36:20 PM
Override - Parcel Holds  2/2/2001  
Issue PAID IN FULL permit  2/2/2001 DONE
Plan Reviewer's activity  1/18/2001 PASS
Print Pending Permit.LaserJet4  1/18/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/18/2001 DONE
Case Summary (BLD)  1/18/2001 DONE
Inspection Record Card- Bld  1/18/2001 DONE
Print Occupancy Form  1/18/2001 DONE
Plan assigned to (M_P)9/20/2000 1/18/2001 PASS
DetailsMike Phillips
1/18/2001 08:33:52 M_P - activity updated through activity BLDA022 from case BLD00-02815.
Routing - PLANNING1/8/20011/8/20011/9/2001 PASS
Approved per CUP00-00061 & DRH00-00126.
Plan Reviewer's activity  12/28/2000 FAIL
Additional information required for further review.
Routing - FIRE12/27/200012/27/200012/27/2000 PASS
DetailsBill Alexander
Routing - FIRE12/14/200012/18/200012/18/2000 FAIL
DetailsBill Alexander
Lack sprinkler water supply design criteria. Lack fire line supply information, taps, size, locations, etc.
Routing - FIRE10/24/200010/27/200010/25/2000 FAIL
DetailsBill Alexander
Lack sufficient UFC, UBC related information.
Plan Review Completed(1st rev)  10/25/2000 FAIL
Routing - PLAN CHECK10/10/2000 10/24/2000  
ROUTING TO FIRE
Routing Off Site - STRUCTURAL9/26/2000 10/24/2000 FAIL
CONTACTED PDQ TO TAKE TO OUTSIDE ENG. KMM
SECOND REVIEW REQUIRED MJP
Plan Reviewer's activity  10/24/2000 FAIL
ADDITIONAL INFORMATION REQUIRED FOR FURTHER REVIEW.
Routing - PLUMBING10/5/2000 10/9/2000 PASS
Routing - PUBLIC WORKS9/28/2000 10/6/2000 FAIL
Routing - PLANNING10/5/2000 10/5/2000 FAIL
Plan routing begun/NEW & ADDTN  9/28/2000 DONE
Plans ACCEPTED BY PLAN TECH  9/28/2000 DONE
Plans ACCEPTED BY PLAN TECH  9/25/2000 HOLD
WAITING FOR ON SITE FOUNDATION COPY OF PLANS. SPOKE WITH JAY BONNETT. HE IS SENDING ASAP. KMM
Received Certificate of Value  9/25/2000 DONE
Application received  9/20/2000  
Routing - PLAN CHECK12/18/200012/18/2000   
took to mike p
Routing - PUBLIC WORKS11/29/2000    
Case Summary (BLD)     
Routing - PLAN CHECK4/26/2001    
Plan modification