Fee Review-notes | 7/1/2003 | 7/1/2003 | 7/1/2003 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/23/2002 | | |
|
|
|
|
Permanent occupancy | | | 12/5/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8929 issued 12-5-01 to the Linger Longer Lodge Apts.
|
BLD-Final | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | PASS |
Russ Owen
|
|
|
JOHN ###-#### ok perm oc. 11/29/2001 2:36:28 PM
|
Permanent Occupancy | | 11/29/2001 | 11/29/2001 | | DONE |
|
|
|
|
BLD-Final | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### john
|
FIRE-Final Inspection | 11/26/2001 | 11/27/2001 | 11/27/2001 | A | PASS |
Troy Cobbley
|
|
|
Life/safety finaled. OK for perm occ. 11/27/2001 9:44:27 AM
|
BLD-Final | 11/27/2001 | 11/27/2001 | 11/27/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/27/2001 at 09:49:03. Contact: ###-####.ok temp oc c/n posted. 11/27/2001 4:14:29 PM
|
FIRE-Final Inspection | 11/20/2001 | 11/21/2001 | 11/21/2001 | A | FAIL |
Troy Cobbley
|
|
|
Install "no parking" signs on south side landscaping and at the front entrance, adjust all doors on building #6, 11/21/2001 8:32:54 AM 11/21/2001 8:36:34 AM
|
BLD-Framing/Rough-in | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | FAIL |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### john
|
BLD-Framing/Rough-in | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | PART |
Russ Owen
|
|
|
###-####- tim ok to cover . @nd level inside units have a chase with multiple line sets in and need fire caulking at the top . 9/18/2001 4:41:55 PM
|
BLD-Energy code compliance | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PART |
Russ Owen
|
|
|
john ###-#### need top of a chase at 2 nd level completed. 9/13/2001 8:58:52 AM
|
BLD-Framing/Rough-in | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PART |
Russ Owen
|
|
|
###-#### JOHN ok to insulate c/n. 8/31/2001 4:12:09 PM
|
BLD-Framing/Rough-in | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | PART |
Russ Owen
|
|
|
###-#### john
|
Code Occupancy Approval | | | 8/16/2001 | | TEMP |
|
|
|
Temp approved, bond posted.
|
BLD-Framing/Rough-in | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Russ Owen
|
|
|
shear wall ###-####
|
BLD-Framing/Rough-in | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | FAIL |
Russ Owen
|
|
|
ext shear 7/6/2001 3:50:33 PM
|
FIRE-Alarm Testing | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Conf with Lea Elect on req for exit signs. Adv not req by code 5/22/2001 10:46:32 AM
|
Override - Parcel Holds | | | 5/18/2001 | | |
|
|
|
|
BLD-Concrete | 5/10/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Russ Owen
|
|
|
Tim ###-####
|
Override - Parcel Holds | | | 5/10/2001 | | |
|
|
|
|
BLD-Concrete | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | NR |
Russ Owen
|
|
|
###-####
|
BLD-Concrete | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | NR |
Russ Owen
|
|
|
###-#### bld #6
|
Override - Parcel Holds | | | 5/8/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/8/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 5/4/2001 | | |
|
|
|
|
BLD-Foundation | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | PASS |
Dave Hannah
|
|
|
tim ###-#### bldg #6
|
BLD-Foundation | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | CANC |
Russ Owen
|
|
|
Tim ###-####
|
Override - Parcel Holds | | | 2/2/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/2/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/18/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 9/20/2000 | | 1/18/2001 | | PASS |
Mike Phillips
|
|
|
1/18/2001 08:56:34 M_P - activity updated through activity BLDA022 from case BLD00-02820.
|
Inspection Record Card- Bld | | | 1/12/2001 | | DONE |
|
|
|
GOT PERMITS READY NO PLANS PER RAD, MYS, TIM AND JEFF
|
Print Occupancy Form | | | 1/12/2001 | | DONE |
|
|
|
|
Routing - PLANNING | 1/8/2001 | 1/8/2001 | 1/9/2001 | | PASS |
|
|
|
Approved per CUP00-00061 & DRH00-00126.
|
Plan Reviewer's activity | | | 12/28/2000 | | FAIL |
|
|
|
Additional information required for further review.
|
Routing - FIRE | 12/27/2000 | 12/27/2000 | 12/27/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 12/14/2000 | 12/18/2000 | 12/18/2000 | | FAIL |
Bill Alexander
|
|
|
Lack sprinkler water supply design criteria. Lack fire line supply information, taps, size, locations, etc.
|
Routing - FIRE | 10/24/2000 | 10/27/2000 | 10/25/2000 | | FAIL |
Bill Alexander
|
|
|
Lack sufficient UFC, UBC related information.
|
Plan Review Completed(1st rev) | | | 10/25/2000 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 10/10/2000 | | 10/24/2000 | | |
|
|
|
ROUTING TO FIRE
|
Routing Off Site - STRUCTURAL | 9/26/2000 | | 10/24/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
SECOND REVIEW REQUIRED MJP
|
Plan Reviewer's activity | | | 10/24/2000 | | FAIL |
|
|
|
ADDITIONAL INFORMATION REQUIRED FOR FURTHER REVIEW.
|
Routing - PLUMBING | 10/5/2000 | | 10/9/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 10/5/2000 | | 10/5/2000 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 9/28/2000 | | 10/5/2000 | | FAIL |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/28/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/28/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/25/2000 | | HOLD |
|
|
|
WAITING FOR ON SITE FOUNDATION COPY OF PLANS. SPOKE WITH JAY BONNETT. HE IS SENDING ASAP KMM
|
Received Certificate of Value | | | 9/25/2000 | | DONE |
|
|
|
|
Application received | | | 9/20/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 12/18/2000 | 12/18/2000 | | | |
|
|
|
took to mike p
|
Routing - PUBLIC WORKS | 11/29/2000 | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|