Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD00-02822
StatusFinaled
Name ROMAN CATHOLIC DIOCESE OF
Site Address 945 N MAPLE GROVE RD
Project NameLINGER LONGER LODGE AP
Customer Number 
ePlanReviewNo
Description
BUILDING # 1 - TYPE C * TO CONSTRUCT A NEW 23,060 SQ.FT., THREE STORY, WOOD FRAMED, 24 UNIT APARTMENT BUILDING. THE FIRST FLOOR IS 7,688 SQ,FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR THREE BEDROOM UNITS, THE SECOND FLOOR IS 7,200 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR, THREE BEDROOM UNITS. THE THIRD FLOOR IS 7,200 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR ONE BEDROOM UNITS. ALL CONSTRUCTION PER THE APPROVED PLANS. NOTE: THIS BUILDING HAS A NFPA 13-R FIRE SPRINKLER SYSTEM. MJP DRH 99-126 CUP 00-00061 PC#765-00
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/1/20037/1/20037/1/2003 DONE
DOC - Permit Finaled12/11/200212/11/200212/11/2002PPASS
DetailsRuss Owen
Finaled by inspector at 12/11/2002 6:02:41 PM
BLD-Aging Inspection12/11/200212/11/200212/11/2002 CANC
DetailsRuss Owen
Case Summary (BLD)  1/23/2002  
Permanent occupancy  12/10/2001 DONE
Perm. Occ. Cert. #8952 issued 12-10-02 to the Linger Longer Lodge Apts.
FIRE-Final Inspection12/5/200112/6/200112/6/2001APASS
DetailsTroy Cobbley
Life/safety finaled 12/5/2001 5:02:25 PM
Permanent Occupancy 12/6/200112/6/2001 DONE
Details
BLD-Final11/20/200111/21/200111/21/2001APASS
DetailsTom Arcoraci
JOHN ###-#### ok for perm occ 11/21/2001 10:01:04 AM
BLD-Aging Inspection10/22/200110/22/200110/22/2001 PART
DetailsRuss Owen
Temporary occupancy  10/2/2001 PART
Temp. Occ. Cert. #4606 issued 10-1-01 to the Linger Longer Lodge Apts.
BLD-Final8/20/20018/21/20018/21/2001AFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/20/2001 9:15:06 PM needs lock set on doors for temp also c/n other items. 8/21/2001 4:28:55 PM
BLD-Final8/21/20018/21/20018/21/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/21/2001 5:27:07 PM ok temp oc c/n posted at site. 8/21/2001 5:29:53 PM
BLD-Final8/18/20018/20/20018/20/2001ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/18/2001 at 15:45:47. Contact: ###-####.. needs all signatures on job card. 8/20/2001 3:49:21 PM
BLD-Final8/20/20018/20/20018/20/2001PCANC
DetailsRuss Owen
###-#### john
BLD-Final8/20/20018/20/20018/20/2001PPART
DetailsJoe Tawney
Added by Inspector: 406 On 8/20/2001 3:24:05 PM Reinsp OK for temporary occupancy pending approval of resubmittal of additional mimi horns
BLD-Final8/20/20018/20/20018/20/2001ACANC
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/20/2001 4:34:06 PM
Code Occupancy Approval  8/16/2001 TEMP
Temp Approved, Bond posted.
BLD-Framing/Rough-in6/29/20016/29/20016/29/2001PPART
DetailsRuss Owen
John ###-####. ok to sheetrock drop soffit. 6/29/2001 4:18:28 PM
BLD-Energy code compliance6/14/20016/15/20016/15/2001APART
DetailsRuss Owen
###-####ok to drywall sec 1/2 1/15/2002 1:21:59 PM
Override - Parcel Holds  6/14/2001  
BLD-Framing/Rough-in6/11/20016/12/20016/12/2001APART
DetailsRuss Owen
John ###-####ok to insulate 2 areas in green require repair. 1/12/2002 2:00:24 PM
Override - Parcel Holds  6/11/2001  
BLD-Framing/Rough-in6/5/20016/6/20016/6/2001AFAIL
DetailsRuss Owen
John ###-####
Override - Parcel Holds  6/5/2001  
BLD-Framing/Rough-in5/23/20015/24/20015/24/2001APART
DetailsDave Hannah
shear wall John ###-#### ok to cover ext walls all but for the two ends problems with straps 5/24/2001 12:36:53 PM
Override - Parcel Holds  5/23/2001  
FIRE-Alarm Testing5/18/20015/21/20015/21/2001APASS
DetailsJoe Tawney
###-#### Conf with Lea Elect reg exit signs. Adv not req by code 5/22/2001 10:51:50 AM
Override - Parcel Holds  5/18/2001  
BLD-Aging Inspection5/16/20015/16/20015/16/2001 PART
DetailsRuss Owen
This is an aging activity working on apartments 12/16/2001 11:41:22 AM
BLD-Concrete3/14/20013/15/20013/15/2001APART
DetailsRuss Owen
###-####
BLD-Foundation2/19/20012/20/20012/20/2001PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/19/2001 at 15:10:30. Contact: ###-####. stem walls for bldg. no. one 2/20/2001 4:13:33 PM
BLD-Footing2/8/20012/9/20012/9/2001AFAIL
DetailsJim Sly
###-#### Discrepancy on plans for footing rebar.....Need stamped letter for clarification from Eng prior to pour. 2/9/2001 9:26:43 AM
Override - Parcel Holds  2/8/2001  
Override - Parcel Holds  2/2/2001  
Override - Parcel Holds  2/2/2001  
Issue PAID IN FULL permit  2/2/2001 DONE
Plan Reviewer's activity  1/18/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  1/18/2001 DONE
Plan assigned to (M_P)9/20/2000 1/18/2001 PASS
DetailsMike Phillips
1/18/2001 08:57:03 M_P - activity updated through activity BLDA022 from case BLD00-02822.
Inspection Record Card- Bld  1/12/2001 DONE
GOT PERMIT READY EARLY NO PLANS\ RAD, MYS, TIM AND JEFF
Print Occupancy Form  1/12/2001 DONE
Routing - PLANNING1/8/20011/8/20011/9/2001 PASS
Approved per CUP00-00061 & DRH00-00126.
Plan Reviewer's activity  12/28/2000 FAIL
Additional information required for further review.
Routing - FIRE12/27/200012/27/200012/27/2000 PASS
DetailsBill Alexander
Routing - FIRE12/14/200012/18/200012/18/2000 FAIL
DetailsBill Alexander
Lack sprinkler water supply design criteria. Lack fire line supply information, taps, size, locations, etc.
Routing - PLAN CHECK10/10/2000 12/14/2000  
routing to fire
Routing - FIRE10/24/200010/27/200010/25/2000 FAIL
DetailsBill Alexander
Lack sufficient UFC, UBC related information.
Plan Review Completed(1st rev)  10/25/2000 FAIL
Application received  10/24/2000  
ROUTING TO FIRE
Routing Off Site - STRUCTURAL9/26/2000 10/24/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
SECOND REVIEW REQUIRED. MJP
Plan Reviewer's activity  10/24/2000 FAIL
ADDITIONAL INFORMATION REQUIRED FOR FURTHER REVIEW.
Routing - PLUMBING10/5/2000 10/9/2000 PASS
Routing - PUBLIC WORKS9/28/2000 10/6/2000 FAIL
REQUIRES STREET LIGHT PLAN, PER BILL COLSON. 10/6/00 DAR
Routing - PLANNING10/5/2000 10/5/2000 FAIL
Plan routing begun/NEW & ADDTN  9/28/2000 DONE
Plans ACCEPTED BY PLAN CHECK  9/28/2000 DONE
Plans ACCEPTED BY PLAN TECH  9/25/2000 HOLD
WAITING FOR ON SITE FOUNDATION SET. TALKED WITH CIVIL ENG JAY BONNETT. HE IS SENDING A COPY. KMM
Received Certificate of Value  9/25/2000 DONE
Plan resubmittals received  9/22/2000 DONE
STRUCTURAL PLAN SUBMITTALS RECEIVED J.R.BONNETT WITH STRUCTURAL CACULATIONS, FORWARDED SAME TO MIKE PHILLIPS. . 9/22/00 DAR RECEIVED FIVE COPIES OF REVISED SHEETS S1.1, S1.2, S1.3, S1.4, S1.5, S1.6, S1.7, S1.8, S1.10, S1.11, S.12 AND ONE COPY OF REVISED CALCS. PUT TWO WITH PLANS AND REST IN HOLD BOX. KMM
Routing - PLAN CHECK12/18/200012/18/2000   
took to mike phillips
Routing - PUBLIC WORKS11/29/2000    
Case Summary (BLD)     
Routing - PLAN CHECK1/9/2001