Case Summary (BLD) | | | 9/3/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/9/2009 | | |
|
|
|
|
Fee Review-notes | 7/1/2003 | 7/1/2003 | 7/1/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 7/6/2001 | 7/6/2001 | | DONE |
|
|
|
|
BLD-Final | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Russ Owen
|
|
|
###-#### EXT 225 ok for permanent oc. 7/6/2001 12:59:39 PM
|
Permanent occupancy | | | 7/6/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8748 issued 7-6-01 to the Sonic Drive-In.
|
BLD-Final | 7/3/2001 | 7/5/2001 | 7/5/2001 | A | NR |
Russ Owen
|
|
|
Final - reinspect - Cathy has the card. ACHD has signed perm oc, now need prior c/n addressed. 7/5/2001 3:20:46 PM
|
Telephone call | | | 6/22/2001 | | DONE |
|
|
|
Called & talked to Skip re: final extension of temp. expires 7-16-01 for completion of ACHD requirements.
|
Conference | 5/18/2001 | 5/18/2001 | 5/18/2001 | | DONE |
|
|
|
Tim Hogland has approved a 60 day extension on the temp. occ. for the Sonic Drive In thru 7-16-01.
|
Code Occupancy Approval | | | 3/27/2001 | | PASS |
|
|
|
Meets compliance - Signed Final (Release Bond)
|
Temporary occupancy | | | 2/16/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4516 issued 2-16-01 to the Sonic Drive-In.
|
FIRE-Final Inspection | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PASS |
Joe Tawney
|
|
|
Rod ###-#### Reinsp OK FOR PERMANANT OCCUPANCY 2/16/2001 8:14:03 AM
|
BLD-Final | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | FAIL |
Russ Owen
|
|
|
rod ###-####needs achd,also c/n items for canopy posted at the site. 2/15/2001 4:43:32 PM
|
Code Occupancy Approval | | | 2/14/2001 | | FAIL |
|
|
|
NO LAND SCAPE IN PLACE, BOND WAS POSTED OF $10,000 SO TEMPORARY OCCUPANCY SIGNED OFF.
|
FIRE-Final Inspection | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### ###-#### Final Fail C/N issued 2/13/2001 8:18:10 AM
|
BLD-Framing/Rough-in | 2/6/2001 | 2/7/2001 | 2/7/2001 | A | PASS |
Russ Owen
|
|
|
###-####grid ceiling 2/7/2001 9:16:55 AM
|
BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 | A | PART |
Russ Owen
|
|
|
###-#### shaft for hoods
|
BLD-Framing/Rough-in | 1/17/2001 | 1/18/2001 | 1/18/2001 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### cn issued on shaft 1/18/2001 10:38:02 AM
|
BLD-Framing/Rough-in | 1/10/2001 | 1/11/2001 | 1/11/2001 | A | PASS |
Russ Owen
|
|
|
Rod ###-####
|
BLD-Framing/Rough-in | 1/9/2001 | 1/9/2001 | 1/9/2001 | P | PASS |
Russ Owen
|
|
|
rod ###-####
|
BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Russ Owen
|
|
|
FR INSP- ROD ###-#### ok to insulate,fireblock reqd. 1/8/2001 4:06:39 PM nd 1/8/2001 4:06:44 PM 1/8/2001 4:06:59 PM
|
BLD-Framing/Rough-in | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | PART |
Russ Owen
|
|
|
shear insp ###-####ok to side. 1/4/2001 4:55:54 PM
|
BLD-Framing/Rough-in | 12/20/2000 | 12/20/2000 | 12/20/2000 | A | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 12/20/2000 2:41:24 PM conference,pre-insp.
|
BLD-Concrete | 12/6/2000 | 12/7/2000 | 12/7/2000 | A | PART |
Dave Hannah
|
|
|
###-####
|
BLD-Concrete | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Foundation | 11/22/2000 | 11/22/2000 | 11/22/2000 | P | PART |
Dave Hannah
|
|
|
rebar Rod ###-#### part 11/22/2000 1:08:24 P 11/22/2000 1:08:49 PM
|
(F) Reprint permit | | | 11/8/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/7/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/7/2000 | | DONE |
|
|
|
called permit ready
|
Issue PAID IN FULL permit | | | 11/7/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 9/22/2000 | | 11/7/2000 | | PASS |
Mike Otto
|
|
|
11/7/2000 15:11:49 MLO - activity updated through activity BLDA022 from case BLD00-02840.
|
Routing - PLANNING | 10/13/2000 | | 11/7/2000 | | PASS |
|
|
|
Approved per DRH00-192.
|
Routing - PLANNING | 11/6/2000 | | 11/7/2000 | | PASS |
|
|
|
route back to Martin for final approval
|
Routing - FIRE | 11/2/2000 | 11/6/2000 | 11/6/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 11/6/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/20/2000 | | 11/2/2000 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 10/16/2000 | | FAIL |
|
|
|
GRADING PERMIT ONLY
|
Routing - PLUMBING | 10/11/2000 | | 10/13/2000 | | PASS |
|
|
|
ROUTE BACK TO PLANNING MARTY WHEN BACK FROM PLUMBING. KMM max. trap arm is 6' on 3" waste, vent upstream of interceptor is not required if installed it must not connect to required vent below grade. water lines to P-5 and prep. sink in exterior wall must be protected from freezing, additional cross connection protection may be required, if an automatic soap dispensor is installed provide a water supply for it.
|
Routing - PUBLIC WORKS | 10/11/2000 | | 10/11/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 10/4/2000 | | 10/11/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/27/2000 | | 10/4/2000 | | FAIL |
|
|
|
REQUIRES GEOTECH REPORT ACCORDING TO BRIAN MURPHY. 10/4/00 DAR
|
Received Certificate of Value | | | 9/27/2000 | | DONE |
|
|
|
PROJECT VALUE $241,645 ELECT. $48,777 PLUMB. $20,000 MECH. $46,4999 FIRE SPRINKLER AND FIRE ALARM SYSTEMS N/A KMM
|
Plan routing begun/NEW & ADDTN | | | 9/27/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/27/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/22/2000 | | HOLD |
|
|
|
REQUIRES 1. SIGNED ARCH/ENG FORM
2. PROJECT DISCRIPTION AND SPRINKLER INFORMATION
3. REQUIRES TWO EXTRA COPIES WITH DRAINAGE CALCULATIONS
4. I DID NOT SEE ANY REFERENCE TO LANDSCAPING.
FAXED AND LEFT MESSAGE WITH JENNIFER. KMM
|
Waiting for Cert. of Value | | | 9/22/2000 | | DONE |
|
|
|
WAITING FOR REVISED CERT. OF VALUE. DUE TO GRADING PERMIT REQUEST. KMM
|
Application received | | | 9/22/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|