FIRE-Final Inspection | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | CANC |
Joe Tawney
|
|
|
phil ###-#### fire fn Cancel History shows permit signed off. Contr will call Rick to verify 4/30/2001 4:43:19 PM
|
Fee Review-notes | 9/25/2000 | 9/25/2000 | 3/15/2001 | | DONE |
|
|
|
additional fees from additional values
|
Permanent occupancy | | | 2/8/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8565 issued 2-8-01 to the Linen Barn.
|
Permanent Occupancy | | 2/7/2001 | 2/7/2001 | | DONE |
|
|
|
|
BLD-Final | 2/5/2001 | 2/6/2001 | 2/6/2001 | P | PASS |
Jim Storey
|
|
|
I have the occ. card - all others have signed off.
|
FIRE-Final Inspection | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 2/5/2001 1:39:46 PM fire alarm duct detectors complete per FIR00-00677 2/5/2001 1:40:32 PM
|
Conference | 1/29/2001 | 1/29/2001 | 1/29/2001 | | PART |
|
|
|
Called regarding current status of temp. occ. - 45 day notice
|
Temporary occupancy | | | 12/19/2000 | | PART |
|
|
|
Temp. Occ. #4091 issued 12-19-00 to the Linen Barn.
|
FIRE-Final Inspection | 12/8/2000 | 12/8/2000 | 12/8/2000 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/8/2000 11:12:53 AM awaiting plans for the duct detectors
|
BLD-Final | 12/6/2000 | 12/7/2000 | 12/7/2000 | A | PART |
Jim Storey
|
|
|
FN OCC ###-#### -PHIL ok pending fire signoff. 12/7/2000 10:52:24 AM
|
FIRE-Final Inspection | 12/6/2000 | 12/7/2000 | 12/7/2000 | A | FAIL |
Rick Jackson
|
|
|
PHIL ###-#### FIRE FN /// need to hang extinguisher in stockroom; replace painted sprinkler heads; duct detectors aren't tied into the fire alarm panel 12/7/2000 10:09:22 AM
|
BLD-Framing/Rough-in | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | PASS |
Jim Storey
|
|
|
Phil ###-#### need racking info. for lateral design zone 2b/screws in top leg of ceilling rafter n/w storeroom./duct dector for hvac uints if total is over 2000 cfm. 11/17/2000 10:53:47 AM
|
Routing - FIRE | 11/14/2000 | 11/14/2000 | 11/14/2000 | | DONE |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 11/14/2000 | 11/14/2000 | 11/14/2000 | | PASS |
|
|
|
PLANS APPROVED AS NOTED AND PER ATTACHED PLAN REVIEW COMMENTS, A PART OF THE APPROVED PLANS.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2000 | | PASS |
|
|
|
ROUTED TO PERMIT DESK FOR ISSUANCE.
|
Inspection Record Card- Bld | | | 11/14/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/14/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2000 | | DONE |
|
|
|
talked to pat mckeegan gave dollar amount
|
Issue PAID IN FULL permit | | | 11/14/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/3/2000 | | 11/14/2000 | | PEND |
|
|
|
PENDING FIRE DEPARTMENT APPROVAL. HAND CARRYING PLANS TO BILL ALEXANDER FOR COMMENTS.
|
Plan Review Completed(1st rev) | | | 11/14/2000 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 10/3/2000 | | 11/14/2000 | | PASS |
Dan Stuart
|
|
|
11/14/2000 09:15:13 DRS - activity updated through activity BLDA022 from case BLD00-02871.
|
Telephone call | | | 11/13/2000 | | DONE |
|
|
|
Talked with Phil of Simplot construction concerning the existing tiole room location versus the location indicated on the plans by the architect. Phil went to the site and verified the restroom doors swing out as indicated on original 1993 / 94 plans and not as shown on architects rendition. I had ask Pat McKeegan concerning the layout of the restrooms & conditions shown on plans submitted. He said he would check his measurements again. I recied a fax from his office of the existing layout as verified by the contractor.The length nor width of the restroom as built matches the architects submittal. The location of the interior walls in relation to the existing plans on file are at variance. Most of the different wall will be removed so this matter will be irrelivant.
|
Plan Reviewer's activity | | | 11/13/2000 | | |
|
|
|
Researched file to see who previous rtenants were and if thier projects ahd been finaled and received certificates of occupancy. The "FAMOUS BRANDS HOUSEWARES" @ 6910 Eisenman, C.O. #5818 and "BARBIZON" @ 6914 Eisenman, C.O. #5819, were issued on 4/25/95.
|
Plan routing begun/TENANTS | | | 10/3/2000 | | DONE |
|
|
|
Route to PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 9/27/2000 | | DONE |
|
|
|
|
Application received | | | 9/25/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/25/2000 | | DONE |
|
|
|
|