BLD-Final | 9/14/2001 | 9/17/2001 | 9/17/2001 | A | NR |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/14/2001 9:48:14 AM
|
BLD-Final | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/17/2001 11:46:40 AM
|
DOC - Permit Finaled | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 9/17/2001 3:21:20 PM
|
BLD-Final | 9/13/2001 | 9/13/2001 | 9/13/2001 | P | NR |
Tony Young
|
|
|
Al ###-#### 9/13/2001 11:22:18 AM
|
Case Summary (BLD) | | | 9/5/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 9/5/2001 | | DONE |
|
|
|
|
BLD-Final | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | FAIL |
Tony Young
|
|
|
Jeff ###-####
c/n posted 8/31/2001 10:20:42 AM
|
BLD-Final | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PART |
Tony Young
|
|
|
jeff ###-####///code 9989 8/31/2001 9:35:31 AMc/n posted on natural light 1203 ubc, other items will be ok 8/31/2001 3:31:24 PM
|
FIRE-Final Inspection | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/31/2001 2:49:31 PM
|
BLD-Aging Inspection | 7/18/2001 | 7/18/2001 | 7/18/2001 | | PASS |
Tony Young
|
|
|
wip 7/18/2001 8:58:49 AM
|
BLD-Energy code compliance | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PASS |
Tony Young
|
|
|
Jeff ###-#### or ###-####
c/n made ok, ok to rock (and roll) 5/18/2001 9:11:58 AM
|
BLD-Framing/Rough-in | 5/14/2001 | 5/15/2001 | 5/15/2001 | P | PART |
Tony Young
|
|
|
Jeff ###-####
still some items on correction notice, ok to insulate 5/16/2001 8:22:19 AM
|
BLD-Framing/Rough-in | 5/11/2001 | 5/14/2001 | 5/14/2001 | A | PART |
Tony Young
|
|
|
###-####
c/ n posted, ok to insulate 5/14/2001 11:47:41 AM
|
(F) Reprint permit | | | 5/9/2001 | | DONE |
|
|
|
|
FIRE-Sprinkler Rough-in | 5/3/2001 | 5/3/2001 | 5/3/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 5/3/2001 10:19:47 AM okay to cover
|
BLD-Framing/Rough-in | 4/30/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Tony Young
|
|
|
ext. shear ok to cover 5/2/2001 10:19:29 AM
|
BLD-Framing/Rough-in | 4/30/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Tony Young
|
|
|
ext. shear ok to cover 5/2/2001 10:19:29 AM
|
BLD-Framing/Rough-in | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | PART |
Tony Young
|
|
|
shear wall ###-####
ok to cover ext. walls that do not have any hold-downs, verbal corrections on nailing 4/13/2001 3:54:39 PM
|
BLD-Footing | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | PART |
Tony Young
|
|
|
###-####
ftgs for garage ok,, ok to pour walls monday, we are off 2/16/2001 10:47:16 AM
|
BLD-Foundation | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | PART |
Tony Young
|
|
|
Jeff ###-####
day light basement 2' walls ok and where they step down from 8' , wip 2/9/2001 10:27:26 AM
|
BLD-Foundation | 2/2/2001 | 2/5/2001 | 2/5/2001 | A | PART |
Tony Young
|
|
|
###-#### or Rob ###-####
wip, west basement wall, ok w/ verbal corrections 2/5/2001 12:16:57 PM
|
BLD-Footing | 1/30/2001 | 1/31/2001 | 1/31/2001 | P | PART |
Carl Dependahl
|
|
|
Jeff ###-####, PEND ENG'S LETTER/SOILS OK...LOOKS OK 1/31/2001 4:55:26 PM
|
BLD-Footing | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PART |
Tony Young
|
|
|
###-#### Jeff
part of basement wall ftg., west side, wip ok w/ verbal corrections 1/24/2001 4:01:38 PM
|
BLD-Foundation | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 11:05:52. Contact: ###-####.
retaining wall foundation,all foundation on west side ok w/ verbal corrections 1/9/2001 10:23:43 AM
|
BLD-Footing | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 1/4/2001 4:14:44 PM
wip on west retaining and foundation footing,, recvd letter from soil eng. 1/5/2001 9:41:04 AM
|
BLD-Footing | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | FAIL |
Tony Young
|
|
|
FT --JEFF- ###-#### OR ROB ###-####
retaining wall footing wip, ok but waiting for soil eng. letter 1/4/2001 4:18:03 PM
|
Issue PAID IN FULL permit | | | 1/4/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 12/3/2000 | | 1/3/2001 | | PASS |
Dan Overy
|
|
|
1/3/2001 10:19:01 DJO - activity updated through activity BLDA022 from case BLD00-02884.
|
Plan Reviewer's activity | | | 1/3/2001 | | DONE |
|
|
|
mr. youngwerth hand delivered additional structural calculations and drawings addressing footings.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/3/2001 | | DONE |
|
|
|
called permit ready
|
Plan Reviewer's activity | | | 12/13/2000 | | PEND |
|
|
|
received call from owner. has been mis-communication between roger smith, the owner (al youngwerth) and myself. mr. smith will not submit any addendums unless seing actual foundation design that will be used, and has advised owner of such. have contacted scott snyder (scott snyder design) and he will try to obtain the information that is needed to issue permit.
|
Case Summary (BLD) | | | 12/13/2000 | | DONE |
|
|
|
|
Plan Review Report | | | 12/13/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 12/12/2000 | | PEND |
|
|
|
received phone call from owner on 12-12-2000 on status of permit. advised him that additional information requested from engineer has not been received.
|
Plan Reviewer's activity | | | 12/4/2000 | | PEND |
|
|
|
Engineered foundation details for required for exterior post footings and concrete pads at steel beam locations. Straps for line # 2 need located. Anchor size for PHD2 holdowns to be indicated.
|
Plan Review Report | | | 12/4/2000 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/3/2000 | | |
|
|
|
|
Routing - PLANNING | 11/6/2000 | 11/6/2000 | 11/15/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/26/2000 | 9/26/2000 | 11/6/2000 | | PASS |
|
|
|
SEWER FEES PAID TO NORTHWEST BOISE SEWER DIST/LW/PE
|
Routing - PUBLIC WORKS GRADING | 9/26/2000 | 9/26/2000 | 11/2/2000 | | DONE |
Rita DeYoung
|
|
|
Approved as category 1. TOOK TO TERRY 9/27/00 PE
|
Application received | | | 9/26/2000 | | |
|
|
|
CAME IN 9/22/00 DIDN'T GET ADDRESS AND BACK TO ME UNTIL THE 27TH
|
Routing - PLAN CHECK | 11/15/2000 | 11/15/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 9/26/2000 | | | | PEND |
Dan Overy
|
|
|
|