Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-02896
StatusFinaled
Name THE EYE INSTITUTE
Site Address 360 E MALLARD DR Unit: 125
Project NameLAKEPOINTE CENTRE II
Customer Number 
ePlanReviewNo
Description
(THE EYE INSTITUTE-ADMIN OFFICE) Within the existing administration office area, construct interior non-bearing walls to divide existing open office area into three, 9' x 12' patient eye exam rooms; install new 3'-0" x 6'-8", access / egress doors into each new space; modify ceiling grid, light fixtures, mechanical and sprinkler system; and install new outlets. All per approved plan. NOTE: This building is fully sprinkled. FIELD APPROVAL OF SPRINKLER & ALARM SYSTEM BY FIRE INSPECTOR IS REQUIRED AS A CONDITION OF THIS PERMIT. AN L/C IS REQUIRED AT THE CONCLUSION OF THIS PROJECT. (PC#00-785/drs)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/20/2000 DONE
Letter of Compliance #21288 issued 12-18-00.
BLD-Final11/28/200011/29/200011/29/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/28/2000 at 13:15:33. Contact: ###-####. card on site good for l/c final ok. 11/29/2000 10:49:19 AM
FIRE-Final Inspection11/21/200011/21/200011/21/2000PPASS
DetailsRick Jackson
FIRE FN - DOUG ###-####
BLD-Framing/Rough-in11/1/200011/2/200011/2/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 15:46:53. Contact: ###-####.
Issue PAID IN FULL permit  10/11/2000 DONE
Inspection Record Card- Bld  9/28/2000 DONE
Print Occupancy Form  9/28/2000 DONE
Telephone call  9/28/2000 DONE
left message
Routing - PLAN CHECK9/27/20009/27/20009/27/2000 PASS
Used previously approved floor plan from record vault for Eye Institute, 360 E. Mallard, Suite 125. Work involves N.B. & N.C. walls to create three private exam room / offices. Plan red-lined to showw location of work per PDS Policy. Approved as noted and attached plan review comments. Routing for issuance.
Plan assigned to (DRS)9/26/20009/26/20009/27/2000 PASS
DetailsDan Stuart
9/27/2000 18:41:01 DRS - activity updated through activity BLDA022 from case BLD00-02896.
PLANS/APPL TAKEN TO FRONT DESK  9/27/2000 PASS
Routing for permit issuance.
Application received  9/27/2000  
Meeting  9/25/2000  
DetailsDan Stuart
Met with Doug Storey to evaluate scope of work for which permit is desired. The project will involve the same tenant, same occupancy use, no increase in area or occupant load. involved on interior non-bearing walls no part of a fire-rated system. Under Boise PDS Policy, Dated 6/5/96, started as trial policy and continued on as a successful program, a copy of an approved floor plan of an existing tenant space can be retrieved from the records vault and the modifications red-lined onto the plans and these can be used for issuance of a permit.