Fee Review-notes | 9/29/2000 | 9/29/2000 | 6/12/2001 | | DONE |
|
|
|
|
Letter of compliance | | | 6/1/2001 | | DONE |
|
|
|
Letter of Compliance #21518 issued 6-1-01.
|
BLD-Final | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | PASS |
Russ Owen
|
|
|
GATE CODE 7208 ###-#### special inspection has been provided for concrete cylindr test, exceeds required strength of 28 days 400 psi, meet compliance at 7 day test of 4660, Boise City had not been called out to inspect rebar. 12/31/2001 10:18:42 AM fer 12/31/2001 10:18:47 AM 12/31/2001 10:19:39 AM
|
BLD-Final | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Russ Owen
|
|
|
Craig ###-#### needs achd and s-i report for mono pole footing. 12/21/2001 1:56:35 PM
|
FIRE-Final Inspection | 5/9/2001 | 5/10/2001 | 5/10/2001 | A | PASS |
Joe Tawney
|
|
|
###-####\\7208 Final OK for permanant occupancy 5/10/2001 10:31:38 AM
|
FIRE-Final Inspection | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | FAIL |
Joe Tawney
|
|
|
###-#### gate code 7208 Final Fail Approved plans not on site 5/9/2001 12:23:52 PM
|
BLD-Final | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | FAIL |
Jim Sly
|
|
|
###-#### Craig gate comb 7208 card is by elec equipment next to power C/N....Need Req signatures on Occ Request card and letter of appr from Eng of record. 4/23/2001 2:06:05 PM
|
BLD-Final | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### Unable to connect with party responsible for paperwork. 4/20/2001 12:06:32 PM
|
BLD-Foundation | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Russ Owen
|
|
|
re-bar Mark ###-####s-i inspection will be performed./2001 3:25:10 PM 2/13/2001 3:25:32 PM
|
Routing Off Site - A.C.H.D | 2/12/2001 | 2/12/2001 | 2/12/2001 | | DONE |
|
|
|
received letter from a.c.h.d./the district will not assess an impact fee for this project, because it does not cause any additional trips on the roadway system/2/12/01/mls
|
Issue PAID IN FULL permit | | | 2/12/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/4/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/4/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/4/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/27/2000 | | 1/3/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 12/4/2000 | | 1/3/2001 | | PASS |
Mike Otto
|
|
|
1/3/2001 15:50:33 MLO - activity updated through activity BLDA022 from case BLD00-02944.
|
Additional plans submitted | | | 12/26/2000 | | DONE |
|
|
|
Received additional plans for the 120 foot Monopole Mat Foundation. Forwarded same to Mike Otto. 12/26/00 DAR
|
Telephone call | | | 12/20/2000 | | DONE |
|
|
|
recieved call from Mike Wiley of American Tower regarding corrections. Must provide engineering and foundation design for tower if included on application and plans per UBC Chapter 16 requirements. Faxed correction list to American Tower 12/20/2000. MLO
|
Routing - FIRE | 12/6/2000 | | 12/11/2000 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 12/11/2000 | | FAIL |
|
|
|
failed bldg review
|
Plan resubmittals requested | | | 12/6/2000 | | FAIL |
|
|
|
UBC CORRECTION AND LACKING FOUNDATION PLANS AND ENGINEERING
|
Routing - PLAN CHECK | 12/6/2000 | | 12/6/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED TO AMERICAN TOWER
|
Routing - PUBLIC WORKS | 12/4/2000 | | 12/5/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 12/5/2000 | | 12/5/2000 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/4/2000 | | DONE |
|
|
|
|
Additional plans submitted | | | 12/1/2000 | | |
|
|
|
Received Equipment Shelter Plans from American Tower on 12/1/00. The plans can now be processed. 12/1/00 DAR
|
Telephone call | | | 10/27/2000 | | DONE |
|
|
|
CALLED JEFF VANDERVEEN ABOUT MODULE PLANS APPROVED BY THE STATE HE SAID THEY ARE WORKING ON IT AN IT WOULD BE ANOTHER THREE WEEKS PROBABLY BEFORE THEY HAD STATE APPROVED PLANS. 10/27/00 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 10/4/2000 | | FAIL |
|
|
|
PLANS ON HOLD IN HOLD BOX AWAITING PLANS FROM AMERICAN TOWER FOR THE EQUIPMENT BUILDING THAT HAVE BEEN APPROVED BY THE STATE OF IDAHO. 10/10/00 DAR
|
Application received | | | 9/29/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|