Permit Information
Permit NumberBLD00-02962
StatusExpired
Name MOTOSPORTS
Site Address 1649 N AMBER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel a 3,106 sq.ft. building to be used for storage, repair and exchange of parts for ATV's, Display / Retail Sales, offices and 1-HOUR OCCUPANCY SEPARATIONS BETWEEN the repair AND storage / retail / display areas within this tenant space and between this tenant space & RML, Inc., tenant space to North, per approved plans with red-line notes & attached plan reiew comments on file. Work to include 1-hour fire-resistive construction assemblies, listed with copies on plan, of wood frame and fire-code sheetrock; installation of 1-hour listed & labeled, door / frame / hardware assemblies in occupancy separation wall; removal of two overhead doors & installation of new 9' wide x 5' high window & support framing in the door openings; new suspended ceiling system in retail sales / display areas; new electrical fixture's & exit signs / illumination; and remodel of existing restroom to meet accessibility requirements. NOTE: WEST WALL 4 FEET FROM PROPERTY LINE. WALL UPGRADE TO 1-HOUR WITH 30" PARAPET, SECTION 709.4 UBC. NO OPENING IN WEST WALL. A fire supression sprinkler system is required. A TIME FRAME AGREEMENT WAS APPROVED (COPY ATTACHED TO PLANS) FOR A 36 MONTH PERIOD - TO BE INSTALLED BY 1/2004. (P.C.#818-00)drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/18/20034/18/20034/18/2003 PASS
DetailsTom Arcoraci
tent has moved out with out finishing work 4/18/2003 9:13:03 AM
DOC - Permit Expired4/18/20034/18/20034/18/2003APASS
DetailsTom Arcoraci
Expired by inspector at 4/18/2003 9:13:11 AM
BLD-Aging Inspection2/11/20032/11/20032/11/2003 PASS
DetailsTom Arcoraci
BLD-Conference2/11/20032/11/20032/11/2003APASS
DetailsTom Arcoraci
wip
BLD-Aging Inspection12/11/200212/11/200212/11/2002 PASS
DetailsTom Arcoraci
wip 12/11/2002 10:07:18 AM
BLD-Aging Inspection1/21/20021/21/20021/21/2002 PART
DetailsTom Arcoraci
wip 1/22/2002 2:20:13 PM
BLD-Aging Inspection11/19/200111/19/200111/19/2001 PART
DetailsTom Arcoraci
wip 11/20/2001 10:13:47 AM
BLD-Wall cover9/18/20019/19/20019/19/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/18/2001 at 13:24:02. Contact: . wip ok to cover part ceing in work shp 9/19/2001 3:19:49 PM
BLD-Aging Inspection9/17/20019/17/20019/17/2001 PART
DetailsTom Arcoraci
wip motor bike shop 9/16/2001 10:56:02 PM
BLD-Aging Inspection7/16/20017/16/20017/16/2001 PASS
DetailsTom Arcoraci
WIP 7/15/2001 8:09:34 PM
BLD-Aging Inspection5/16/20015/16/20015/16/2001 PASS
DetailsTom Arcoraci
This is an aging activity wip 5/16/2001 11:38:43 AM
BLD-Framing/Rough-in3/6/20013/6/20013/6/2001PPART
DetailsTom Arcoraci
Bob ###-#### framing for wall between shop and parts ok to cover 3/6/2001 2:14:24 PM
BLD-Framing/Rough-in2/20/20012/21/20012/21/2001APART
DetailsTom Arcoraci
###-#### wip 2nd layer of rock being installed 2/21/2001 11:00:14 AM
BLD-Framing/Rough-in2/6/20012/6/20012/6/2001PPART
DetailsTom Arcoraci
sheet rock-- ###-#### bob wip garage wall 1st layer ok 2/6/2001 2:23:36 PM
BLD-Conference1/18/20011/18/20011/18/2001PPASS
DetailsTom Arcoraci
###-#### discussed start of const 1/18/2001 2:41:46 PM
Issue PAID IN FULL permit  1/16/2001 DONE
Routing - FIRE1/12/20011/12/20011/12/2001 PASS
ATTACHED COPIES OF TIME FRAME AGREEMENT APPROVED BY DAVE MILLER, BOISE FIRE DEPARTMENT BATTALION CHIEF/ FIRE PROTECTION ENGINEER. TIME FRAME FOR INSTALLATION OF A SPRINKLER SYSTEM PER NFPA#13 WILL BE DONE BY JANUARY, 2004. COPY OF AGREEMENT ATTACHED TO PLANS AND IN PROJECT RECORDS FILE. MODIFIED PLAN REVIEW COMMENTS TO REFLECT LETTER OF AGREEMENT TERMS AND POSSIBLE ALARM REQUIREMENTS AT TIME OF INSTALLATION. ATTACHED NEW COMMENT SHEET TO PLANS AND SIGNED FOR ISSUANCE.
PLANS/APPL TAKEN TO FRONT DESK  1/12/2001 PASS
ROUTING FOR ISSUANCE OF PERMIT
Inspection Record Card- Bld  1/12/2001 DONE
Print Occupancy Form  1/12/2001 DONE
Telephone call  1/12/2001 DONE
TALKED TO KIRK MORRIS TO VERIFY PLANS ARE READY
Plan assigned to (DRS)10/7/2000 1/12/2001 PASS
DetailsDan Stuart
1/12/2001 11:30:57 DRS - activity updated through activity BLDA022 from case BLD00-02962.
Routing - PLAN CHECK11/30/2000 1/12/2001 PEND
CALL FROM ARCHITECT, KIRK MORRIS / DAVID RUDEEN STATING THE BUILDING OWNER / MANAGER HAD SUBMITTED A TIME FRAME PROPOSAL TO DAVE MILLER BY WHICH THE BUILDING WILL BE FULLY SPRINKLED. DAVE MILLER APPROVED THE AGREEMENT FOR A 36 MONTH TIME PERIOD. THE COMPLETION DATE WILL BE JANUARY, 2004. ROUTED PLANS BACK TO FIRE FOR APPROVAL AND ATTACHMENT OF REVIEW WITH AGREEMENT LETTER.
Routing - FIRE11/30/200011/30/200011/30/2000 FAIL
DetailsBill Alexander
Still lack fire flows.
Routing - PLAN CHECK11/22/2000 11/29/2000 PEND
INSERTED NEW PLAN SUBMITTALS & SPECIFICATIONS. REVIEWED FOR CODE UPGRADE COMPLIANCE. PLANS OKAY. NO FURTHER SUBMITTALS NEEDED UNLESS FIRE CODE ANALYSIS REQUIRES SPRINKLER SYSTEM. ROUTING TO FIRE FOR RE-REVIEW.
Plan resubmittals received  11/28/2000 DONE
Plan resubmittals received from Hosford, Larson, Rudeen, two sets of sheets A0.01 and small Documents, forwarded same to Dan Stuart. 11/28/00 DAR
Routing - FIRE11/17/200011/22/200011/22/2000 FAIL
DetailsBill Alexander
Question Occupancy changes and now hydrant system verification per UFC. Question combustible/flammable storage, use, etc.
Plan resubmittals received  11/22/2000 DONE
Received two copies of revised sheets A0.00, A1.00, A2.00 A9.00 Routed to Dan Stuart. KMM
Plan Review Completed(1st rev)  11/22/2000 FAIL
Plan resubmittals requested  11/17/2000  
Faxed & mailed copy of plan review comments to architect or response.
Routing - PLAN CHECK10/9/2000 11/17/2000 FAIL
Additional clarification required as to location of occupancy separation wall between "S1/S3" and if one is needed between "S1" / M" if "S1" is less than 1000 sq. ft. sec. 309.2.2. Copy of plan review comments faxed and mailed to architect.
Routing - PUBLIC WORKS10/7/2000 10/9/2000 PASS
Pending Assignment by MYS10/2/2000 10/7/2000 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  10/4/2000 DONE
Received Certificate of Value  10/4/2000 DONE
Application received  10/2/2000  
Routing - PLAN CHECK1/12/20011/12/20011/12/2000 PASS
PLANS APPROVED BY FIRE DEPARTMENT BASED ON TIME FRAME AGREEMENT FOR FULLY SPRINKLING THE BUILDING BY JANUARY 2004. APPROVED AS NOTED ON PLANS AND ATTACHED PLAN REVIEW COMMENTS FROM REVIEW AGENCIES.
Fee Review-notes10/2/200010/2/2000