Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-02964
StatusFinaled
Name MAIN ST CONDO PROP
Site Address 111 W MAIN ST Unit: #200
Project Name 
Customer Number 
ePlanReviewNo
Description
New 2,251 sq.ft. tenant on second floor in existing building for eye doctor office use per approved plans on file. Work to include new one-hour fire rated corridor wall portions and rated lobby wall portions, twenty minute rated door installations, 45 minute rated roll down fire door at reception/rated lobby, one-hour rated floor/ceiling infill, upgrading restroom to meet current accessibility standards, some new interior walls with doors, interior finish, plumbing work, mechanical work, and electrical work. NOTE: The basement only, in this building is fire sprinklered. (P.C.#815-00) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/1/20037/1/20037/1/2003 DONE
Additional values from subcontractors.
Fee Review-notes10/2/200010/2/20005/23/2001 DONE
Permanent occupancy  5/7/2001 DONE
Perm. Occ. Cert. #8669 issued 5-7-01 to Dr. Mark Boerner.
Permanent Occupancy 4/11/20014/11/2001 DONE
Details
BLD-Final4/11/20014/11/20014/11/2001PPASS
DetailsCarl Dependahl
###-#### call first to meet there , card not onsite, c/n ok, ok for c/o 4/11/2001 5:04:13 PM
BLD-Final3/27/20013/27/20013/27/2001PCANC
DetailsJim Sly
###-#### Contractor opted to wait for original inspector to final. 3/27/2001 3:52:08 PM
BLD-Final3/15/20013/16/20013/16/2001PFAIL
DetailsCarl Dependahl
###-#### Walter; need hvac, door closer 3/16/2001 3:39:58 PM
FIRE-Final Inspection3/14/20013/15/20013/15/2001PPASS
DetailsRick Jackson
###-#### early pm call first to meet there
BLD-Final3/14/20013/15/20013/15/2001PNR
DetailsCarl Dependahl
###-####
BLD-Final2/21/20012/23/20012/23/2001PFAIL
DetailsCarl Dependahl
Walter ###-####..need fire, dampers at ducts 2/23/2001 5:01:49 PM
FIRE-Final Inspection2/21/20012/23/20012/23/2001AFAIL
DetailsRick Jackson
Walter ###-#### need clarification on duct penetrations at 1 hr walls; need closures on all rated doors; overhead door requires smoke detectors for release 2/23/2001 9:44:12 AM
BLD-Framing/Rough-in2/14/20012/15/20012/15/2001PPART
DetailsCarl Dependahl
ceiling grid ###-#### and a conference add spreader bars, some perimete rwires, ok to tile, chk at final 2/15/2001 3:44:34 PM
BLD-Conference2/14/20012/14/20012/14/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/14/2001 11:31:54 AM w/ Bob Ross re final: may not have roll-down assy in place for final, will consult 325
BLD-Framing/Rough-in1/16/20011/18/20011/18/2001PPART
DetailsCarl Dependahl
###-####, ok to cover walls & 1st layer at floor 1/18/2001 3:51:45 PM
Issue PAID IN FULL permit  12/26/2000 DONE
Routing - FIRE12/4/200012/7/200012/6/2000 PASS
DetailsBill Alexander
Plan assigned to (JCB)10/7/2000 12/6/2000 PASS
DetailsJason Blais
12/6/2000 14:08:05 JCB - activity updated through activity BLDA022 from case BLD00-02964.
Plan Review Completed(1st rev)  12/6/2000 PASS
Routing - PLAN CHECK12/6/2000 12/6/2000 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  12/6/2000 PASS
Inspection Record Card- Bld  12/6/2000 DONE
Print Occupancy Form  12/6/2000 DONE
Telephone call  12/6/2000 DONE
TALKED TO BOB HESS TO VERIFY PLANS ARE READY
Routing - PLAN CHECK12/4/2000 12/4/2000 PEND
Plan review notes sent and faxed to architect. No response required. Permit approval dependent on Fire Dept. approval of plans. Plans routed to Fire Dept.
Plan resubmittals received  11/30/2000 DONE
Received two copies of revised sheets A-1, D-1, MEP, one copy of structural calcs. for B1, B2, & floor joists, one copy of cut sheet for Cookson Counter Fire Door. Routed to Jason Blaise. KMM
Routing - PLAN CHECK10/9/2000 11/8/2000 HOLD
Numerous issues to address, especially with existing exiting system in the building. Met with architect, Bob Hess, in person to discuss several of the issues. He concurred and said that he would address and resubmit new plans. Plans will be held until reviewable plans are submitted.
Plan Reviewer's activity  11/8/2000  
Met with architect, Bob Hess, on numerous issues to address with this tenant improvement project. Exiting issues and accessibility issues were among the problems with the project. The architect concurred that there were problems and that he would address and resubmit plans showing code compliance. Plans on hold until new drawings that are reviewable are provided.
Routing - PUBLIC WORKS10/7/2000 10/9/2000 PASS
Routing - PLUMBING10/9/2000 10/9/2000 PASS
Plans ACCEPTED BY PLAN TECH  10/3/2000 DONE
Application received  10/2/2000  