Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03005
StatusFinaled
Name THE BASQUE MARKET
Site Address 608 W GROVE ST
Project NameHEATH WAREHOUSE
Customer Number 
ePlanReviewNo
Description
(THE BASQUE MARKET) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To create a 1,454 square foot retail sales and food "take-out" tenant space. Work is to include a 1-hr tenant demising wall, a grease hood and duct, a 1-hr shaft, interior nonbearing walls, kitchen equipment, roof top mechanical equipment, and millwork all per approved drawings and plan review conditions on file. "The Bardenay" has agreed to make their restrooms available to the employees of "The Basque Market". Should ready and convenient access to "The Bardenay" restrooms be denied, the Certificate of Occupancy for "The Basque Market" immediately becomes null and void. PC-833-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/27/2009  
Fee Review-notes10/5/200010/5/20005/23/2001 DONE
Permanent Occupancy 1/5/20011/5/2001 DONE
Details
Permanent occupancy UNPAID FEE  1/5/2001 DONE
Perm. Occ. Cert. #8526 issued 1-5-01 to the Basque Market.
BLD-Final1/4/20011/4/20011/4/2001PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/04/2001 at 10:45:46. Contact: ###-####. c/n ok, card to owner 1/4/2001 4:14:10 PM
FIRE-Final Inspection12/15/200012/18/200012/18/2000AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/15/2000 at 16:55:19. Contact: ###-####. c/n issued 12/20/2000 7:56:06 AM
BLD-Final12/15/200012/18/200012/18/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/15/2000 at 16:57:08. Contact: ###-####...ok for t/o 12/19/2000 9:24:30 AM
FIRE-Final Inspection12/18/200012/18/200012/18/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/18/2000 at 08:59:21. Contact: ###-####.
Routing - FIRE12/6/200012/6/200012/6/2000 PASS
DetailsBill Alexander
Fire sprinkler notes added. Contractor requests and provided verification dealing with eleiminating a seperate fire sprinkler permit review. These are notes to be attached for a field review, that was not provided in the BLD reivew. Notes were faxed this date to Treasure Valley Fire.
BLD-Framing/Rough-in11/29/200011/30/200011/30/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/29/2000 at 16:24:02. Contact: ###-####.
BLD-Framing/Rough-in11/20/200011/20/200011/20/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/20/2000 at 09:06:53. Contact: ###-####. c/n, add 2 9.5" m.lams at rtu supports...(add 1 more at 4 places.) ok to cover partitions 11/20/2000 3:27:18 PM
Inspection Record Card- Bld  11/8/2000 DONE
Print Occupancy Form  11/8/2000 DONE
Issue PAID IN FULL permit  11/8/2000 DONE
Plan assigned to (CJW)10/7/2000 11/7/2000 PASS
DetailsCarl Westfall
11/7/00 09:37:39 CJW - activity updated through activity BLDA022 from case BLD00-03005.
Routing - PLAN CHECK11/6/2000 11/7/2000 PASS
Drawings approved, with conditions, after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  11/7/2000 PASS
Routing - FIRE11/1/200011/6/200011/6/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  11/6/2000  
DetailsBill Alexander
Drawings failed first UBC review.
Plan resubmittals received  11/3/2000 DONE
Received plan resubmittals from Arrmstrong Architects, Tarrie Wagner, all small documents. forwarded same to Carl Westfall. 11/3/00 DAR
Routing - PLAN CHECK10/10/2000 11/1/2000  
Drawings failed first UBC review.
Plan Reviewer's activity  10/31/2000  
UBC plan review started October 30, 2000 and finished November 1, 2000. A response from the architect was required. See the conditions list.
Routing - PLUMBING10/9/2000 10/10/2000 PASS
if an automatic soap dispensor is used provide a water supply for it, additional cross connection may be required, provide a floor sink with vented trap upsteram of the grease trap .
Routing - PUBLIC WORKS10/7/2000 10/9/2000 PASS
Plans ACCEPTED BY PLAN TECH  10/6/2000 DONE
Received Certificate of Value  10/6/2000 DONE
Application received  10/5/2000  
Recd Pcfee & Taken To Pln CK     
Case Summary (BLD)     
Plan Review Report     
Plan Review Report