Case Summary (BLD) | | | 1/27/2009 | | |
|
|
|
|
Fee Review-notes | 10/5/2000 | 10/5/2000 | 5/23/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/5/2001 | 1/5/2001 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 1/5/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8526 issued 1-5-01 to the Basque Market.
|
BLD-Final | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 10:45:46. Contact: ###-####. c/n ok, card to owner 1/4/2001 4:14:10 PM
|
FIRE-Final Inspection | 12/15/2000 | 12/18/2000 | 12/18/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/15/2000 at 16:55:19. Contact: ###-####. c/n issued 12/20/2000 7:56:06 AM
|
BLD-Final | 12/15/2000 | 12/18/2000 | 12/18/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/15/2000 at 16:57:08. Contact: ###-####...ok for t/o 12/19/2000 9:24:30 AM
|
FIRE-Final Inspection | 12/18/2000 | 12/18/2000 | 12/18/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/18/2000 at 08:59:21. Contact: ###-####.
|
Routing - FIRE | 12/6/2000 | 12/6/2000 | 12/6/2000 | | PASS |
Bill Alexander
|
|
|
Fire sprinkler notes added. Contractor requests and provided verification dealing with eleiminating a seperate fire sprinkler permit review. These are notes to be attached for a field review, that was not provided in the BLD reivew. Notes were faxed this date to Treasure Valley Fire.
|
BLD-Framing/Rough-in | 11/29/2000 | 11/30/2000 | 11/30/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 16:24:02. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/20/2000 | 11/20/2000 | 11/20/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 09:06:53. Contact: ###-####. c/n, add 2 9.5" m.lams at rtu supports...(add 1 more at 4 places.) ok to cover partitions 11/20/2000 3:27:18 PM
|
Inspection Record Card- Bld | | | 11/8/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/8/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/8/2000 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/7/2000 | | 11/7/2000 | | PASS |
Carl Westfall
|
|
|
11/7/00 09:37:39 CJW - activity updated through activity BLDA022 from case BLD00-03005.
|
Routing - PLAN CHECK | 11/6/2000 | | 11/7/2000 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2000 | | PASS |
|
|
|
|
Routing - FIRE | 11/1/2000 | 11/6/2000 | 11/6/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 11/6/2000 | | |
Bill Alexander
|
|
|
Drawings failed first UBC review.
|
Plan resubmittals received | | | 11/3/2000 | | DONE |
|
|
|
Received plan resubmittals from Arrmstrong Architects, Tarrie Wagner, all small documents. forwarded same to Carl Westfall. 11/3/00 DAR
|
Routing - PLAN CHECK | 10/10/2000 | | 11/1/2000 | | |
|
|
|
Drawings failed first UBC review.
|
Plan Reviewer's activity | | | 10/31/2000 | | |
|
|
|
UBC plan review started October 30, 2000 and finished November 1, 2000. A response from the architect was required. See the conditions list.
|
Routing - PLUMBING | 10/9/2000 | | 10/10/2000 | | PASS |
|
|
|
if an automatic soap dispensor is used provide a water supply for it, additional cross connection may be required, provide a floor sink with vented trap upsteram of the grease trap .
|
Routing - PUBLIC WORKS | 10/7/2000 | | 10/9/2000 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/6/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 10/6/2000 | | DONE |
|
|
|
|
Application received | | | 10/5/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|