Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03011
StatusExpired
Name CHRIS LARAWAY
Site Address 10114 W OVERLAND
Project NameWILLIAMSBURG OFFICE #3
Customer Number 
ePlanReviewNo
Description
WILLIAMSBURG OFFICE PARK BUILDING #3 * TO CONSTRUCT A 6,350 SQ. FT. , TYPE VN TWO STORY OFFICE SHELL BUILDING. DRH00-00073 NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE PLANS AND PERMITS FOR EACH TENANT ARE REQUIRED FOR OCCUPANCY. SQ. FT. FIRST FLOOR 3,175, SECOND FLOOR 3,175 SQ. FT. GRADING PERMIT ROUTING UNDER SEPARATE PLANS BLD00-03000.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/26/20041/26/20041/26/2004 CANC
DetailsRuss Owen
DOC - Permit Expired1/26/20041/26/20041/26/2004PPASS
DetailsRuss Owen
Expired by inspector at 1/26/2004 11:44:04 AM
BLD-Aging Inspection11/21/200311/21/200311/21/2003 CANC
DetailsRuss Owen
no inspection called for 11/25/2003 12:48:49 AM
BLD-Aging Inspection9/8/20039/8/20039/8/2003 CANC
DetailsRuss Owen
BLD-Aging Inspection7/7/20037/7/20037/7/2003 CANC
DetailsRuss Owen
these have been extended by Tim H. 7/7/2003 10:29:36 AM
BLD-Aging Inspection5/2/20035/2/20035/2/2003 CANC
DetailsRuss Owen
Work not yet started. 5/2/2003 7:42:15 AM
(F) Reprint permit  2/3/2003  
Issue PAID IN FULL permit  1/31/2003 DONE
(F) Reprint permit  1/17/2003 DONE
Print Pending Permit.LaserJet4  1/17/2003 DONE
Print Pending Permit.LaserJet4  1/17/2003  
Telephone call  6/14/2002 DONE
per tim hogland will pickup "2" in july & the rest in jan 2003/mls
Telephone call  12/21/2001 DONE
pd plan check fee to get approval for ext. per linda h/ext. approval until june 7th, 2002/mls
Telephone call  12/20/2001 DONE
called & left mess for chris laraway that the plan check fees need to be pd by friday the 21st or will void permits/mls12/20/01
Test Expiration Notice  11/26/2001 DONE
sent letter now in the 180 day status/mls
Routing - PLANNING10/13/2000 10/16/2001 PASS
see DRH00-73
Inspection Record Card- Bld  5/30/2001 DONE
Print Occupancy Form  5/30/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/29/2001 DONE
Plan assigned to (MLO)10/6/2000 5/29/2001 PASS
DetailsMike Otto
5/29/2001 16:19:22 MLO - activity updated through activity BLDA022 from case BLD00-03011.
Routing - PLANNING5/24/2001 5/25/2001 PASS
Routing - PUBLIC WORKS5/22/2001 5/23/2001 PASS
okay with land division AEM 5/23/01
Requires proof of legal land division per April Miller. 5/14/01 DAR
Routing - PLANNING4/18/2001 4/27/2001 FAIL
Routing - PLAN CHECK4/16/2001 4/18/2001 PASS
Plan resubmittals received  4/16/2001 DONE
recieved sheets C.1, A6.1, A8.1, S6.2, M3.1, E2.2 gave to MLO
Routing - FIRE3/19/2001 3/21/2001 PASS
Routing - PLAN CHECK3/9/2001 3/19/2001 FAIL
corrections sent to architect
Plan resubmittals requested  3/19/2001 FAIL
ubc corrections
Plan resubmittals received  3/8/2001 DONE
Received two copies of revised plans and specifications for the above referenced project. Additional attachments are included and referenced with the corresponding review comment. KMM
Routing - FIRE11/8/200011/13/200011/13/2000 FAIL
DetailsBill Alexander
Lack items requisted on the Grading which now relate to the building. UBC - UFC related issues.
Plan Review Completed(1st rev)  11/13/2000 FAIL
Routing - PLAN CHECK10/19/2000 11/8/2000 FAIL
CORRECTIONS MAILED TO ARCHITECT
Plan resubmittals requested  11/8/2000 FAIL
UBC CORRECTIONS AND ADDITIONAL PLANS AND CALCULATIONS FOR STRUCTURAL REVIEW.
Routing - PLANNING10/13/2000 10/16/2000 FAIL
SEE DRH00-73
Routing - PLUMBING10/16/2000 10/16/2000 PASS
Routing - PUBLIC WORKS10/6/2000 10/13/2000 PASS
Plan routing begun/NEW & ADDTN  10/6/2000 DONE
Application received  10/6/2000  
Plans ACCEPTED BY PLAN TECH  10/6/2000 PEND
PLANS ARE MISSING STRUCT. PLANS AND CALCS. I HAD CHRIS LARAWAY SPEAK WITH JOHN M. ABOUT THE MATTER. JOHN TOLD CHRIS WE WOULD ROUTE AS FAR AS WE CAN BEFORE PUTTING ON HOLD, IF STRUCT. IS NOT RECEIVED. I ALSO REQUIRE SOILS BEARING PRESURE. CHRIS WILL CALL WITH THAT INFORMATION. KMM
Received Certificate of Value  10/6/2000 DONE