Second Notice BLD | 7/7/2006 | 7/7/2006 | 7/7/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 5/31/2006 | 5/31/2006 | 7/7/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 5/31/2006 | 5/31/2006 | 5/31/2006 | | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 3/30/2006 | 3/30/2006 | 3/30/2006 | P | PASS |
Mike Jordan
|
|
|
Marty; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Shell and core ok.
|
(F) Reprint permit | | | 3/29/2006 | | |
|
|
|
|
BLD-Final | 3/24/2006 | 3/24/2006 | 3/24/2006 | P | NR |
Mike Jordan
|
|
|
Marty; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Spoke with contractor on site. He still needs Elec. final for shell and core. Contractor also needs to contact mech insp. due to mech. permit being expired.
|
(F) Reprint permit | | | 3/21/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled. Plans don't match the original shell layout but walls do match the new tenant drawings for BLD05-02721.
|
FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 | A | FAIL |
Troy Cobbley
|
|
|
Wall layout does not match what is on plans.
|
FIRE-Final Inspection | 3/13/2006 | 3/13/2006 | 3/13/2006 | P | FAIL |
Troy Cobbley
|
|
|
No approved plans or notes on site for inspection.
|
BLD-Aging Inspection | 3/13/2006 | 3/13/2006 | 3/13/2006 | | PASS |
Mike Jordan
|
|
|
Spoke with Marty, TI is in progress. Will call for Elec. final and fire/life to get shell and core completed.
|
BLD-Final | 8/18/2005 | 8/19/2005 | 8/19/2005 | A | NR |
Jim Sly
|
|
|
marty; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Called and talked to Marty.......He needs Electr and Mech to final.......Needs fire final.......or fire to inspect when T I's completed.
|
BLD-Conference | 5/24/2005 | 8/10/2005 | 8/9/2005 | A | NR |
Jim Sly
|
|
|
WIP.....Talked to Marty
|
(F) Reprint permit | | | 6/3/2005 | | |
|
|
|
|
BLD-Aging Inspection | 5/23/2005 | 5/23/2005 | 5/23/2005 | | NR |
Jim Sly
|
|
|
C/N.... Talked to Marty....###-#### C- ###-#### Gave him 90 days to complete all finals for this bldg. 5/24/2005 4:23:04 PM
|
BLD-Framing/Rough-in | 6/14/2004 | 6/15/2004 | 6/15/2004 | A | PART |
Tom Arcoraci
|
|
|
marty- ###-#### cell -call 1st before insp framing in progress 6/15/2004 9:15:01 AM
|
(F) Reprint permit | | | 6/14/2004 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/14/2004 | | DONE |
|
|
|
per jennifer ok to re-open permit & set up insp & extend to july 5th 2004
|
BLD-Aging Inspection | 3/4/2004 | 3/4/2004 | 3/4/2004 | | CANC |
Russ Owen
|
|
|
|
DOC - Permit Expired | 3/3/2004 | 3/3/2004 | 3/3/2004 | A | PASS |
Russ Owen
|
|
|
Expired by inspector at 3/3/2004 11:21:15 PM
|
BLD-Aging Inspection | 12/29/2003 | 12/29/2003 | 12/29/2003 | | DONE |
Russ Owen
|
|
|
only thing done is the foundation. 12/30/2003 9:56:04 AM
|
BLD-Aging Inspection | 10/24/2003 | 10/24/2003 | 10/24/2003 | | CANC |
Russ Owen
|
|
|
wip. 10/26/2003 10:42:44 PM
|
BLD-Aging Inspection | 8/15/2003 | 8/15/2003 | 8/15/2003 | | CANC |
Russ Owen
|
|
|
wip permit has been extended. 8/15/2003 10:54:08 AM
|
BLD-Foundation | 6/9/2003 | 6/10/2003 | 6/10/2003 | A | PASS |
Russ Owen
|
|
|
lazaro wall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. All foorting and walls have been changed to #4 bar instead of #5 wil new detail from architect. 6/10/2003 11:23:43 AM
|
BLD-Footing | 6/6/2003 | 6/9/2003 | 6/9/2003 | A | PART |
Russ Owen
|
|
|
###-#### lazaro Note contractor is trying to keep this out side of the 10 foot requirement for fire walls I am not able to accurately determine exact location of property line should be plus or minus 6 in. Contractor will have to verify that the wall framing is out of the 10 foot minimum. 6/9/2003 11:39:54 AM
|
BLD-Footing | 6/3/2003 | 6/4/2003 | 6/4/2003 | A | PASS |
Russ Owen
|
|
|
ed after 10:30; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Not I can not determine property line exact at rear there is a hub pin set in by survayor but Builder is going to find out if it is rear, there is an old fence also , there may be possible changes to keep more than 10 foot from property line if so then it will be nessassary to locate exact. as now I would assume with-in a foot +-. 6/4/2003 5:10:51 PM 6/4/2003 5:10:57 PM
|
BLD-Aging Inspection | 5/5/2003 | 5/5/2003 | 5/5/2003 | | CANC |
Russ Owen
|
|
|
no inspections called. 5/5/2003 11:14:26 AM
|
(F) Reprint permit | | | 2/3/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/31/2003 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/21/2003 | | |
|
|
|
|
(F) Reprint permit | | | 1/17/2003 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 1/17/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/14/2002 | | DONE |
|
|
|
per tim hogland will pickup "2" in july & the rest in jan 2003/mls
|
Telephone call | | | 12/21/2001 | | DONE |
|
|
|
pd plan check fee to get approval for ext. per linda h./ext approved until june 7th, 2002/mls
|
Telephone call | | | 12/20/2001 | | DONE |
|
|
|
left mess for chris laraway that the plan check fees need to be paid by friday the 21st or will void permits/12/20/01/mls
|
Test Expiration Notice | | | 11/26/2001 | | DONE |
|
|
|
in the 180 days status/mls
|
Inspection Record Card- Bld | | | 8/2/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/30/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/6/2000 | | 5/29/2001 | | PASS |
Mike Otto
|
|
|
5/29/2001 16:20:20 MLO - activity updated through activity BLDA022 from case BLD00-03014.
|
Routing - PLANNING | 5/24/2001 | | 5/25/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/22/2001 | | 5/23/2001 | | PASS |
|
|
|
Okay on land division AEM 5/23/01
Requires proof of legal land division per April Miller. 5/14/01 DAR
|
Routing - PLANNING | 4/18/2001 | | 4/27/2001 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 4/16/2001 | | 4/18/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/16/2001 | | DONE |
|
|
|
received sheets C.1, A6.1, A8.1, S6.2, M3.1, E2.2 gave to MLO
|
Routing - FIRE | 3/19/2001 | | 3/21/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/9/2001 | | 3/19/2001 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 3/19/2001 | | FAIL |
|
|
|
ubc corrections
|
Plan resubmittals received | | | 3/8/2001 | | DONE |
|
|
|
Received two copies of revised plans and specifications for the above referenced project. Additional attachments are included and referenced with the corresponding review comment. Routed to Mike O. KMM
|
Routing - FIRE | 11/8/2000 | 11/13/2000 | 11/13/2000 | | FAIL |
Bill Alexander
|
|
|
Lack items requisted on the Grading which now relate to the building. UBC - UFC related issues.
|
Plan Review Completed(1st rev) | | | 11/13/2000 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 10/19/2000 | | 11/8/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED TO ARCHITECT
|
Plan resubmittals requested | | | 11/8/2000 | | FAIL |
|
|
|
UBC CORRECTIONS AND ADDITIONAL SET OF PLANS AND CALCULATIONS FOR STRUCTURAL REVIEW.
|
Routing - PLANNING | 10/13/2000 | | 10/16/2000 | | FAIL |
|
|
|
SEE DRH00-73
|
Routing - PLUMBING | 10/16/2000 | | 10/16/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/6/2000 | | 10/13/2000 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/6/2000 | | DONE |
|
|
|
|
Application received | | | 10/6/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/6/2000 | | PEND |
|
|
|
PLANS ARE MISSING STRUCT. PLANS AND CALCS. I HAD CHRIS LARAWAY SPEAK WITH JOHN M. ABOUT THE MATTER. JOHN TOLD CHRIS WE WOULD ROUTE AS FAR AS WE CAN BEFORE PUTTING ON HOLD, IF STRUCT. IS NOT RECEIVED. I ALSO REQUIRE SOILS BEARING PRESURE. CHRIS WILL CALL WITH THAT INFORMATION. KMM
|
Received Certificate of Value | | | 10/6/2000 | | DONE |
|
|
|
|