Permit Information
Permit NumberBLD00-03068
StatusFinaled
Name PETERSEN-STAGGS
Site Address 1653 VISTA AVE
Project NameALBERTSON'S #193
Customer Number2K172
ePlanReviewNo
Description
TO CONSTRUCT A NEW 60,325 SQ. FT., ONE STORY, TYPE VN, FULLY FIRE SPRINKLERED ALBERTSONS GROCERY STORE #193 . WORK INCLUDES SITE WORK AND SITE UTILITIES. DRH00-00021, PC#846-00 MLO HIGH RACK STORAGE REQUIRES SEPARATE PLANS AND PERMITS. FIRE SRPINKLERS USED FOR UNLIMITED AREA. MUST MAINTAIN 60 FEET OPEN YARDS AROUND THE BUILDING PER THE 1997 UNIFORM BUILDING CODE
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/9/2015 DONE
BLD-Final1/29/20021/29/20021/29/2002PPASS
DetailsJim Storey
###-#### ron
Permanent Occupancy 1/29/20021/29/2002 DONE
Details
Permanent occupancy UNPAID FEE  1/29/2002 DONE
Perm. Occ. Cert. #9007 issued 1-29-02 to Albertson's #193.
Plan resubmittals received  11/23/2001 DONE
Received one copy of Field Summary Report No. 1, 2, 20, 21, 22 from Kleinfelder for daily Field Reports. Routed to Mike Otto.
Fee Review-notes10/23/200110/23/200111/9/2001 DONE
9/25--final cert 4.4 ele 704,000 plm & mec 414,000..I didn't get all values (owner supplied) I took the total and sub. the subs total and worked up owner supplied permits.
1/24 called ron left mesg. still need final values. 10/23--left mesg for ron waldmen ###-#### to call me back about final certs and owner supplied equip. lh
Telephone call  11/8/2001 DONE
Talked with Ron re: status of temp. occ. again
Telephone call  10/17/2001 DONE
Talked to Ron w/Sundance re: status of temp. occ. & he will be writing a letter to Tim requesting an extension because of landscaping problems.
Plan resubmittals received  8/27/2001 DONE
Received two copies of revised sheet 3.7A. Routed to Jim Storey. KMM
BLD-Final8/24/20018/24/20018/24/2001PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/24/2001 at 10:11:43. Contact: ###-####. c/n,thresholds, exit doors (chk break away hdwe at main entry, etc. see c/n. ok for t/o. 8/24/2001 4:32:52 PM
Code Occupancy Approval  8/24/2001 TEMP
Bond delived to city hall temp approved.
Temporary occupancy  8/24/2001 DONE
Temp. Occ. Cert. #4578 issued 8-24-01 to Albertson's.
BLD-Final8/22/20018/23/20018/23/2001PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/22/2001 at 17:16:36. Contact: ###-####. needs signatures on occ card 8/23/2001 2:11:04 AM
Code Occupancy Approval  8/23/2001 FAIL
Met with Ron, ###-####, regarding sign offs. Landscaping not done, plus after new store is opened the parking lot and old building will be torn up. Ron provided documentation that it will take about $133,250 to complete project as per DRH and CUP. Bonding information given to him and with the 10% the total bond would be $146,575.
FIRE-Final Inspection8/21/20018/22/20018/22/2001PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/21/2001 at 14:20:59. Contact: ###-####.
BLD-Conference8/17/20018/20/20018/20/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/17/2001 at 17:01:48. Contact: ###-####.
FIRE-Final Inspection8/16/20018/17/20018/17/2001PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/16/2001 at 17:05:37. Contact: ###-####. c/n issued 8/17/2001 4:31:25 PM
BLD-Other8/9/20018/10/20018/10/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/09/2001 at 22:44:38. Contact: ###-####. ceillings ok except mony office vestabual light and com.room perimotor wires/ exit hardware at ele rm and back loading dock. 8/10/2001 9:04:11 AM
BLD-Other8/9/20018/10/20018/10/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/09/2001 at 22:44:38. Contact: ###-####. ceillings ok except mony office vestabual light and com.room perimotor wires/ exit hardware at ele rm and back loading dock. 8/10/2001 9:04:11 AM
BLD-Other8/7/20018/8/20018/8/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/07/2001 at 17:35:43. Contact: ###-####. delli primitor wires/ break rm primitor wires 8/8/2001 3:00:20 PM
BLD-Other8/3/20018/6/20018/6/2001PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/03/2001 at 17:18:50. Contact: ###-####. hole in shaft/ 8/6/2001 2:17:13 PM
BLD-Other7/31/20018/1/20018/1/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/31/2001 at 15:12:29. Contact: ###-####. ceilling in vidio rm ok 8/1/2001 8:25:41 AM
BLD-Other7/26/20017/27/20017/27/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/26/2001 at 09:33:04. Contact: ###-####. fozen food ceillg ok for cover. 7/27/2001 1:34:51 PM
BLD-Other7/23/20017/24/20017/23/2001ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/23/2001 at 13:08:47. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/23/2001 at 13:11:39.
FIRE-Conference7/11/20017/11/20017/11/2001APART
DetailsRick Jackson
Added by Inspector: 409 On 7/11/2001 9:59:37 AM discussed address location with John
BLD-Other6/13/20016/13/20016/13/2001PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/13/2001 at 07:52:39. Contact: ###-####. 6/13/2001 1:12:33 PM 6/13/2001 3:59:32 PM roof deck over elec room and front entrt needs botton punched and deck weled to ledger have special inspection reinspect 6/13/2001 4:01:45 PM
BLD-Other5/25/20015/25/20015/25/2001AFAIL
DetailsBill VanDegrift
Added by Inspector: 330 On 5/25/2001 8:50:08 AM left correction notice for rain water system installed without a permit.
BLD-Framing/Rough-in5/23/20015/23/20015/23/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/23/2001 at 10:11:31. Contact: ###-####.
BLD-Other4/24/20014/25/20014/25/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/24/2001 at 08:27:56. Contact: ###-####. missing botton punching and clean out of south paripett mortor over 5/8 into wall cavity for grout. 4/25/2001 9:18:09 AM
BLD-Other4/13/20014/16/20014/16/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/13/2001 at 12:59:30. Contact: ###-####. north roof deck ok for cover. 4/16/2001 9:15:21 AM
FIRE-Conference4/10/20014/11/20014/11/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/10/2001 at 14:39:56. Contact: ###-####. discussed knox box location; told him to call fire station for locations 4/11/2001 9:41:12 AM
BLD-Other4/9/20014/10/20014/10/2001ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/09/2001 at 16:31:46. Contact: ###-####. roof deck welding in progess appeares ok special insp. on site and will verify north half in report upon completion. 4/10/2001 10:58:18 AM
Plan resubmittals received  4/6/2001 DONE
Received one copy of Mortar cylinder compressive strength report UBC 21-16. Three copies of concrete cylinder compressive strength report ASTM C39.
One copy of Test results Moisture Density Relationship. One copy of Field summary report No. 7. Routed to Jim Story KMM
BLD-Other4/4/20014/5/20014/5/2001PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/04/2001 at 14:21:49. Contact: ###-####. roof deck welds under sized. 4/6/2001 9:14:31 AM
BLD-Footing3/12/20013/13/20013/13/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/12/2001 at 15:43:50. Contact: . placed with special insp. pending report / reviewed plan. 3/13/2001 4:51:43 PM
BLD-Footing3/7/20013/8/20013/8/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/07/2001 at 10:11:27. Contact: ###-####. placed with special insp pending report. 3/8/2001 5:06:26 PM
BLD-Foundation3/1/20013/2/20013/2/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/01/2001 at 14:18:38. Contact: ###-####.
BLD-Footing2/28/20013/1/20013/1/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/28/2001 at 15:46:38. Contact: ###-####. placed with special insp.pending report. 3/1/2001 3:40:22 PM
BLD-Footing2/26/20012/27/20012/27/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/26/2001 at 13:54:00. Contact: ###-####. placed with special insp. kleinfelder ed sloane. tech. icbo cert. 2/27/2001 3:27:02 PM
BLD-Footing2/22/20012/26/20012/26/2001ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/22/2001 at 16:29:14. Contact: ###-####.Klienfeilder is 2/26/2001 12:27:33 PM special insp. 2/26/2001 12:28:31 PM
Case Summary (BLD)  1/24/2001 DONE
(F) Reprint permit  1/22/2001 DONE
Override - Parcel Holds  1/18/2001  
Issue PAID IN FULL permit  1/18/2001 DONE
Telephone call  1/16/2001 DONE
TALKED TO BRUCE PETERSON TO VERIFY PLANS ARE READY
Override - Parcel Holds  1/16/2001  
Override - Parcel Holds  1/16/2001  
Inspection Record Card- Bld  1/16/2001 DONE
Print Occupancy Form  1/16/2001 DONE
Plan assigned to (MLO)10/17/2000 1/12/2001 PASS
DetailsMike Otto
1/12/2001 15:40:39 MLO - activity updated through activity BLDA022 from case BLD00-03068.
Routing - PUBLIC WORKS1/3/2001 1/12/2001 PASS
Routing - PLANNING1/12/2001 1/12/2001 PASS
Landscape plan submitted. Plans approved per DRH00-21.
PLANS/APPL TAKEN TO FRONT DESK  1/12/2001 DONE
Override - Parcel Holds  1/12/2001  
Override - Parcel Holds  1/12/2001  
Override - Parcel Holds  1/12/2001  
Inspection Record Card- Bld  1/12/2001 DONE
Print Occupancy Form  1/12/2001 DONE
Routing - PLAN CHECK12/22/2000 1/3/2001 PASS
Plan resubmittals received  12/21/2000 DONE
Plan resubmittals received from Petersen Staggs Architects, forwarded same to Mike Otto. 12/21/00 DAR
Routing - FIRE11/16/200011/16/200011/16/2000 PASS
DetailsBill Alexander
Routing - FIRE11/9/200011/13/200011/13/2000 FAIL
DetailsBill Alexander
Lack fire sprinkler water supply information.
Plan Review Completed(1st rev)  11/13/2000 FAIL
Routing Off Site - STRUCTURAL10/17/2000 11/9/2000 PASS
SENT OPLANS TO CONSULTATING ENGINEER FOR STURCTURAL REVIEW VIA PDQ. 10/17/00 DAR
Plan resubmittals requested  11/9/2000 FAIL
UBC CORRECTIONS FOR HANDICAPPED ISSUES
Routing - PLAN CHECK11/3/2000 11/9/2000 FAIL
CORRECTIONS FAXED AND MAILED TO ARCHITECT
Routing - PLUMBING10/25/2000 11/3/2000 PASS
no indirect waste receptors shall be allowed within a cabinet, case drains shall be located where accessable for service, if an automatic soap dispensor is used provide a supply for it, additional cross connection protection may be required, sewer service to the point of connection at the interceptor ,ss , must be increased to 6".
Routing - PLANNING10/20/2000 10/25/2000 FAIL
Need Community Forestry's approval prior to Planning signing off plans. Contacted the landscape architect and architect.
Routing - PUBLIC WORKS10/17/2000 10/19/2000 FAIL
DetailsHank Alarcon
REQUIRES STREET LIGHT PLAN PER HANK ALCORN.
Plans ACCEPTED BY PLAN TECH  10/17/2000 DONE
Application received  10/13/2000  
Override - Parcel Holds  10/13/2000  
Override - Parcel Holds  10/13/2000  
Routing Off Site - A.C.H.D1/18/20011/18/2001   
received a.c.h.d.--#01-00270 paid $30,769/1/4/01/mls