Case Summary (BLD) | | | 4/9/2015 | | DONE |
|
|
|
|
BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PASS |
Jim Storey
|
|
|
###-#### ron
|
Permanent Occupancy | | 1/29/2002 | 1/29/2002 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 1/29/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9007 issued 1-29-02 to Albertson's #193.
|
Plan resubmittals received | | | 11/23/2001 | | DONE |
|
|
|
Received one copy of Field Summary Report No. 1, 2, 20, 21, 22 from Kleinfelder for daily Field Reports. Routed to Mike Otto.
|
Fee Review-notes | 10/23/2001 | 10/23/2001 | 11/9/2001 | | DONE |
|
|
|
9/25--final cert 4.4 ele 704,000 plm & mec 414,000..I didn't get all values (owner supplied) I took the total and sub. the subs total and worked up owner supplied permits.
1/24 called ron left mesg. still need final values. 10/23--left mesg for ron waldmen ###-#### to call me back about final certs and owner supplied equip. lh
|
Telephone call | | | 11/8/2001 | | DONE |
|
|
|
Talked with Ron re: status of temp. occ. again
|
Telephone call | | | 10/17/2001 | | DONE |
|
|
|
Talked to Ron w/Sundance re: status of temp. occ. & he will be writing a letter to Tim requesting an extension because of landscaping problems.
|
Plan resubmittals received | | | 8/27/2001 | | DONE |
|
|
|
Received two copies of revised sheet 3.7A. Routed to Jim Storey. KMM
|
BLD-Final | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 10:11:43. Contact: ###-####. c/n,thresholds, exit doors (chk break away hdwe at main entry, etc. see c/n. ok for t/o. 8/24/2001 4:32:52 PM
|
Code Occupancy Approval | | | 8/24/2001 | | TEMP |
|
|
|
Bond delived to city hall temp approved.
|
Temporary occupancy | | | 8/24/2001 | | DONE |
|
|
|
Temp. Occ. Cert. #4578 issued 8-24-01 to Albertson's.
|
BLD-Final | 8/22/2001 | 8/23/2001 | 8/23/2001 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 17:16:36. Contact: ###-####. needs signatures on occ card 8/23/2001 2:11:04 AM
|
Code Occupancy Approval | | | 8/23/2001 | | FAIL |
|
|
|
Met with Ron, ###-####, regarding sign offs. Landscaping not done, plus after new store is opened the parking lot and old building will be torn up. Ron provided documentation that it will take about $133,250 to complete project as per DRH and CUP. Bonding information given to him and with the 10% the total bond would be $146,575.
|
FIRE-Final Inspection | 8/21/2001 | 8/22/2001 | 8/22/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 14:20:59. Contact: ###-####.
|
BLD-Conference | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/17/2001 at 17:01:48. Contact: ###-####.
|
FIRE-Final Inspection | 8/16/2001 | 8/17/2001 | 8/17/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 17:05:37. Contact: ###-####. c/n issued 8/17/2001 4:31:25 PM
|
BLD-Other | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 22:44:38. Contact: ###-####. ceillings ok except mony office vestabual light and com.room perimotor wires/ exit hardware at ele rm and back loading dock. 8/10/2001 9:04:11 AM
|
BLD-Other | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 22:44:38. Contact: ###-####. ceillings ok except mony office vestabual light and com.room perimotor wires/ exit hardware at ele rm and back loading dock. 8/10/2001 9:04:11 AM
|
BLD-Other | 8/7/2001 | 8/8/2001 | 8/8/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 17:35:43. Contact: ###-####. delli primitor wires/ break rm primitor wires 8/8/2001 3:00:20 PM
|
BLD-Other | 8/3/2001 | 8/6/2001 | 8/6/2001 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 17:18:50. Contact: ###-####. hole in shaft/ 8/6/2001 2:17:13 PM
|
BLD-Other | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 15:12:29. Contact: ###-####. ceilling in vidio rm ok 8/1/2001 8:25:41 AM
|
BLD-Other | 7/26/2001 | 7/27/2001 | 7/27/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 09:33:04. Contact: ###-####. fozen food ceillg ok for cover. 7/27/2001 1:34:51 PM
|
BLD-Other | 7/23/2001 | 7/24/2001 | 7/23/2001 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 13:08:47. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/23/2001 at 13:11:39.
|
FIRE-Conference | 7/11/2001 | 7/11/2001 | 7/11/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/11/2001 9:59:37 AM discussed address location with John
|
BLD-Other | 6/13/2001 | 6/13/2001 | 6/13/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 07:52:39. Contact: ###-####. 6/13/2001 1:12:33 PM 6/13/2001 3:59:32 PM roof deck over elec room and front entrt needs botton punched and deck weled to ledger have special inspection reinspect 6/13/2001 4:01:45 PM
|
BLD-Other | 5/25/2001 | 5/25/2001 | 5/25/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 5/25/2001 8:50:08 AM left correction notice for rain water system installed without a permit.
|
BLD-Framing/Rough-in | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 10:11:31. Contact: ###-####.
|
BLD-Other | 4/24/2001 | 4/25/2001 | 4/25/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 08:27:56. Contact: ###-####. missing botton punching and clean out of south paripett mortor over 5/8 into wall cavity for grout. 4/25/2001 9:18:09 AM
|
BLD-Other | 4/13/2001 | 4/16/2001 | 4/16/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 12:59:30. Contact: ###-####. north roof deck ok for cover. 4/16/2001 9:15:21 AM
|
FIRE-Conference | 4/10/2001 | 4/11/2001 | 4/11/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 14:39:56. Contact: ###-####. discussed knox box location; told him to call fire station for locations 4/11/2001 9:41:12 AM
|
BLD-Other | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 16:31:46. Contact: ###-####. roof deck welding in progess appeares ok special insp. on site and will verify north half in report upon completion. 4/10/2001 10:58:18 AM
|
Plan resubmittals received | | | 4/6/2001 | | DONE |
|
|
|
Received one copy of Mortar cylinder compressive strength report UBC 21-16. Three copies of concrete cylinder compressive strength report ASTM C39.
One copy of Test results Moisture Density Relationship. One copy of Field summary report No. 7. Routed to Jim Story KMM
|
BLD-Other | 4/4/2001 | 4/5/2001 | 4/5/2001 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 14:21:49. Contact: ###-####. roof deck welds under sized. 4/6/2001 9:14:31 AM
|
BLD-Footing | 3/12/2001 | 3/13/2001 | 3/13/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 15:43:50. Contact: . placed with special insp. pending report / reviewed plan. 3/13/2001 4:51:43 PM
|
BLD-Footing | 3/7/2001 | 3/8/2001 | 3/8/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 10:11:27. Contact: ###-####. placed with special insp pending report. 3/8/2001 5:06:26 PM
|
BLD-Foundation | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 14:18:38. Contact: ###-####.
|
BLD-Footing | 2/28/2001 | 3/1/2001 | 3/1/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 15:46:38. Contact: ###-####. placed with special insp.pending report. 3/1/2001 3:40:22 PM
|
BLD-Footing | 2/26/2001 | 2/27/2001 | 2/27/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 13:54:00. Contact: ###-####. placed with special insp. kleinfelder ed sloane. tech. icbo cert. 2/27/2001 3:27:02 PM
|
BLD-Footing | 2/22/2001 | 2/26/2001 | 2/26/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 16:29:14. Contact: ###-####.Klienfeilder is 2/26/2001 12:27:33 PM special insp. 2/26/2001 12:28:31 PM
|
Case Summary (BLD) | | | 1/24/2001 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/22/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/18/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/18/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/16/2001 | | DONE |
|
|
|
TALKED TO BRUCE PETERSON TO VERIFY PLANS ARE READY
|
Override - Parcel Holds | | | 1/16/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 1/16/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/16/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/16/2001 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/17/2000 | | 1/12/2001 | | PASS |
Mike Otto
|
|
|
1/12/2001 15:40:39 MLO - activity updated through activity BLDA022 from case BLD00-03068.
|
Routing - PUBLIC WORKS | 1/3/2001 | | 1/12/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 1/12/2001 | | 1/12/2001 | | PASS |
|
|
|
Landscape plan submitted. Plans approved per DRH00-21.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/12/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 1/12/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 1/12/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/12/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/12/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/22/2000 | | 1/3/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/21/2000 | | DONE |
|
|
|
Plan resubmittals received from Petersen Staggs Architects, forwarded same to Mike Otto. 12/21/00 DAR
|
Routing - FIRE | 11/16/2000 | 11/16/2000 | 11/16/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 11/9/2000 | 11/13/2000 | 11/13/2000 | | FAIL |
Bill Alexander
|
|
|
Lack fire sprinkler water supply information.
|
Plan Review Completed(1st rev) | | | 11/13/2000 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/17/2000 | | 11/9/2000 | | PASS |
|
|
|
SENT OPLANS TO CONSULTATING ENGINEER FOR STURCTURAL REVIEW VIA PDQ. 10/17/00 DAR
|
Plan resubmittals requested | | | 11/9/2000 | | FAIL |
|
|
|
UBC CORRECTIONS FOR HANDICAPPED ISSUES
|
Routing - PLAN CHECK | 11/3/2000 | | 11/9/2000 | | FAIL |
|
|
|
CORRECTIONS FAXED AND MAILED TO ARCHITECT
|
Routing - PLUMBING | 10/25/2000 | | 11/3/2000 | | PASS |
|
|
|
no indirect waste receptors shall be allowed within a cabinet, case drains shall be located where accessable for service, if an automatic soap dispensor is used provide a supply for it, additional cross connection protection may be required, sewer service to the point of connection at the interceptor ,ss , must be increased to 6".
|
Routing - PLANNING | 10/20/2000 | | 10/25/2000 | | FAIL |
|
|
|
Need Community Forestry's approval prior to Planning signing off plans. Contacted the landscape architect and architect.
|
Routing - PUBLIC WORKS | 10/17/2000 | | 10/19/2000 | | FAIL |
Hank Alarcon
|
|
|
REQUIRES STREET LIGHT PLAN PER HANK ALCORN.
|
Plans ACCEPTED BY PLAN TECH | | | 10/17/2000 | | DONE |
|
|
|
|
Application received | | | 10/13/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 10/13/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 10/13/2000 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 1/18/2001 | 1/18/2001 | | | |
|
|
|
received a.c.h.d.--#01-00270 paid $30,769/1/4/01/mls
|