Permit Information
Permit NumberBLD00-03069
StatusFinaled
Name ALBERTSONS
Site Address 1601 S VISTA AVE
Project NameALBERTSONS EXPRESS#193
Customer Number2K173
ePlanReviewNo
Description
ALBERTSON'S EXPRESS #193, TO CONSTRUCT A 2,199 SQ. FT. ONE STORY, TYPE VN CONVIENIENCE STORE PER APPROVED PLANS AND ATTACHMENTS. FUEL CANOPY FOR #193 IS UNDER PERMIT BLDOO-003095 DRHOO-OOO21, PC#847-00 MLO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/1/20037/1/20037/1/2003 DONE
Additional values from subcontractors.
Permanent Occupancy 1/29/20021/29/2002 DONE
Details
BLD-Final1/29/20021/29/20021/29/2002PPASS
DetailsJim Storey
###-#### ron
Permanent occupancy  1/29/2002 DONE
Perm. Occ. Cert. #90007 issued 1-29-02 to Albertson's Express #193.
FIRE-Final Inspection12/13/200112/14/200112/14/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/13/2001 at 14:50:57. Contact: ###-####.
BLD-Final12/13/200112/14/200112/14/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/13/2001 at 14:52:46. Contact: ###-####. temp ok/pending others/ need pad exit hardware on order must verrify. 12/14/2001 3:12:05 PM
Temporary occupancy  12/14/2001 DONE
Temp. Occ. Cert. #4683 issued 12-14-01 to Albertson's Express #193 by Amy.
BLD-Other12/11/200112/12/200112/12/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2001 at 15:39:26. Contact: ###-####. drop ceilling ok for cover. 12/12/2001 10:03:56 AM
Print Occupancy Form  12/10/2001 DONE
FIRE-Conference12/7/200112/7/200112/7/2001PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/07/2001 at 10:20:36. Contact: ###-####. extinguishers; exit signs; emergency fuel shut off for final inspection 12/7/2001 3:28:23 PM
BLD-Conference12/5/200112/5/200112/5/2001PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/05/2001 at 11:29:37. Contact: ###-####.
BLD-Framing/Rough-in11/20/200111/21/200111/21/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/20/2001 at 16:19:58. Contact: ###-####. ok to one side supply 16 gage member on soffit per plan backing for ada bathrooms needed. 11/21/2001 4:15:56 PM
BLD-Footing10/25/200110/26/200110/26/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/25/2001 at 12:53:09. Contact: ###-####. isolated canopy ftgs, kleinfelder onsite, pend report 10/26/2001 3:13:17 PM
BLD-Footing10/4/200110/5/200110/5/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/04/2001 at 09:55:59. Contact: ###-####. placed with special insp. unable to insp upon meeting at state of idaho board 10/5/2001 2:07:14 PM
BLD-Footing10/2/200110/3/200110/3/2001ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/02/2001 at 12:18:58. Contact: ###-####. to be covered with special insp. 10/3/2001 10:00:14 AM
BLD-Aging Inspection9/24/20019/24/20019/24/2001 PASS
DetailsJim Storey
demo and site prep 9/24/2001 5:14:47 PM
(F) Reprint permit  8/24/2001 DONE
BLD-Aging Inspection7/25/20017/25/20017/25/2001 PASS
DetailsJim Storey
wip 7/25/2001 7:23:54 AM
BLD-Aging Inspection5/25/20015/25/20015/25/2001 PASS
DetailsJim Storey
work in progess to eary to have insp. requsted. 5/25/2001 11:25:51 AM
(F) Reprint permit  1/22/2001 DONE
Routing Off Site - A.C.H.D1/18/20011/18/20011/18/2001 DONE
received a.c.h.d. #01-00270 pd $30,769/1/18/01/mls
Override - Parcel Holds  1/18/2001  
Issue PAID IN FULL permit  1/18/2001 DONE
Telephone call  1/17/2001 DONE
talked to bruce to verify plans are ready
PLANS/APPL TAKEN TO FRONT DESK  12/8/2000 DONE
Plan assigned to (MLO)10/17/2000 12/8/2000 PASS
DetailsMike Otto
12/8/2000 16:20:43 MLO - activity updated through activity BLDA022 from case BLD00-03069.
Routing - PLAN CHECK12/4/2000 12/5/2000 PASS
Plan resubmittals received  12/4/2000 DONE
Received two copies of Architectural site plan and details
Two copies of site dimension control plan
Three copies of canopy design calcuoations
One copy per request one addt'l set of canopy dwgs.
Two per request, two sets of fuel center site drawings showing storm drainage
One written line item response letter.
One written response letter provided by Lane Co.
Routed all of the above to Mike Otto. KMM
Routing - FIRE11/20/200011/21/200011/21/2000 PASS
DetailsBill Alexander
Application received  11/21/2000 PASS
DetailsBill Alexander
Plan resubmittals received  11/20/2000 DONE
RECEIVED TWO COPIES OF SHEET 1.8 AND WRITTEN RESPONSE WITH CALCS FOR FIRE FLOW INFO PER FIRE COMMENTS. PLANS ROUTED TO FIRE.
Routing - PUBLIC WORKS11/8/2000 11/8/2000 PASS
Routing - FIRE11/3/200011/3/200011/3/2000 FAIL
DetailsBill Alexander
Lack hydrant locations and minimum flows
Routing Off Site - STRUCTURAL10/17/2000 11/3/2000 FAIL
SENT PLANS TO CONSULTATING ENGINEER FOR STRUCTURAL REVIEW. 10/17/00 DAR
Plan resubmittals requested  11/3/2000 FAIL
UBC and structural corrections
Plan Review Completed(1st rev)  11/3/2000 FAIL
Routing - PLAN CHECK10/30/2000 11/3/2000 FAIL
corrections faxed and mailed to architect. MLO
Routing - PLANNING10/18/2000 10/30/2000 PASS
Approve per letter from Petersen Staggs dated October 26, 2000 indicating that canopy color will be tan, not blue.
Routing - PLUMBING10/25/2000 10/26/2000 PASS
Routing - PUBLIC WORKS10/17/2000 10/18/2000 FAIL
REQUIRES DRAINAGE PLAN REVISION, NEEDS FILTER PER BRIAN MURPHY. 10/18/00 DAR
Plans ACCEPTED BY PLAN TECH  10/17/2000 DONE
Override - Parcel Holds  10/13/2000  
Override - Parcel Holds  10/13/2000  
Routing Off Site - C.D.H10/12/2000 10/12/2000 PASS