Fee Review-notes | 7/1/2003 | 7/1/2003 | 7/1/2003 | | DONE |
|
|
|
Additional values from subcontractors.
|
Permanent Occupancy | | 1/29/2002 | 1/29/2002 | | DONE |
|
|
|
|
BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PASS |
Jim Storey
|
|
|
###-#### ron
|
Permanent occupancy | | | 1/29/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #90007 issued 1-29-02 to Albertson's Express #193.
|
FIRE-Final Inspection | 12/13/2001 | 12/14/2001 | 12/14/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 14:50:57. Contact: ###-####.
|
BLD-Final | 12/13/2001 | 12/14/2001 | 12/14/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 14:52:46. Contact: ###-####. temp ok/pending others/ need pad exit hardware on order must verrify. 12/14/2001 3:12:05 PM
|
Temporary occupancy | | | 12/14/2001 | | DONE |
|
|
|
Temp. Occ. Cert. #4683 issued 12-14-01 to Albertson's Express #193 by Amy.
|
BLD-Other | 12/11/2001 | 12/12/2001 | 12/12/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 15:39:26. Contact: ###-####. drop ceilling ok for cover. 12/12/2001 10:03:56 AM
|
Print Occupancy Form | | | 12/10/2001 | | DONE |
|
|
|
|
FIRE-Conference | 12/7/2001 | 12/7/2001 | 12/7/2001 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/07/2001 at 10:20:36. Contact: ###-####. extinguishers; exit signs; emergency fuel shut off for final inspection 12/7/2001 3:28:23 PM
|
BLD-Conference | 12/5/2001 | 12/5/2001 | 12/5/2001 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 11:29:37. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/20/2001 | 11/21/2001 | 11/21/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 16:19:58. Contact: ###-####. ok to one side supply 16 gage member on soffit per plan backing for ada bathrooms needed. 11/21/2001 4:15:56 PM
|
BLD-Footing | 10/25/2001 | 10/26/2001 | 10/26/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 12:53:09. Contact: ###-####. isolated canopy ftgs, kleinfelder onsite, pend report 10/26/2001 3:13:17 PM
|
BLD-Footing | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 09:55:59. Contact: ###-####. placed with special insp. unable to insp upon meeting at state of idaho board 10/5/2001 2:07:14 PM
|
BLD-Footing | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:18:58. Contact: ###-####. to be covered with special insp. 10/3/2001 10:00:14 AM
|
BLD-Aging Inspection | 9/24/2001 | 9/24/2001 | 9/24/2001 | | PASS |
Jim Storey
|
|
|
demo and site prep 9/24/2001 5:14:47 PM
|
(F) Reprint permit | | | 8/24/2001 | | DONE |
|
|
|
|
BLD-Aging Inspection | 7/25/2001 | 7/25/2001 | 7/25/2001 | | PASS |
Jim Storey
|
|
|
wip 7/25/2001 7:23:54 AM
|
BLD-Aging Inspection | 5/25/2001 | 5/25/2001 | 5/25/2001 | | PASS |
Jim Storey
|
|
|
work in progess to eary to have insp. requsted. 5/25/2001 11:25:51 AM
|
(F) Reprint permit | | | 1/22/2001 | | DONE |
|
|
|
|
Routing Off Site - A.C.H.D | 1/18/2001 | 1/18/2001 | 1/18/2001 | | DONE |
|
|
|
received a.c.h.d. #01-00270 pd $30,769/1/18/01/mls
|
Override - Parcel Holds | | | 1/18/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/18/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/17/2001 | | DONE |
|
|
|
talked to bruce to verify plans are ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/17/2000 | | 12/8/2000 | | PASS |
Mike Otto
|
|
|
12/8/2000 16:20:43 MLO - activity updated through activity BLDA022 from case BLD00-03069.
|
Routing - PLAN CHECK | 12/4/2000 | | 12/5/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/4/2000 | | DONE |
|
|
|
Received two copies of Architectural site plan and details
Two copies of site dimension control plan
Three copies of canopy design calcuoations
One copy per request one addt'l set of canopy dwgs.
Two per request, two sets of fuel center site drawings showing storm drainage
One written line item response letter.
One written response letter provided by Lane Co.
Routed all of the above to Mike Otto. KMM
|
Routing - FIRE | 11/20/2000 | 11/21/2000 | 11/21/2000 | | PASS |
Bill Alexander
|
|
|
|
Application received | | | 11/21/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 11/20/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF SHEET 1.8 AND WRITTEN RESPONSE WITH CALCS FOR FIRE FLOW INFO PER FIRE COMMENTS. PLANS ROUTED TO FIRE.
|
Routing - PUBLIC WORKS | 11/8/2000 | | 11/8/2000 | | PASS |
|
|
|
|
Routing - FIRE | 11/3/2000 | 11/3/2000 | 11/3/2000 | | FAIL |
Bill Alexander
|
|
|
Lack hydrant locations and minimum flows
|
Routing Off Site - STRUCTURAL | 10/17/2000 | | 11/3/2000 | | FAIL |
|
|
|
SENT PLANS TO CONSULTATING ENGINEER FOR STRUCTURAL REVIEW. 10/17/00 DAR
|
Plan resubmittals requested | | | 11/3/2000 | | FAIL |
|
|
|
UBC and structural corrections
|
Plan Review Completed(1st rev) | | | 11/3/2000 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 10/30/2000 | | 11/3/2000 | | FAIL |
|
|
|
corrections faxed and mailed to architect. MLO
|
Routing - PLANNING | 10/18/2000 | | 10/30/2000 | | PASS |
|
|
|
Approve per letter from Petersen Staggs dated October 26, 2000 indicating that canopy color will be tan, not blue.
|
Routing - PLUMBING | 10/25/2000 | | 10/26/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/17/2000 | | 10/18/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION, NEEDS FILTER PER BRIAN MURPHY. 10/18/00 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 10/17/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/13/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 10/13/2000 | | |
|
|
|
|
Routing Off Site - C.D.H | 10/12/2000 | | 10/12/2000 | | PASS |
|
|
|
|