BLD-Final | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Steven Webb
|
|
|
fn insp-bill or susan--###-#### c. of c. #22158 issued 2/25/2002 2:52:06 PM
|
DOC - Permit Finaled | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 2/25/2002 2:52:12 PM
|
BLD-Conference | 1/8/2002 | 1/9/2002 | 1/9/2002 | P | DONE |
Steven Webb
|
|
|
Contact Bill @ ###-#### or ###-####.
|
BLD-Energy code compliance | 1/31/2001 | 2/1/2001 | 2/1/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/31/2001 at 15:34:06. Contact: ###-####. done by 420. 2/1/2001 9:32:31 AM
|
BLD-Energy code compliance | 2/1/2001 | 2/1/2001 | 2/1/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 2/1/2001 8:44:19 AM Ok to cover 2/1/2001 8:55:25 AM
|
BLD-Framing/Rough-in | 1/29/2001 | 1/30/2001 | 1/30/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 15:32:12. Contact: ###-####. need air seal package prior to insulation. 1/30/2001 10:28:05 AM
|
BLD-Framing/Rough-in | 1/30/2001 | 1/30/2001 | 1/30/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 10:16:31. Contact: ###-####. air seal ok 1/30/2001 4:04:07 PM
|
BLD-Framing/Rough-in | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | PASS |
Steven Webb
|
|
|
###-#### ok to side, need eng for garage front which is under 21" 1/9/2001 11:28:16 AM 1/9/2001 11:28:46 AM
|
Issue PAID IN FULL permit | | | 11/27/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 10/26/2000 | | 11/8/2000 | | PASS |
Steve Munroe
|
|
|
11/8/2000 10:17:15 SAM - activity updated through activity BLDA022 from case BLD00-03089.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2000 | | DONE |
|
|
|
|
BLD-Foundation | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | PART |
Dave Hannah
|
|
|
FOUND INSP WES- ###-#### EXT 19181
|
BLD-Footing | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | PASS |
Steven Webb
|
|
|
###-#### 14236
|
BLD-Footing | 11/2/2000 | 11/2/2000 | 11/2/2000 | P | CANC |
Dave Hannah
|
|
|
###-####
|
Pending Assignment by DJO | 10/16/2000 | | 10/26/2000 | | DONE |
Dan Overy
|
|
|
10/26/2000 09:34:18 SAM - activity updated through activity BLDA183 from case BLD00-03089.
|
Early Start Permit | | | 10/25/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 10/16/2000 | 10/16/2000 | 10/17/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/16/2000 | 10/16/2000 | 10/17/2000 | | PASS |
|
|
|
|
Application received | | | 10/16/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 10/17/2000 | 10/17/2000 | | | PEND |
|
|
|
|
Office Staff conference/action | | | | | PEND |
|
|
|
took one set of plans to copy, ok per steve m. pe 10/23/2000
|
Office Staff conference/action | | | | | DONE |
|
|
|
brought plan back and i put it with other plans/pe 10/23/00
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
10/26/00 11:50 Called and talked to Greg D. and let him know that I need beam sizes and all steel beams sized by engineer.
11/1/00 10:15 Kurt brought in engineering with the set of plans.
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
11/1/00 Called and left a message on Chris H. (engineer) phone to let him know what beams I need engineered. I also called Greg D. and let him know that there is more than the one beam they had sized.
11/7/00 New engineering droped off.
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
Only one set is being issued do to excessive red-lining. Addition engineering for two beams required if post down through foundation not provided.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|