Permanent Occupancy | | 2/11/2003 | 2/11/2003 | | DONE |
|
|
|
|
BLD-Aging Inspection | 12/16/2002 | 12/16/2002 | 12/16/2002 | | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 12/16/2002 | 12/16/2002 | 12/16/2002 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 12/16/2002 3:07:23 PM
|
Fee Review-notes | 1/24/2002 | 1/24/2002 | 5/23/2002 | | DONE |
|
|
|
|
Temporary occupancy | | | 12/14/2001 | | DONE |
|
|
|
#4684
|
BLD-Aging Inspection | 9/24/2001 | 9/24/2001 | 9/24/2001 | | PASS |
Jim Storey
|
|
|
demo in progess for site. 9/24/2001 5:13:07 PM
|
BLD-Aging Inspection | 7/25/2001 | 7/25/2001 | 7/25/2001 | | PASS |
Jim Storey
|
|
|
wip 7/25/2001 7:23:47 AM
|
BLD-Aging Inspection | 5/25/2001 | 5/25/2001 | 5/25/2001 | | PASS |
Jim Storey
|
|
|
work in progess no need for insp. at this time. 5/25/2001 11:24:28 AM
|
Routing Off Site - A.C.H.D | 1/18/2001 | 1/18/2001 | 1/18/2001 | | DONE |
|
|
|
received a.c.h.d #01-00270 pd $30,769/1/4/01/mls
|
Override - Parcel Holds | | | 1/18/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/18/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/17/2000 | | 12/8/2000 | | PASS |
Mike Otto
|
|
|
12/8/2000 16:20:06 MLO - activity updated through activity BLDA022 from case BLD00-03095.
|
Routing Off Site - STRUCTURAL | 12/5/2000 | | 12/8/2000 | | PASS |
|
|
|
Sent caculations for the canopy to consultanting engineer. 12/5/00 DAR
|
Routing - PLAN CHECK | 12/4/2000 | | 12/5/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/4/2000 | | DONE |
|
|
|
Received two copies of Architectural Site Plan and Details
Two copies of Site Dimension Control Plan
Three copies of Canopy design calculations
One copy Per requerst, one addt'l set of Canopy Dwgs.
Two copies per request, two sets of Fuel Center site drawings showing storm drainage.
One copy written line item response letter
One copy written response letter provided by Lane co.
Routed all of the above to Mike Otto. KMM
|
Routing - FIRE | 11/20/2000 | 11/21/2000 | 11/21/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - FIRE | 11/3/2000 | 11/3/2000 | 11/3/2000 | | FAIL |
Bill Alexander
|
|
|
Lack hydrant locations and minimum flows
|
Routing - PLAN CHECK | 10/30/2000 | | 11/3/2000 | | FAIL |
|
|
|
corrections mailed and faxed to architect
|
Routing Off Site - STRUCTURAL | 10/17/2000 | | 11/3/2000 | | FAIL |
|
|
|
SENT PLANS FOR STRUCTURAL ENGINEERING CHECH TO CONSULATING ENGINEER VIA PDQ. 10/17/00 DAR
|
Plan resubmittals requested | | | 11/3/2000 | | FAIL |
|
|
|
UBC and structural corrections
|
Plan Review Completed(1st rev) | | | 11/3/2000 | | FAIL |
|
|
|
|
Routing - PLANNING | 10/18/2000 | | 10/30/2000 | | PASS |
|
|
|
Approve per letter from Petersen Staggs dated October 26, 2000 indicating that canopy color will be tan, not blue.
|
Routing - PLUMBING | 10/25/2000 | | 10/26/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/17/2000 | | 10/18/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION , NEED FILTER. PER BRIAN MURPHY. 10/18/00 DAR
|
Application received | | | 10/17/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/17/2000 | | DONE |
|
|
|
|
Routing Off Site - C.D.H | 10/12/2000 | | 10/12/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/8/2000 | | 1/8/2000 | | PASS |
|
|
|
|