BLD-Final | 1/7/2002 | 1/7/2002 | 1/7/2002 | P | PASS |
Tony Young
|
|
|
###-####
|
DOC - Permit Finaled | 1/7/2002 | 1/7/2002 | 1/7/2002 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 1/7/2002 1:54:40 PM
|
BLD-Final | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted 6/20/2001 11:19:53 AM
|
BLD-Final | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | NH |
Tony Young
|
|
|
6/14/2001 11:37:42 AM
|
BLD-Final | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | NH |
Tony Young
|
|
|
6/14/2001 11:37:42 AM
|
BLD-Final | 6/11/2001 | 6/13/2001 | 6/13/2001 | A | NR |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | PART |
Dave Hannah
|
|
|
shear Jim ###-#### Reinspection 4/19/2001 9:23:42 AMext shear panels back side of add ok to cover but need to check bolting of strape to foundation at final 4/19/2001 9:48:57 AM
|
BLD-Framing/Rough-in | 1/24/2001 | 1/25/2001 | 1/25/2001 | A | CANC |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 1/24/2001 1:48:31 PM see415 1/24/2001 3:13:09 PM
|
BLD-Framing/Rough-in | 1/25/2001 | 1/25/2001 | 1/25/2001 | A | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 1/25/2001 9:57:43 AM
energy code ok, ok to rock , exterior not ok to cover until shear nailing and straps are done in the back portion of house, need to verify interior strap on int. shear wall 1/25/2001 10:12:40 AM
|
BLD-Energy code compliance | 1/22/2001 | 1/24/2001 | 1/24/2001 | A | FAIL |
Dave Hannah
|
|
|
Blaine Const ###-####
|
BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 | A | PART |
Tony Young
|
|
|
jim-- ###-#### re-insp fr
ok to insulate, c/n posted on re-doing part of plan on shear/holddowns 1/19/2001 11:33:13 AM
|
Plan Reviewer's activity | | | 1/18/2001 | | DONE |
|
|
|
Builder came to resubmit plans per c/n...this is an issue to be handled in the field as the permit is already issued. builder has been referred to supervisor 325
|
BLD-Framing/Rough-in | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | FAIL |
Tony Young
|
|
|
FR INSP-RE-INSP -WILL- FOR HOMEOWNER- HOME ###-#### OR WORK AFTER 2 WILL BE ###-#### -PLANS BY NOTICE IN GAR
c/n posted, need eng.// plans redrawn, misc. items 1/11/2001 4:38:08 PM
|
BLD-Framing/Rough-in | 1/9/2001 | 1/10/2001 | 1/10/2001 | P | FAIL |
Steven Webb
|
|
|
###-####c/n issued, no approved plans on site, could not contact via telephone. 1/10/2001 1:54:46 PM
|
BLD-Foundation | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 10/26/2000 late am
wip ,ok 10/27/2000 10:46:00 AM
|
BLD-Footing | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Tony Young
|
|
|
Blain Const ###-#### ###-####
wip, on rear living portion, will try to form front part, garage if weather permits and pour at 1:30 10/26/2000 10:25:21 AM
|
BLD-Footing | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 10/26/2000
###-####, wip, ok on garage footings 10/26/2000 1:38:42 PM
|
(F) Reprint permit | | | 10/25/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/25/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/25/2000 | | DONE |
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 10/25/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 10/18/2000 | 10/18/2000 | 10/23/2000 | | PASS |
|
|
|
new site plan ok.
|
Routing - PUBLIC WORKS GRADING | 10/17/2000 | 10/17/2000 | 10/17/2000 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of approval in letter attached to plans. Subgrade must be inspected by the soils engineer before footings are poured.
|
Application received | | | 10/17/2000 | | |
|
|
|
|