Permit Information
Permit NumberBLD00-03120
StatusFinaled
Name TAHOE CONSTRUCTION
Site Address 5006 E ARROW JUNCTION DR
Project Name 
Customer Number888-4333
ePlanReviewNo
Description
This project is to build a new 2-story 2043s.f. single family dwelling with 1063s.f. on the main level and 980s.f. on the 2nd level, there is a detached garage of 660s.f. and 128s.f. of covered concrete porch..Zoned R-1C/DA per CUP98-0116=R-1M standards...rhj...PC#918...pep..12/7/2K THIS PRJECT IS MODIFIED FROM THE ORIGINAL DUE TO ADDING A 98S.F. UTILITY ROOM CONNECTING THE PREVIOUS DETACHED GARAGE, PLANS WERE MODIFIED BY A NEW DESIGNER AND ENGINEERING HAD TO BE MODIFIED/ADJUSTED TO ALLOW FOR FRAMING AND FOUNDATION SUPPORT CHANGES THERE WILL BE ADDED FEES TO THIS PROJECT FOR THE ADDED FLOOR AREA AND A NEW PLAN REVIEW FEE REQUIRED THE ADDED VALUE FOR FLOOR AREA IS $6370...PEP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/20/20013/20/20013/20/2001PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/20/2001 at 10:53:54. Contact: ###-####. C. of C. # 20232 3/20/2001 2:45:37 PM
BLD-Energy code compliance1/26/20011/26/20011/26/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/26/2001 at 07:28:33. Contact: ###-####.
BLD-Framing/Rough-in1/23/20011/24/20011/24/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/23/2001 at 12:22:50. Contact: ###-####. c/n issued, top plate strap, 4x4 connection, and complete air seal, ok to insulate. 1/24/2001 12:23:15 PM
BLD-Wall cover1/11/20011/12/20011/12/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/11/2001 at 15:31:19. Contact: ###-####. ok to cover 1/12/2001 10:45:14 AM
BLD-Wall cover1/9/20011/11/20011/11/2001AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/09/2001 at 15:45:51. Contact: ###-####. c/n issued: 1) MST 10:33:56 AM 37 straps needed per plans; 2) shear nailing for # 4 spacing required; 3) nailing needed above hd straps 1/11/2001 10:34:38 AM 1/11/2001 10:35:31 AM
BLD-Conference12/26/200012/26/200012/26/2000PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 12/26/2000 at 09:05:46. Contact: ###-####.
BLD-Foundation12/13/200012/13/200012/13/2000PPART
DetailsCarl Dependahl
foundation wall Clint ###-#### 14236 after beep...poured 12/13/2000 3:42:08 PM
BLD-Footing12/8/200012/11/200012/11/2000ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/08/2000 at 13:57:50. Contact: ###-####.
BLD-Footing12/11/200012/11/200012/11/2000PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/11/2000 at 11:19:27. Contact: ###-####.
BLD-Footing12/8/200012/8/200012/8/2000PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 12/08/2000 at 10:01:54. Contact: ###-####.
PLANS/APPL TAKEN TO FRONT DESK  12/7/2000 DONE
Telephone call  12/6/2000 DONE
jake returned call , said that plans/eng should be brought in this p.m. or tomorrow a.m. 12/7/2K..pep
Plan Reviewer's activity  12/1/2000 PART
received plans for project from the builder on 12/1/2k in the p.m. the polans have changed to now attach the garage and wants plan review approval. the new plans have been drawn by a different design firm and floor framing is not similar. I have called the engineer of record and he stated that he must see plans before he can sign off the eng for same. further review is stopped until a leter/ new approval from the eng of record is received on this project...pep
(F) Reprint permit  11/1/2000 DONE
Plan Review Report  11/1/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/1/2000 DONE
Inspection Record Card- Bld  11/1/2000 DONE
Issue PAID IN FULL permit  11/1/2000 DONE
Plan assigned to (PEP)10/30/2000 11/1/2000 PASS
DetailsPerry Paine
11/1/2000 08:57:48 PEP - activity updated through activity BLDA022 from case BLD00-03120.
CHANGE ISSUED DATE  11/1/2000  
Telephone call  10/31/2000 DONE
called designer on the non complying stairs at the landing must meet landing, or winder req..Mark will work on problem directly...
Telephone call  10/31/2000 DONE
faxed the winder info to mark waldorf
Pending Assignment by DJO10/18/2000 10/30/2000 DONE
DetailsDan Overy
10/30/2000 07:47:30 PEP - activity updated through activity BLDA176 from case BLD00-03120.
Routing - PUBLIC WORKS10/18/200010/18/200010/19/2000 PASS
Routing - PLANNING10/18/200010/18/200010/19/2000 PASS
Application received  10/18/2000  
Routing - PLAN CHECK10/19/200010/19/2000  PEND
Telephone call    PEND
no answer at the eng. left message with contracter I need verification of the written in hold down changes...plans are on hold pending explanation...
Telephone Call     
called media 1 no answer at ###-#### jake centers at ###-#### no answer left message to call me back.
Case Summary (BLD)     
Case Summary (BLD)