(F) Reprint permit | | | 4/20/2007 | | |
|
|
|
|
Fee Review-notes | 10/18/2000 | 10/18/2000 | 5/24/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 4/20/2001 | 4/20/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/19/2001 | 4/20/2001 | 4/20/2001 | A | PASS |
Rick Jackson
|
|
|
###-#### please call to meet out there...
|
BLD-Final | 4/19/2001 | 4/20/2001 | 4/20/2001 | A | PASS |
Jim Storey
|
|
|
###-#### please call to meet out there....
|
Permanent occupancy | | | 4/20/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8641 issued 4-20-01 to Sawtooth Investments.
|
BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/17/2001 9:27:23 AM w/ amanda
|
BLD-Final | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | PART |
Carl Dependahl
|
|
|
ok for t/o pend fire ok 4/16/2001 2:59:42 PM
|
Temporary occupancy | | | 4/16/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4536 issued 4-16-01 to Sawtooth Investments.
|
BLD-Final | 3/30/2001 | 4/2/2001 | 4/2/2001 | P | PART |
Jim Storey
|
|
|
ken-- ###-#### fn occ temp ok 4/2/2001 5:09:37 PM
|
FIRE-Final Inspection | 4/2/2001 | 3/30/2001 | 3/30/2001 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 4/2/2001 8:33:15 AM awaiting alarm changes; space has emporary alarms installed
|
BLD-Framing/Rough-in | 3/22/2001 | 3/23/2001 | 3/23/2001 | P | PART |
Carl Dependahl
|
|
|
CEILING\\###-####\\BEFORE 2:00 OR AFTER 3:30
|
FIRE-Sprinkler Rough-in | 3/22/2001 | 3/23/2001 | 3/23/2001 | A | PASS |
Rick Jackson
|
|
|
###-#### okay to cover 3/23/2001 10:37:03 AM
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### ok to cover walls, patch holes at existing exit enclosure 2/13/2001 12:39:41 PM
|
Issue PAID IN FULL permit | | | 1/24/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/15/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/15/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/15/2000 | | DONE |
|
|
|
called permit ready
|
Routing - FIRE | 11/9/2000 | 11/14/2000 | 11/14/2000 | | DONE |
Bill Alexander
|
|
|
|
Plan assigned to (CJW) | 10/24/2000 | | 11/14/2000 | | PASS |
Carl Westfall
|
|
|
11/14/00 15:47:36 CJW - activity updated through activity BLDA022 from case BLD00-03126.
|
Plan Review Completed(1st rev) | | | 11/14/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/14/2000 | | 11/14/2000 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/26/2000 | | 11/9/2000 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 11/9/2000 | | PASS |
|
|
|
UBC plan review started November 9, 2000 and finished the same day. The drawings were approved with conditions. See the conditions list.
|
Plan resubmittals received | | | 11/1/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A0.1, A2.1, A2.2. PUT WITH PLANS. KMM
|
Routing - PUBLIC WORKS | 10/24/2000 | | 10/26/2000 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/25/2000 | | DONE |
|
|
|
RECEIVED DIMENSIONED FLOOR PLAN 8 X 11 1/2. WILL LET CARL ASK FOR A LARGE FLOOR PLAN WHEN HE ASKS FOR RESUBMITTALS. RECEIVED LETTER ADDRESSING THE 97 CODE AND FIRE ALARM SYSTEM DESIGN. PUT WITH PLANS. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 10/19/2000 | | |
|
|
|
REQUIRES 1. FULLY DIMENSIONED PLANS.
2. STATED THE USE OF THE 94 CODE.
FAXED TO OTTIS LEMMON. KMM
|
Received Certificate of Value | | | 10/18/2000 | | DONE |
|
|
|
|
Application received | | | 10/18/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/18/2000 | | DONE |
|
|
|
|