Permit Information
Permit NumberBLD00-03143
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMIC#24-AMMONIA
Customer NumberPCS003409
ePlanReviewNo
Description
MICRON BUILDING #24C - INSTALL AMMONIA SEGREGATED EXHAUST - (PCS 24-20003409) * TO CONSTRUCT AN APPROXIMATE 1200 SQ. FT. AMMONIA SCRUBBER MECHANICAL PENTHOUSE ENCLOSURE AT THE ROOF OF BUILDING #24C, BETWEEN GRID LINES 17.3&18.7 AND AB&B. THE PENTHOUSE IS CONSTRUCTRED OF STEEL STRUCTURAL FRAME, CONCRETE OVER METAL DECK FLOOR, METAL STUDS AND METAL ROOF DECK WITH SINGLE PLY ROOFING. THIS PERMIT ALSO INCLUDES INSTALLING METAL ACCESS STAIRS AND RELATED PSP DUCT WORK. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH00-00201/PC#869-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes10/19/200010/19/20006/12/2001 DONE
Letter of compliance  6/11/2001 DONE
Letter of Compliance #21522 issued 6-11-01.
Code Occupancy Approval  6/11/2001 PASS
COMPLETED AS REQUIRED BY DRH00-00201 FINAL SIGNED OFF.
Print Occupancy Form  6/4/2001 DONE
BLD-Final5/31/20016/1/20016/1/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/31/2001 at 12:35:12. Contact: ###-####. final ok pending p&z sign off. 6/4/2001 12:11:47 PM
FIRE-Final Inspection5/30/20015/30/20015/30/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 5/30/2001 9:51:44 AM
BLD-Framing/Rough-in5/25/20015/29/20015/29/2001ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/25/2001 at 09:51:26. Contact: ###-####. Cancelled by contractor 5/30/2001 7:37:36 AM
FIRE-Final Inspection5/8/20015/10/20015/10/2001ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/08/2001 at 10:37:33. Contact: ###-####.
BLD-Framing/Rough-in2/8/20012/9/20012/9/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/08/2001 at 15:03:15. Contact: ###-####.
BLD-Framing/Rough-in1/24/20011/25/20011/25/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/24/2001 at 10:09:41. Contact: ###-####. part of wall fire safing in place still pending deck engineering before placement/ eifs wall rfi needed for scruber 2 nd floor. 1/25/2001 11:43:27 AM
BLD-Framing/Rough-in1/18/20011/19/20011/19/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/18/2001 at 14:29:48. Contact: ###-####. need engineering for roof to floor changes. 1/19/2001 11:53:20 AM
BLD-Framing/Rough-in1/8/20011/9/20011/9/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/08/2001 at 13:42:41. Contact: ###-####. head height ok. work in progess. 1/9/2001 1:27:37 PM
BLD-Framing/Rough-in12/29/20001/2/20011/2/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2000 at 14:38:27. Contact: ###-####.
BLD-Other12/28/200012/29/200012/29/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/28/2000 at 07:29:36. Contact: ###-####.
BLD-Framing/Rough-in12/26/200012/27/200012/27/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2000 at 14:59:29. Contact: ###-####. roof decking work in progess/pudel welding not ready for inspect/ need engineer proceger for ut of full pen welds with backer bars left in place/ recieved special insp. scope of work. 12/27/2000 11:53:33 AM
Routing - FIRE12/12/2000 12/22/2000 PASS
OH HOLD pending meeting 12/19 with Micron. All outstanding issues resolved at meeting of 12/19.
Routing - PLAN CHECK12/21/2000 12/21/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/21/2000 PASS
Inspection Record Card- Bld  12/21/2000 DONE
Print Occupancy Form  12/21/2000 DONE
Telephone call  12/21/2000 DONE
permit ready ###-#### Frank
Issue & PRINT to be Invoiced  12/21/2000 DONE
Plan assigned to (JCM)10/20/2000 12/21/2000 PASS
DetailsJohn Menard
12/21/00 13:22:43 JCM - activity updated through activity BLDA022 from case BLD00-03143.
Routing - PLAN CHECK11/3/2000 12/12/2000  
Routing Off Site - STRUCTURAL11/21/2000 12/7/2000 PASS
RECEIVED LETTER FROM CONSULTING ENGINEER APPROVING RESUBMITTALS WITH ONE COMMENT TO BE ADDRESSED BY CITY PLAN REVIEWER. JCM
Plan resubmittals received  11/28/2000 DONE
Received three sets of plan resubmittals from Micron, sheets E3 and E4 and three sets of caculations. Forwarded same to John Menard. 11/28/00 DAR
Plan resubmittals received  11/21/2000 DONE
Received one copy of response letter, one copy of soils report and boring location map, one copy of structural plan review response (Pinnacle), three copies revised structural sheet S3 and one copy additional calculations. Routed to John M. KMM
Plan resubmittals requested  11/7/2000  
FAXED PAUL MARCOLINA A COPY OF THE COMMENT LIST FROM THE CUNSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS. JCM
Routing Off Site - STRUCTURAL10/20/2000 11/6/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM RECEIVED A FAX FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS. JCM
Routing - FIRE10/31/2000 11/3/2000 FAIL
faxed comments to Micron
Plan Review Completed(1st rev)  11/3/2000 FAIL
failed bldg and fire reviews
Plan resubmittals requested  10/31/2000  
E-MAILED FRANK KVAPIL AT MICRON REQUESTING ADDITIONAL INFORMATION. JCM
Routing - PLAN CHECK10/27/2000 10/31/2000 FAIL
Routing - PLUMBING10/24/2000 10/27/2000 PASS
provide drainage for emergency shower
Routing - PLANNING3/23/2000 10/24/2000 PASS
Please see DRH00-201
Routing - PUBLIC WORKS10/20/2000 10/23/2000 PASS
Plan routing begun/NEW & ADDTN  10/20/2000 DONE
Plans ACCEPTED BY PLAN TECH  10/20/2000 DONE
Pending Assignment by MYS10/19/2000 10/20/2000 DONE
DetailsMarlene Southard
10/20/00 09:14:04 KMM - activity updated through activity BLDA166 from case BLD00-03143.
Application received  10/19/2000  
Received Certificate of Value  10/19/2000 DONE