Fee Review-notes | 10/23/2000 | 10/23/2000 | 5/24/2001 | | DONE |
|
|
|
who did the hvac??
|
Letter of compliance | | | 5/10/2001 | | DONE |
|
|
|
Letter of Compliance #21494 issued 5-10-01.
|
BLD-Final | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 10:42:26. Contact: ###-####.
|
Code Occupancy Approval | | | 4/30/2001 | | PASS |
|
|
|
After staffing with Martin Santoya, site was approved.
|
BLD-Final | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 15:38:49. Contact: ###-####. struct items ok, rec'd eng's letter, need p&z. 4/27/2001 10:08:23 AM
|
FIRE-Final Inspection | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Rick Jackson
|
|
|
###-#### herb
|
BLD-Final | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | FAIL |
Carl Dependahl
|
|
|
herb ###-#### c/n, firestops at bsmt, rails, landscape, other finals 4/17/2001 5:48:40 PM
|
BLD-Conference | 4/10/2001 | 4/10/2001 | 4/10/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/10/2001 9:30:29 AM w/ Herb, install int shear panels or??? will consult
|
BLD-Framing/Rough-in | 3/2/2001 | 3/5/2001 | 3/5/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 10:18:07. Contact: ###-####. c/n, shear wall3, fire blocks & stops at bsmt, draftstop 3/5/2001 12:33:13 PM
|
BLD-Conference | 2/23/2001 | 2/23/2001 | 2/23/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/23/2001 9:47:16 AM w/ K-2 const re truss components...ok per letter
|
BLD-Framing/Rough-in | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 09:23:59. Contact: ###-####.ok to sheetrock basement. 2/20/2001 3:35:31 PM
|
BLD-Framing/Rough-in | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 10:04:43. Contact: ###-####. ext nailing ok 2/13/2001 4:05:01 PM
|
BLD-Framing/Rough-in | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 10:04:43. Contact: ###-####. ext nailing ok 2/13/2001 4:05:01 PM
|
BLD-Conference | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/13/2001 2:35:38 PM sel. struct or #1 ok for truss a-1, a or b.
|
BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/8/2001 10:43:03 AM w/ truss bldr; will fax info
|
BLD-Framing/Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/6/2001 10:24:32 AM trusses a-1 a&b req 2100 psi bottom chord lumber, verify.
|
BLD-Conference | 1/24/2001 | 1/24/2001 | 1/24/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/24/2001 9:41:33 AM w/bldr re truss info
|
BLD-Foundation | 1/16/2001 | 1/16/2001 | 1/16/2001 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 1/16/2001 2:05:07 PM
ok w/ verbal corrections 1/16/2001 2:06:02 PM
|
BLD-Footing | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/10/2001 at 09:22:21. Contact: ###-####.
|
(F) Reprint permit | | | 12/21/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/20/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/8/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/8/2000 | | DONE |
|
|
|
|
Telephone call | | | 12/8/2000 | | DONE |
|
|
|
called permit ready
|
Routing - PLAN CHECK | 12/4/2000 | | 12/7/2000 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 12/7/2000 | | PASS |
|
|
|
I received a copy of the signed density reduction survey; however, It was not a copy of the recorded survey. I e-mailed the architect and requested a copy of the recorded survey for our files.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2000 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 10/24/2000 | | 12/7/2000 | | PASS |
John Menard
|
|
|
12/7/00 13:29:36 JCM - activity updated through activity BLDA022 from case BLD00-03174.
|
Routing - PLANNING | 11/30/2000 | | 12/4/2000 | | MGS |
|
|
|
Approved per DRH00-197.
|
Routing - PUBLIC WORKS | 11/28/2000 | | 11/30/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/22/2000 | | 11/28/2000 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/27/2000 | | 11/28/2000 | | PASS |
|
|
|
Contacted PDQ to take response to plan review comments dated ll-16-00 to outside eng. KMM RECEIVED A FAX FROM THE CONSULTING ENGINEER APPROVING THE RESUBMITTED STRUCTURAL INFORMATION. JCM
|
Plan Reviewer's activity | | | 11/28/2000 | | PEND |
|
|
|
REVIEWED AND APPROVED RESUMBITTED REVISED PLAN SHEET. WILL APPROVE PLANS AFTER THE DENSITY REDUCTION SURVEY IS RECORDED. JCM
|
Plan resubmittals requested | | | 11/22/2000 | | FAIL |
|
|
|
E-MAILED THE ARCHITECT OF RECORD TO REQUEST A DENSITY REDUCTION SURVEY FOR THIS PROJECT BUILDING SITE. JCM
|
Routing - PLAN CHECK | 11/21/2000 | | 11/22/2000 | | |
|
|
|
|
Plan resubmittals received | | | 11/22/2000 | | DONE |
|
|
|
Received three copies of revised sheet A-3.0 and three copies of cover letter from JGT Architecture PA. Routed to John M. KMM
|
Routing - FIRE | 11/22/2000 | | 11/22/2000 | | PASS |
|
|
|
Requested info received 11/22/00
|
Plan Review Completed(1st rev) | | | 11/21/2000 | | FAIL |
|
|
|
|
Routing - FIRE | 11/16/2000 | | 11/21/2000 | | FAIL |
|
|
|
faxed comments to architect
|
Routing Off Site - STRUCTURAL | 10/24/2000 | | 11/16/2000 | | FAIL |
|
|
|
FORWARDED STRUCTURAL PLANS TO CONSULTANTING ENGINEER FOR STRUCTURAL REVIEW. 10/24/00 DAR
|
Plan resubmittals requested | | | 11/16/2000 | | FAIL |
|
|
|
FAXED THE ARCHITECT OF RECORD A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER AND A COPY OF MY COMMENT LIST REQUESTING REVISIONS. JCM
|
Routing - PLAN CHECK | 11/15/2000 | | 11/16/2000 | | FAIL |
|
|
|
|
Routing - PLUMBING | 11/6/2000 | | 11/15/2000 | | PASS |
|
|
|
refer to bld00-03173 for review comments
|
Routing - PLANNING | 10/30/2000 | | 11/3/2000 | | FAIL |
|
|
|
Plans do not meet conditions of approval in DRH00-197
|
Routing - PUBLIC WORKS | 10/24/2000 | | 10/30/2000 | | FAIL |
|
|
|
REQUIRES O & M PLAN PLUS GEO TECH REPORT PER BRIAN MURPHY. 10/30/00 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 10/24/2000 | | DONE |
|
|
|
|
Application received | | | 10/23/2000 | | |
|
|
|
|