Permit Information
Permit NumberBLD00-03194
StatusFinaled
Name LARRY MILLER AUTO GROUP
Site Address 222 S AUTO DR
Project Name 
Customer Number 
ePlanReviewNo
Description
LARRY H. MILLER SUNDANCE DODGE AUTO FACILITY EXPANSION -TO CONSTRUCT A NEW 51,245 SQ. FT., TWO STORY, AUTO SALES AND SERVICE FACILITY EXPANSION AT THE SOUTH SIDE OF THE EXISTING SUNDANCE DODGE AUTO FACILITY. THE EXPANSION WILL INCLUDE A SHOW ROOM, AUTO PARTS AND SERVICE AREAS. THE EXPANSION WILL BE CONSTRUCTED OF MASONRY EXTERIOR WALLS, STEEL STRUCTURAL FRAME AND METAL ROOF SYSTEM. THIS EXPANSION IS BEING SEPARATED FROM THE EXISTING BUILDING BY A NEW FOUR-HOUR FIRE-RESISTIVE MASONRY AREA SEPARATION WALL. THIS BUILDING WILL BE FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR ALLOWABLE AREA INCREASE. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS PERMIT IS FOR PHASE I OF THIS PROJECT. PHASE II IS TO DEMOLISH A PORTION OF THE EXISTING BUILDING AND REMODEL THE REMAINING PORTION. THIS PERMIT DOES NOT INCLUDE THE APPROVAL OF ANY WORK INCLUDED IN PHASE II. A SEPARATE REVIEW AND PERMIT WILL BE REQUIRED TO DO THE WORK ON PHASE II. DRH00-00150/CUP00-00099/PC#893-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/14/2012 DONE
Permanent Occupancy 3/13/20023/13/2002 DONE
Details
BLD-Final3/13/20023/13/20023/13/2002PDONE
DetailsRuss Owen
Final ok/perm. occ. cert.
Permanent occupancy UNPAID FEE  3/13/2002 DONE
Perm. Occ. Cert. #4640 issued 11-13-01 to Larry H. Miller Sundance Dodge.
Telephone call  1/28/2002 DONE
Talked w/Tom McAdams re: temp. occ. & he will send a letter requesting extension for completion of DR/CU requirements.
Office Staff conference/action  1/28/2002 DONE
Temp. Occ. extended thru 4-13-02 per Tim Hogland.
Fee Review-notes10/25/200010/25/20001/14/2002 DONE
left mesg. at office(GC) for robert
BLD-Conference12/17/200112/17/200112/17/2001PPART
DetailsRuss Owen
Added by Inspector: 407 On 12/17/2001 2:10:24 PM need detail for 4 hour fire wall, ul u901, need to fully grout cells,first pour has been done and has not been fully grouted, called architect will need to provide details for 4 hour compliance,also contractor on site notified.
FIRE-Final Inspection11/12/200111/13/200111/13/2001APASS
DetailsTroy Cobbley
OK for perm occ 11/13/2001 3:41:16 PM
BLD-Conference11/13/200111/13/200111/13/2001ACANC
DetailsJim Storey
Added by Inspector: 301 On 11/13/2001 11:00:54 AM
Temporary occupancy  11/13/2001 PART
Temp. Occ. Cert. #4640 issued 11-13-01 to Larry Miller Sundance Dodge.
BLD-Final11/7/200111/9/200111/9/2001AFAIL
DetailsRuss Owen
Needs Fire/Life Safety, ACHD, Zoning, also rest room signage,fire caulk at auto repair, complete all hand rail installations. 11/9/2001 2:10:17 PM
FIRE-Final Inspection11/7/200111/9/200111/9/2001ANR
DetailsTroy Cobbley
fire alarm and fire sprinkler inspection were not complete 11/12/2001 9:30:26 PM
BLD-Final11/9/200111/9/200111/9/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 11/9/2001 2:12:59 PM Ok for temp oc if the Fire/Life Safety inspector signs card and ACHD. 11/9/2001 4:39:02 PM
Code Occupancy Approval  11/9/2001 FAIL
BOND POSTED FOR $5528.00 TEMP SIGNED OFF.
Code Occupancy Approval  11/8/2001 FAIL
ALL LAND SCAPE IS NOT IN AS REQUIRED UNDER DRH00-00150, A BOND AMOUNT WAS APPROVED AT $5528.OO, WHEN RECEIVED WILL SIGN TEMP.
BLD-Conference11/2/200111/5/200111/5/2001APART
DetailsRuss Owen
###-#### Tom> went over req for final . Need all signatures on card, also I have the final s-i report given to me this day, needs all handrails and fire caulking done,1 sink needs to be raised,strrage rack needs to be moved out from door. no c/n at ths time walk thru only would like to possibly obtain t.c.o by friday. 11/5/2001 12:33:44 PM 11/5/2001 12:34:28 PM
FIRE-Conference11/2/200111/5/200111/5/2001ADONE
DetailsTroy Cobbley
discussed fire doors with superintendant 11/5/2001 3:41:03 PM
BLD-Final10/19/200110/19/200110/19/2001PPART
DetailsRuss Owen
###-#### AL . went over req for final . 10/19/2001 3:55:19 PM
BLD-Framing/Rough-in10/3/200110/3/200110/3/2001APART
DetailsRuss Owen
Scheduled by Inspector: 407 On 10/3/2001 11:43:22 AM grid ceiling. 10/3/2001 11:49:41 AM
BLD-Framing/Rough-in10/1/200110/1/200110/1/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 10/1/2001 4:32:05 PM . Need pods at upper floor and lower floor ceilng at the north side also slack wires on the round drop in lights at all areas contractor and electrical contractor notified. Made copy of the requirement gave to general contractor from volume 3 of building code. 10/1/2001 4:59:13 PM
BLD-Framing/Rough-in9/18/20019/19/20019/19/2001ACANC
DetailsTom Arcoraci
jay- ###-####
BLD-Framing/Rough-in9/17/20019/18/20019/18/2001ANR
DetailsRuss Owen
fr jay- ###-####
BLD-Framing/Rough-in9/17/20019/17/20019/17/2001PPART
DetailsRuss Owen
###-#### . need to complete sheetrocking and penetrations of 1 hr stair well . 9/17/2001 2:42:47 PM
BLD-Framing/Rough-in8/24/20018/24/20018/24/2001PPART
DetailsRuss Owen
###-#### al . ok to cover 2nd floor non bearing walls. 8/27/2001 2:34:42 PM
BLD-Conference8/18/20018/20/20018/20/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/18/2001 at 08:24:01. Contact: ###-####.info for req of temp oc. 8/20/2001 11:01:59 AM
BLD-Conference8/20/20018/20/20018/20/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/20/2001 3:55:43 PM . went over the 1 hour stair corridor ,the walls will be continous up to the metal roof deck, and the need for a shaft to the skylight would not be required ,if acceptable to architect,also went over this with plan reveiw. 8/20/2001 3:59:46 PM
BLD-Conference8/13/20018/14/20018/14/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/13/2001 at 16:27:27. Contact: .
BLD-Framing/Rough-in8/8/20018/8/20018/8/2001APART
DetailsRuss Owen
###-#### al sparks . need resubmittals for s-3 service area firewall and stairs which are 1 hour rated,also exhaust shaft. 8/9/2001 12:17:20 PM
BLD-Framing/Rough-in8/2/20018/3/20018/3/2001ACANC
DetailsRuss Owen
###-####
BLD-Framing/Rough-in8/3/20018/3/20018/3/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/3/2001 11:21:22 AM . ok to cover lower floor walls at rear rest rooms offices. 8/3/2001 4:41:42 PM
BLD-Framing/Rough-in7/27/20017/27/20017/27/2001PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/27/2001 at 07:54:39. Contact: .need a fire damper in the auto parts room,also prior note needs to be addressed also the 1 hour duct chase for exhaust ,also plumbing inspection. they called for a lower floor partial area only. 7/27/2001 3:50:13 PM
BLD-Framing/Rough-in7/19/20017/23/20017/23/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/19/2001 at 09:56:32. Contact: ###-####.shaft for exhaust duct,may seek approval for fire 7/23/2001 1:05:25 PM damper at conc floor also auto inspection area ,may seek change order to delete 1 hour occupancy,but no approvals at this time. 3/2001 1:06:24 PM 7/23/2001 1:06:50 PM
BLD-Footing5/1/20015/1/20015/1/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/01/2001 at 10:59:20. Contact: .ok subject to s-i. 12/2/2001 9:27:07 AM
BLD-Footing4/27/20014/27/20014/27/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/27/2001 at 11:01:25. Contact: .
BLD-Footing4/24/20014/24/20014/24/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/24/2001 at 07:16:11. Contact: . Subject to approval from Special inspector. 11/24/2001 4:11:29 PM
BLD-Footing4/20/20014/23/20014/23/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/20/2001 at 16:25:37. Contact: .s-i required. 11/24/2001 9:42:14 AM
BLD-Footing4/18/20014/19/20014/19/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/18/2001 at 07:42:54. Contact: . 11/19/2001 1:17:36 PM11/19/2001 1:17:38 PMs work in progress, meet with contractor special inspection will be performed when complete. 11/19/2001 1:18:53 PM
BLD-Footing4/18/20014/19/20014/19/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/18/2001 at 07:42:54. Contact: . 11/19/2001 1:17:36 PM11/19/2001 1:17:38 PMs work in progress, meet with contractor special inspection will be performed when complete. 11/19/2001 1:18:53 PM
BLD-Footing4/16/20014/16/20014/16/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/16/2001 at 10:44:12. Contact: ###-####. ok subject to s-i. 11/16/2001 4:39:21 PM
BLD-Footing4/10/20014/11/20014/11/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/10/2001 at 18:19:57. Contact: ###-####.subject to s-i. 4/11/2001 4:08:35 PM
BLD-Concrete4/5/20014/6/20014/6/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/05/2001 at 17:26:18. Contact: . MTI on site for lower elevator shaft of elevator. 4/6/2001 12:03:29 PM
BLD-Footing4/4/20014/4/20014/4/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/04/2001 at 09:38:51. Contact: ###-####. 2 10x10 footing and elevator shaft footingds ok. 4/4/2001 3:53:00 PM
BLD-Conference3/30/20014/3/20014/3/2001APART
DetailsRuss Owen
FOR CONF-- -- AL-- ###-#### -CALL 1ST BEFORE INSP
Override - Parcel Holds  3/13/2001  
Issue PAID IN FULL permit  3/13/2001 DONE
Plan resubmittals received  2/13/2001 DONE
Received two copies of revised sheets A-105, A-107, A-109. One copy of cover letter to John M. Routed to John M. KMM
Plan Reviewer's activity  2/13/2001 PASS
Reviewed and approved plan resubmittals for permit issue with one item being required as a deferred submittal prior to construction (2/6/01) JCM Received requested deferred submittal and inserted prior to issue of permit. JCM
Telephone call  2/6/2001 DONE
1-###-#### GAVE DOLLAR AMOUNT AND HE STILL NEEDS TO BRING IN ACHD.
Plan resubmittals requested  2/6/2001  
Faxed the architect to advise him that I was releasing the plans for permit; however, there was still one outstanding item that must be submitted for review and approval, as a deferred submittal, prior to construction in the field. JCM
PLANS/APPL TAKEN TO FRONT DESK  2/6/2001 PASS
Inspection Record Card- Bld  2/6/2001 DONE
Print Occupancy Form  2/6/2001 DONE
Routing - PLAN CHECK2/1/2001 2/6/2001 PASS
Plan assigned to (JCM)10/27/2000 2/6/2001 PASS
DetailsJohn Menard
2/6/01 14:13:48 JCM - activity updated through activity BLDA022 from case BLD00-03194.
Plan resubmittals received  2/5/2001 DONE
Received plan resubmittals from FFKR Architects, Jose Sanchez, forwarded same to John Menard plus small documents. 2/5/01 DAR
Plan resubmittals received  2/1/2001 DONE
Received one copy of letter to Sam R. and John M. One copy of Hazardous material evaluation Part A,B and C. for Sam and John. One copy of Hazardous Material Evaulation Part D for Sam. Routed to Sam and John. KMM
Plan resubmittals received  1/31/2001 DONE
Received two hard copies of sheet G-004 showing the location of the new fire hydrant.
One copy of letter from United Water Idaho informing of available flow of 1,750.
One copy of letter from Unied Water Idaho informing of installation extimated cost.
One copy of hazardous matierials inventory from Megan Davis Environmental Consulting. Routed to Sam R. KMM
Routing - PLAN CHECK1/26/2001 1/31/2001  
Routing - FIRE1/31/2001 1/31/2001 PASS
Resubmittal satisfactory.
Plan resubmittals received  1/31/2001 DONE
Received two copies of revised sheets G-002, A-102, A-105, A-106, A-107, A-401, A-401A AND A-601. One copy of cover letter from Jose Sanchez. Routed to John M. KMM
Routing - FIRE1/24/2001 1/26/2001 PEND
Required Saz Mat Classification not included; being prepared by Megan Davis, Consultant. Expect report to be completed by 1/31/01
Plan resubmittals requested  1/24/2001  
Faxed the architect a request for additional revisions. JCM
Plan resubmittals received  1/11/2001 DONE
Received two full size sets of plans stamped and signed of those sheets that have veen corrected and added. One copy of response letter from FFKR Architecture. KMM
Routing - PLUMBING1/5/20011/5/20011/5/2001 PASS
provide a vent from the upstream compartment of the interceptor thru roof, extend vent downstream of interceptor thru roof. extend discharge diptube to with in 24" of tank bottom.
Routing - PLAN CHECK12/27/2000 1/5/2001  
Routing - FIRE12/14/200012/19/200012/27/2000 FAIL
DetailsBill Alexander
12/20/00 Fed Exed.to Floyd. KMM 12/27/00 plans received back from Floyd. Routed to Fire. KMM
*Lack HAZMAT information, fire flows and locations.
Plan Review Completed(1st rev)  12/27/2000 FAIL
Routing Off Site - STRUCTURAL12/14/2000 12/26/2000 PASS
Sent plan resubmittals to structurl engneer via PDQ. 12/14/00 DAR Forwarded,by fax, a copy of the response letter and additional calculations to the consulting engineer. 12/22/00 JCM Received a letter from the consulting engineer approving resubmittals. JCM
Plan resubmittals received  12/22/2000 DONE
Received one copy of revised calculations of the changes and one copy of line item response to the structural review comments. This information is meant to be as part of the drawings sent with revisions in Dec. 12/00 sheets: S2.1, S2.4, S5.2 & S.7.2. Routed to John M. KMM
Plan Reviewer's activity  12/22/2000  
FORWARDED, BY FAX, A COPY OF THE STRUCTURAL RESPONSE LETTER AND ADDITIONAL CALCUATIONS TO THE CONSULTING ENGINEER.
Telephone call  12/21/2000 DONE
Left a message with Jeff Fisher at ###-#### asking for the revised calcs to go with the revised S sheets we received on 12/13/00. I also asked for the line item response to comments. All per John M. KMM
Plan resubmittals requested  12/14/2000 FAIL
MAILED THE ARCHITECT OF RECORD A COPY OF THE COMMENT LIST REQUESTING REVISIONS. JCM
Routing - PLAN CHECK11/20/2000 12/14/2000  
Plan resubmittals received  12/13/2000 DONE
Received 3 sets of resubmittal plans sheets S-2.1, S-2.4,S--5.2 AND S-7.2 forwarded same to JCM. 12/13/00 DAR
Plan resubmittals received  12/1/2000 DONE
Received two copies of revised sheets G007 and G009. Routed to John M. KMM
Plan resubmittals received  12/1/2000 DONE
Received two copies of revised plumbing plans P-202 and P-501. Routed to John M. KMM
Plan resubmittals requested  11/30/2000  
FAXED JEFF FISHER A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS. JCM
Routing - PLUMBING11/8/2000 11/20/2000 FAIL
provide detail of and location of an oil and flammable liquids interceptor, connected to the sanitary sewer system for wastes from the shop area, auto inspection area, and wash/detail area. provide a plan showing all roof drainage piping connections to the site drainage system, water heater t&p drains in the shop area must be piped to a drain or exterior, not to the water heater drip pan.
Routing Off Site - STRUCTURAL10/27/2000 11/9/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM RECEIVED COMMENT LIST FROM CONSULTING ENGINEER REQUESTING REVISIONS.
Routing - PLANNING11/3/2000 11/8/2000 PASS
Proposed signs are not approved with this application. Separate sign application must be submitted. TAC
Approved per conditions of approval in DRH00-150.
Routing - PUBLIC WORKS11/1/2000 11/3/2000 PASS
Plan routing begun/NEW & ADDTN  11/1/2000 DONE
Plans ACCEPTED BY PLAN TECH  11/1/2000 PASS
Plan routing begun/NEW & ADDTN  10/27/2000 HOLD
Plans ACCEPTED BY PLAN TECH  10/27/2000 HOLD
REQUIRES 1. ARCH./ENG. RECORD FORM TO BE SIGNED.
2. SHEETS A-603, A-604, A-701 WERE STAMPED BUT NOT SIGNED.
CONTACTED JEFF FISHER / JOSE SANCHEZ OF THESE NEEDS. THEY WERE TOLD I CANNOT ROUTE IN HOUSE UNTIL O & M MANUEL IS RECEIVED. I CONTACTED EARL OF B & A ENGINEERING TO AQUIRE THE O & M. KMM
10/27/00 RECEIVED ARCH./ ENG. RECORD FORM.
10/31/00 Received O & M manual.
11/1/00 RECEIVED THREE COPIES OF STAMPED AND SIGNED SHEETS A-603, A-604 & A-701. PUT WITH PLANS. KMM
Received Certificate of Value  10/25/2000 DONE
Application received  10/25/2000  
Override - Parcel Holds  10/25/2000  
Recd Pcfee & Taken To Pln CK  10/25/2000 DONE