Permit NumberBLD00-03202
StatusFinaled
Name SIMPLOT AGRIBUSINESS
Site Address 418 S 9TH ST Unit: (1 FLR)
Project Name9TH STREET WAREHOUSES
Customer Number 
ePlanReviewNo
Description
(SIMPLOT AGRIBUSINESS) Fire sprinklers used to substitute for 1-hr fire-resistive construction of the building. To construct tenant improvements within an existing 2,759 square foot space on the first floor (Southwest corner) of an existing historic building. Work is to include interior nonbearing walls, millwork, interior finishes, and an access floor system all per approved drawings and plan review conditions on file. Fire sprinkler heads shall be located to comply with NFPA 13-1996 as regulated by the Fire Department. PC-894-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes10/25/200010/25/20005/25/2001 DONE
Permanent occupancy UNPAID FEE  1/22/2001 DONE
Perm. Occ. Cert. #8545 issued 1-22-01 to Simplot Agribusiness on the 1st floor.
Permanent Occupancy 1/17/20011/17/2001 DONE
Details
BLD-Final1/16/20011/17/20011/17/2001APASS
DetailsCarl Dependahl
FN OCC PHIL ###-####
FIRE-Final Inspection1/16/20011/16/20011/16/2001PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 1/16/2001 2:25:46 PM
BLD-Final1/12/20011/12/20011/12/2001PNR
DetailsCarl Dependahl
Phil ###-####, called left msg, need fire 1/12/2001 5:19:04 PM
FIRE-Conference12/19/200012/19/200012/21/2000PFAIL
DetailsRick Jackson
Phil ###-####/// met with architect about exiting and occupant loads 12/21/2000 10:36:54 AM
BLD-Framing/Rough-in12/14/200012/14/200012/14/2000PPART
DetailsCarl Dependahl
fr phil-- ###-####
Issue PAID IN FULL permit  11/27/2000 DONE
Plan assigned to (CJW)10/27/2000 11/21/2000 PASS
DetailsCarl Westfall
11/21/00 10:48:56 CJW - activity updated through activity BLDA022 from case BLD00-03202.
Routing - PLAN CHECK11/21/2000 11/21/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/21/2000 PASS
Inspection Record Card- Bld  11/21/2000 DONE
Print Occupancy Form  11/21/2000 DONE
Telephone call  11/21/2000 DONE
LEFT MESS FOR MARK THAT PERMIT IS READY
Routing - FIRE11/16/200011/21/200011/20/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  11/20/2000 PASS
Routing - PLAN CHECK10/31/2000 11/16/2000 PASS
Plan Reviewer's activity  11/15/2000 PASS
UBC plan review started November 15, 2000 and finished the next day. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS10/27/2000 10/31/2000 PASS
Pending Assignment by MYS10/25/2000 10/27/2000 DONE
DetailsMarlene Southard
Plan resubmittals received  10/27/2000 DONE
PLAN RESUBMITTALS RECEIVED FROM CSHQA TWO SETS OF A2.1AND SMALL DOCUMENTS FORWARDED SAME TO CARL WESTFALL. 10/27/00 DAR
Plans ACCEPTED BY PLAN TECH  10/26/2000 DONE
FAXED JOHN MULIN THE REQUIREMENTS THAT FULLY DIMENSIONED PLANS WERE REQUIRED AND TENANT SIZE AND FLOOR WERE REQUIRED, PLUSUSAGE OF ALL ROOMS NEED TO BE LISTED. 10/26/00 DAR
Override - Parcel Holds  10/25/2000  
Recd Pcfee & Taken To Pln CK  10/25/2000 DONE
Application received  10/25/2000  