BLD-Final | 3/15/2002 | 3/18/2002 | 3/18/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 12:32:20. Contact: ###-####.
|
BLD-Final | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 3/18/2002 11:30:52 AM Call ###-#### for access. 3/18/2002 11:34:45 AM.NOT the right permit I added in wrong number. 3/18/2002 12:19:52 PM
|
DOC - Permit Finaled | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 3/18/2002 11:56:54 AM
|
BLD-Final | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | FAIL |
Dave Hannah
|
|
|
###-####ROBINCALL BEFORE YOU GO c/n on site 11/16/2001 11:33:14 AM
|
BLD-Grading Inspection | 11/16/2001 | 11/16/2001 | 11/16/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading is approved.
|
BLD-Conference | 7/11/2001 | 7/16/2001 | 7/16/2001 | A | PASS |
Tony Young
|
|
|
conf. on final, mech. room ceiling need not be rocked, just fire blocks/ mineral wool above walls in floor joists cavities per owners request 7/16/2001 2:32:58 PM
|
BLD-Conference | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Tony Young
|
|
|
CALL FIRST ###-####
conf. on final 7/11/2001 3:27:14 PM
|
BLD-Energy code compliance | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PART |
Steven Webb
|
|
|
Energy report needed prior to final. 3/30/2001 10:57:21 AM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Steven Webb
|
|
|
###-#### Prior c/n corrections verified; engineering supplied. 3/30/2001 10:57:58 AM
|
BLD-Framing/Rough-in | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | PART |
Russ Owen
|
|
|
bearing for truss a-6, fire block stairs basement areas and drop ceiling in hall, letter from engineer for all changes on site,but required addnl work, this work needs to be verified by the engineer as being complete.c/n posted. ok to insulate. 3/28/2001 3:40:07 PM
|
BLD-Energy code compliance | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | CANC |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | NR |
Tony Young
|
|
|
###-####
|
BLD-Energy code compliance | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | NR |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | FAIL |
Tony Young
|
|
|
SHEAR\\###-####
c/n posted, need letter from eng. for compliance for shear due to changes (as built vs. plans) 3/20/2001 3:28:03 PM
|
BLD-Foundation | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 18:11:53. Contact: ###-####.
wip, ok w/ verbal corrections 3/6/2001 11:15:18 AM
|
BLD-Footing | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | PART |
Steven Webb
|
|
|
###-####: WIP--appears ok. 3/1/2001 9:08:40 AM
|
BLD-Footing | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | PART |
Tony Young
|
|
|
FT INSP ROBIN ###-####
already poured slab w/ ftgs 12/21/2000 11:07:48 AM
|
BLD-Foundation | 12/12/2000 | 12/12/2000 | 12/12/2000 | P | PASS |
Jim Storey
|
|
|
randy ###-#### found walls ok for rebar. 12/12/2000 4:45:51 PM
|
BLD-Foundation | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | PASS |
Steven Webb
|
|
|
###-####footing not foundation 12/4/2000 2:03:55 PM
|
BLD-Grading Inspection | 12/1/2000 | 12/1/2000 | 12/1/2000 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been inspected and approved by the geotechnical engineer.
|
Override - Parcel Holds | | | 12/1/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 12/1/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 11/17/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/17/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/15/2000 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/15/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/15/2000 | | DONE |
|
|
|
|
Telephone call | | | 11/15/2000 | | DONE |
|
|
|
left message
|
Plan assigned to (DJO) | 11/14/2000 | 11/14/2000 | 11/14/2000 | | PASS |
Dan Overy
|
|
|
11/14/2000 15:02:09 DJO - activity updated through activity BLDA022 from case BLD00-03236.
|
Case Summary (BLD) | | | 11/14/2000 | | DONE |
|
|
|
|
Plan Review Report | | | 11/14/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 11/14/2000 | | |
|
|
|
|
Routing - PLANNING | 11/7/2000 | 11/7/2000 | 11/8/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/30/2000 | 10/30/2000 | 11/7/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 10/30/2000 | 10/30/2000 | 11/6/2000 | | DONE |
Rita DeYoung
|
|
|
TOOK TO TERRY RECORDS 10/30/2000/PE
|
Plan Reviewer's activity | | | 11/1/2000 | | PEND |
|
|
|
wednesday, november 1. Ms Robin Labrie hand carried revision sheets and lateral engineering for hillside structure. This information has been inserted into plans and is still at public works.
|
Application received | | | 10/30/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 11/8/2000 | 11/8/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 10/30/2000 | | | | PEND |
Dan Overy
|
|
|
|