BLD-Final | 6/10/2002 | 6/11/2002 | 6/11/2002 | A | DONE |
Steven Webb
|
|
|
has an l/c needs to be doc finaled
|
DOC - Permit Finaled | 6/11/2002 | 6/11/2002 | 6/11/2002 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 6/11/2002 9:54:10 AM
|
BLD-Final | 5/29/2001 | 5/30/2001 | 5/30/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 21:41:28. Contact: ###-####. C. of C. #21429 5/30/2001 12:19:44 PM
|
BLD-Final | 5/28/2001 | 5/29/2001 | 5/29/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/28/2001 at 22:19:16. Contact: ###-####. c/n issued 5/30/2001 7:34:51 AM
|
BLD-Framing/Rough-in | 3/11/2001 | 3/12/2001 | 3/12/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/11/2001 at 21:25:55. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/7/2001 | 3/8/2001 | 3/8/2001 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 14:24:49. Contact: ###-####. comply with first correction notice and recall 3/8/2001 10:32:19 AM
|
BLD-Framing/Rough-in | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/08/2001 at 10:24:54. Contact: ###-####.C/n issued-additional nails needed on hangers at T-9 and T-38, Tji repair references a rim joist the damaged joist is not a rim, additional attention needed. 3/8/2001 2:16:28 PM
|
BLD-Framing/Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 20:59:14. Contact: ###-####. Already insulated prior to approval for insulation was given, c/n issued, to remove insulation where for items I need to inspect.. Charged $42.00 re-inspect fee and hold inspection until paid. 3/6/2001 2:54:35 PM
|
BLD-Framing/Rough-in | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 20:33:11. Contact: ###-####. C/n posted--Truss T9X repair per eng. required, BCI ceiling joist above kitchen damaged needs replaced, or manufactures repair, Nail hangers throughout, i.e. T9,32,38,11,7 etc. Engineering required on trusses with have been notched--T9, Topplate straps needed on 2 ply M. Lam between family and hall, rotation blocks needed on trusses T26-29. 3/2/2001 11:26:38 AM
|
BLD-Wall cover | 2/15/2001 | 2/16/2001 | 2/16/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 18:23:04. Contact: ###-####.Prior c/n items completed, eng. to be faxed to office regarding change in design at back. 2/16/2001 1:21:35 PM
|
BLD-Framing/Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | FAIL |
Steven Webb
|
|
|
shear wall Greg ###-####: SHEAR--c/n issued--post address, complete nailing per plans, complete installation of hd in back, provide engineering or retrofitting of hd at back of building where changed from plans. 2/14/2001 3:56:52 PM
|
Override - Parcel Holds | | | 2/14/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 2/13/2001 | | |
|
|
|
|
BLD-Foundation | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PASS |
Steven Webb
|
|
|
Clint ###-#### after beep 14236
|
Override - Parcel Holds | | | 12/21/2000 | | |
|
|
|
|
BLD-Footing | 12/18/2000 | 12/19/2000 | 12/19/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### after beep 14236 12/19/2000 9:50:35 AM
|
Override - Parcel Holds | | | 12/18/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 12/13/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/13/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/11/2000 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/11/2000 | | DONE |
|
|
|
|
Telephone call | | | 12/11/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 11/9/2000 | | 12/11/2000 | | PASS |
Steve Munroe
|
|
|
12/11/2000 10:29:03 SAM - activity updated through activity BLDA022 from case BLD00-03325.
|
Pending Assignment by DJO | 11/2/2000 | | 11/9/2000 | | DONE |
Dan Overy
|
|
|
11/9/2000 11:36:44 SAM - activity updated through activity BLDA183 from case BLD00-03325.
|
Routing - PUBLIC WORKS | 11/2/2000 | 11/2/2000 | 11/3/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 11/2/2000 | 11/2/2000 | 11/3/2000 | | PASS |
|
|
|
|
Application received | | | 11/2/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 11/3/2000 | 11/3/2000 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
11/13/00 15:57 Called and left a message for Scott, from Matrix, to call me. They said it will probable be tomorrow till he gets back with me. Called and talked to John Mortin, the engineer, about getting me a letter explaining shear transfer.
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
Only one set of plans are being approved due to excessive red-lining. 11/15/00 Plan review is done. Waiting for Jim Wyllie to release hold.
|
Case Summary (BLD) | | | | | |
|
|
|
|