Permit Information
Permit NumberBLD00-03325
StatusFinaled
Name COMAN COLLECTION INC
Site Address 3199 S MILLSPUR WAY
Project NameFLOOD PLAIN
Customer Number345-7973
ePlanReviewNo
Description
To construct a 4331 sq. ft. two story single family dwelling (2667 sq. ft. first floor/1664 sq. ft. second floor) with a attached 1118 sq. ft. three car garage/storage. Per approved plans, engineering and requirement list. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A ELEVATION CERTIFICATE IS REQUIRED BEFORE CALLING FOR A ROUGH FRAMING INSPECTION. JIM WYLLIE HAS RELEASED THE NON-BUILD IF CONSTRUCTED IN ACCORDANCE TO THE INFORMATION SUPPLIED BY QUADRANT. CUP98-0116 per Roger Jones. PC#962 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/10/20026/11/20026/11/2002ADONE
DetailsSteven Webb
has an l/c needs to be doc finaled
DOC - Permit Finaled6/11/20026/11/20026/11/2002APASS
DetailsSteven Webb
Finaled by inspector at 6/11/2002 9:54:10 AM
BLD-Final5/29/20015/30/20015/30/2001PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/29/2001 at 21:41:28. Contact: ###-####. C. of C. #21429 5/30/2001 12:19:44 PM
BLD-Final5/28/20015/29/20015/29/2001AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 05/28/2001 at 22:19:16. Contact: ###-####. c/n issued 5/30/2001 7:34:51 AM
BLD-Framing/Rough-in3/11/20013/12/20013/12/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/11/2001 at 21:25:55. Contact: ###-####.
BLD-Framing/Rough-in3/7/20013/8/20013/8/2001AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/07/2001 at 14:24:49. Contact: ###-####. comply with first correction notice and recall 3/8/2001 10:32:19 AM
BLD-Framing/Rough-in3/8/20013/8/20013/8/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/08/2001 at 10:24:54. Contact: ###-####.C/n issued-additional nails needed on hangers at T-9 and T-38, Tji repair references a rim joist the damaged joist is not a rim, additional attention needed. 3/8/2001 2:16:28 PM
BLD-Framing/Rough-in3/5/20013/6/20013/6/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/05/2001 at 20:59:14. Contact: ###-####. Already insulated prior to approval for insulation was given, c/n issued, to remove insulation where for items I need to inspect.. Charged $42.00 re-inspect fee and hold inspection until paid. 3/6/2001 2:54:35 PM
BLD-Framing/Rough-in3/1/20013/2/20013/2/2001AFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/01/2001 at 20:33:11. Contact: ###-####. C/n posted--Truss T9X repair per eng. required, BCI ceiling joist above kitchen damaged needs replaced, or manufactures repair, Nail hangers throughout, i.e. T9,32,38,11,7 etc. Engineering required on trusses with have been notched--T9, Topplate straps needed on 2 ply M. Lam between family and hall, rotation blocks needed on trusses T26-29. 3/2/2001 11:26:38 AM
BLD-Wall cover2/15/20012/16/20012/16/2001PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 02/15/2001 at 18:23:04. Contact: ###-####.Prior c/n items completed, eng. to be faxed to office regarding change in design at back. 2/16/2001 1:21:35 PM
BLD-Framing/Rough-in2/14/20012/14/20012/14/2001PFAIL
DetailsSteven Webb
shear wall Greg ###-####: SHEAR--c/n issued--post address, complete nailing per plans, complete installation of hd in back, provide engineering or retrofitting of hd at back of building where changed from plans. 2/14/2001 3:56:52 PM
Override - Parcel Holds  2/14/2001  
Override - Parcel Holds  2/13/2001  
BLD-Foundation12/21/200012/21/200012/21/2000PPASS
DetailsSteven Webb
Clint ###-#### after beep 14236
Override - Parcel Holds  12/21/2000  
BLD-Footing12/18/200012/19/200012/19/2000APART
DetailsTom Arcoraci
###-#### after beep 14236 12/19/2000 9:50:35 AM
Override - Parcel Holds  12/18/2000  
Override - Parcel Holds  12/13/2000  
Issue PAID IN FULL permit  12/13/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/11/2000 DONE
Override - Parcel Holds  12/11/2000  
Inspection Record Card- Bld  12/11/2000 DONE
Telephone call  12/11/2000 DONE
Plan assigned to (SAM)11/9/2000 12/11/2000 PASS
DetailsSteve Munroe
12/11/2000 10:29:03 SAM - activity updated through activity BLDA022 from case BLD00-03325.
Pending Assignment by DJO11/2/2000 11/9/2000 DONE
DetailsDan Overy
11/9/2000 11:36:44 SAM - activity updated through activity BLDA183 from case BLD00-03325.
Routing - PUBLIC WORKS11/2/200011/2/200011/3/2000 PASS
Routing - PLANNING11/2/200011/2/200011/3/2000 PASS
Application received  11/2/2000  
Routing - PLAN CHECK11/3/200011/3/2000  PEND
Plan Reviewer's activity    PEND
11/13/00 15:57 Called and left a message for Scott, from Matrix, to call me. They said it will probable be tomorrow till he gets back with me. Called and talked to John Mortin, the engineer, about getting me a letter explaining shear transfer.
Case Summary (BLD)     
Plan Review Report     
Plan Reviewer's activity    PEND
Only one set of plans are being approved due to excessive red-lining. 11/15/00 Plan review is done. Waiting for Jim Wyllie to release hold.
Case Summary (BLD)