Fee Review-notes | 11/3/2000 | 11/3/2000 | 5/24/2001 | | DONE |
|
|
|
|
Letter of compliance | | | 2/7/2001 | | DONE |
|
|
|
Letter of Compliance #21339 issued 2-7-01.
|
BLD-Final | 2/5/2001 | 2/6/2001 | 2/6/2001 | A | PASS |
Carl Dependahl
|
|
|
don 371- 6875 fn occ 1hr const ok at stair "enclosure", extends corridor to s.c rated door at bottom of stairs 2/6/2001 10:58:22 AM per arch's letter deleting door at top. stair narrower than plans due to existing struct. conditions, but exceeds 36" ok per UBC 1003 for occupant load 2/6/2001 11:00:23 AM
|
FIRE-Final Inspection | 1/25/2001 | 1/26/2001 | 1/26/2001 | A | PASS |
Rick Jackson
|
|
|
Don ###-####
|
BLD-Final | 1/26/2001 | 1/26/2001 | 1/26/2001 | P | FAIL |
Carl Dependahl
|
|
|
don ###-#### fn occ, c/n, rails. ok for t/o 1/26/2001 3:58:46 PM
|
FIRE-Final Inspection | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### sprinkler monitoring; exit signs; door hardware 1/24/2001 3:51:39 PM
|
BLD-Framing/Rough-in | 1/22/2001 | 1/23/2001 | 1/23/2001 | A | PART |
Carl Dependahl
|
|
|
###-####; stairs ok, add door/handrails as req'd 1/23/2001 10:12:34 AM
|
BLD-Framing/Rough-in | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Carl Dependahl
|
|
|
###-####, stair and shear wall ok 1/10/2001 3:43:00 PM
|
BLD-Conference | 1/9/2001 | 1/9/2001 | 1/9/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/9/2001 11:35:21 AM w/ arch re stair eng'g & resubmittal...ok to use super-tread
|
BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Carl Dependahl
|
|
|
FR DON- ###-#### shear wall along stairs ok, add fasteners at exist joists; need clarify florr frame support at adjacent space under bld 00-02654 1/8/2001 4:15:20 PM
|
BLD-Framing/Rough-in | 12/28/2000 | 1/2/2001 | 1/2/2001 | A | FAIL |
Jim Storey
|
|
|
LARRY-- ###-#### not built per approved plan need to resubmit for changes or have arch. address ele panel in rated corridor wall not drawn on aproved plan. 1/2/2001 10:45:10 AM
|
BLD-Framing/Rough-in | 12/28/2000 | 12/28/2000 | 12/28/2000 | P | CANC |
Jim Storey
|
|
|
###-####-- CANCEL PER LARRY CANTRELL
|
Issue PAID IN FULL permit | | | 12/28/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/27/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/27/2000 | | DONE |
|
|
|
|
Telephone call | | | 12/27/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/26/2000 | | |
|
|
|
Received a response from the architect about the new floor opening. He included an opinion from a structural engineer.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/26/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/27/2000 | | 12/26/2000 | | PASS |
|
|
|
Drawings approved after the 2nd response from the architect.
|
Plan assigned to (CJW) | 11/7/2000 | | 12/26/2000 | | PASS |
Carl Westfall
|
|
|
12/26/00 13:35:53 CJW - activity updated through activity BLDA022 from case BLD00-03335.
|
Plan Reviewer's activity | | | 12/4/2000 | | |
|
|
|
Failed 2nd review. Item #24 regarding changes to the floor diaphragm was not resolved. Sent the architect a compy of Item #24 asking for resolution.
|
Plan resubmittals received | | | 11/30/2000 | | DONE |
|
|
|
Received two copies of revised sheet A-1 and two copies of structural calcs. Routed to Carl W. KMM
|
Routing - FIRE | 11/22/2000 | 11/27/2000 | 11/27/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 11/27/2000 | | |
|
|
|
Failed first UBC plan review.
|
Routing - PLAN CHECK | 11/7/2000 | | 11/22/2000 | | |
|
|
|
Failed first UBC plan review.
|
Plan Reviewer's activity | | | 11/17/2000 | | |
|
|
|
UBC plan review started November 17, 2000 and finished November 22, 2000. A response is required from the architect/engineer. See the conditions list.
|
Pending Assignment by MYS | 11/7/2000 | | 11/7/2000 | | DONE |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/6/2000 | | DONE |
|
|
|
|
Application received | | | 11/3/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|