Case Summary (BLD) | | | 1/27/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/27/2010 | | |
|
|
|
|
Fee Review-notes | 3/2/2001 | 3/2/2001 | 1/18/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/14/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8957 issued 12-14-01 to the Head Start Classroom.
|
Permanent Occupancy | | 12/3/2001 | 12/3/2001 | | DONE |
|
|
|
|
BLD-Final | 12/3/2001 | 12/3/2001 | 12/3/2001 | P | PASS |
Jim Storey
|
|
|
Darrell ###-#### final ok 12/4/2001 2:16:12 PM
|
BLD-Conference | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/30/2001 2:35:23 PM w/ Darrel...will call for final.
|
BLD-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/28/2001 | | NR |
Carl Dependahl
|
|
|
comm'l day care, called contractor. 11/30/2001 2:42:41 PM
|
BLD-Aging Inspection | 9/24/2001 | 9/24/2001 | 9/24/2001 | | NR |
Carl Dependahl
|
|
|
called, left msg w/ bldr 9/24/2001 10:51:13 AM
|
BLD-Aging Inspection | 7/23/2001 | 7/23/2001 | 7/23/2001 | | PART |
Carl Dependahl
|
|
|
wip...keep c/n 7/30/2001 9:39:26 AM
|
BLD-Aging Inspection | 5/23/2001 | 5/23/2001 | 5/23/2001 | | PASS |
Carl Dependahl
|
|
|
wip, left msg w/ bldr, has t/o 5/24/2001 12:12:16 PM
|
BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/23/2001 9:57:28 AM w/ supt: complete c/n, add trim at ext as req'd for weatherproof ext, smooth landing at rear door, etc.
|
BLD-Final | 3/21/2001 | 3/22/2001 | 3/22/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####; see prev. c/n; float rear landing for max 1/2" threshold, infill demising wall, etc. ok for t/o 3/22/2001 11:11:15 AM
|
BLD-Conference | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/22/2001 2:32:08 PM w/ cont re c/n
|
BLD-Conference | 3/21/2001 | 3/21/2001 | 3/21/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/21/2001 3:52:25 PM w/ bldr re c/n; recall for insp.
|
BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | FAIL |
Carl Dependahl
|
|
|
fn dwayne-- ###-####; keep c/n...grid install, firestop & seal occ. wall...need other sig's 3/16/2001 9:43:10 AM
|
BLD-Final | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####; keep c/n; show ID for glass at 1hr door (occ. sep at rear portion.) Ok for t/o. 3/16/2001 2:56:35 PM
|
FIRE-Final Inspection | 3/16/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/16/2001 10:37:44 AM
|
BLD-Conference | 3/13/2001 | 3/13/2001 | 3/13/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/13/2001 6:24:36 PM w/ titan re c/n
|
BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | FAIL |
Carl Dependahl
|
|
|
drop ceiling grid Duane ###-#### c/n grid, seal firestop occ. sep wall 3/9/2001 11:01:45 AM
|
BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | FAIL |
Carl Dependahl
|
|
|
drop ceiling grid Duane ###-#### c/n grid, seal firestop occ. sep wall 3/9/2001 11:01:45 AM
|
BLD-Framing/Rough-in | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | PART |
Carl Dependahl
|
|
|
grid ceiling---dwayne-- ###-#### ok to tile, show specs at final 3/9/2001 4:56:19 PM
|
BLD-Framing/Rough-in | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | PART |
Carl Dependahl
|
|
|
###-####; ok to cover walls; has to provide occ. separation adjacent to kitchen ..tight to roof deck at existing. 2/14/2001 3:09:40 PM 2/14/2001 3:12:19 PM
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | FAIL |
Carl Dependahl
|
|
|
fr insp darrell ###-#### c/n, fireblocks, headers; need clarify: demising or occ. separation wall?? Need landings at doors. 2/13/2001 10:52:31 AM
|
BLD-Conference | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/13/2001 12:07:50 PM w/ bldr re c/n issued, will consult arch/plan review
|
Issue & PRINT to be Invoiced | | | 1/25/2001 | | DONE |
|
|
|
paid by JV
|
Plan assigned to (MLO) | 11/6/2000 | | 12/13/2000 | | PASS |
Mike Otto
|
|
|
12/13/2000 08:47:12 MLO - activity updated through activity BLDA022 from case BLD00-03337.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/13/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/13/2000 | | DONE |
|
|
|
|
Telephone call | | | 12/13/2000 | | DONE |
|
|
|
called permit ready
|
Plan Reviewer's activity | | | 12/12/2000 | | DONE |
|
|
|
WENT OVER PLAN WITH S. SIMMONS, CDH ON PHONE GOT VERBAL APPROVAL. INSPECTION REQUIRED PRIOR TO C OF O. CDH FAXED CONDITIONS WHICH ARE ATTACHED TO PLANS. MLO
|
Routing - PLUMBING | 12/5/2000 | | 12/8/2000 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 12/8/2000 | | PEND |
|
|
|
PLAN NOT APPROVED BY CDH PRIOR TO SUBMITTING. WILL CONTACT CDH. MLO
|
Plan resubmittals received | | | 12/5/2000 | | DONE |
|
|
|
Received Plan Resubmittals from Doug Cooper.Two sets of sheetsA1,A2, and P1, forwarded same to Mike Otto. 12/5/00
|
Routing - PLAN CHECK | 12/5/2000 | | 12/5/2000 | | PASS |
|
|
|
future bay window not included in this approval.
|
Routing - FIRE | 11/20/2000 | 11/20/2000 | 11/20/2000 | | PASS |
Bill Alexander
|
|
|
W/CONDITIONS
|
Plan Review Completed(1st rev) | | | 11/20/2000 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/15/2000 | | 11/17/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED TO ARCHITECT
|
Plan resubmittals requested | | | 11/17/2000 | | FAIL |
|
|
|
UBC CORRECTIONS
|
Routing - PLUMBING | 11/6/2000 | | 11/15/2000 | | FAIL |
|
|
|
provide plumbing plans showing waste, vent and water size and location, if the toilets in the childrens restroom are for kids 6 and under they must be sized per section 409.1 , 1997 upc
|
Plans ACCEPTED BY PLAN TECH | | | 11/6/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 11/6/2000 | | 11/6/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 11/6/2000 | | 11/6/2000 | | PASS |
|
|
|
Plans approved per File #: CAA00-00230.
|
Application received | | | 11/6/2000 | | |
|
|
|
|