| Fee Review-notes | 11/6/2000 | 11/6/2000 | 6/27/2001 | | DONE |
|
|
|
|
| Permanent occupancy | | | 6/27/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8732 issued 6-27-01 to Champs, Inc.
|
| Permanent Occupancy | | 6/22/2001 | 6/22/2001 | | DONE |
|
|
|
|
| BLD-Final | 6/22/2001 | 6/22/2001 | 6/22/2001 | P | PASS |
Tom Arcoraci
|
|
|
Rich Graham ###-####
|
| Temporary occupancy | | | 5/30/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4550 issued 5-30-01 to Champs, Inc.
|
| BLD-Final | 5/25/2001 | 5/29/2001 | 5/29/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 10:27:14. Contact: ###-####. C/N Need Plumb and Electr signatures for Perm Occ, Letter of appr from Eng for holes cut thru existing concrete roof beams, Obtain Perm Occ status within 90 days of this notice. 5/29/2001 5:17:58 PM
|
| FIRE-Final Inspection | 5/25/2001 | 5/25/2001 | 5/25/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 10:25:18. Contact: ###-####.
|
| FIRE-Alarm Testing | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | FAIL |
Joe Tawney
|
|
|
###-####. 5/2/2001 11:05:38 AM Reinsp Fail AHU duct detector 5/2/2001 11:06:06 AM
|
| BLD-Final | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 12:22:14. Contact: ###-####.need ceiling support system in embrodiary room reveiwed by 12/2/2001 11:06:48 AMarchitect of record also rest room signage and fire life safety. 12/2/2001 11:06:54 AM 12/2/2001 11:07:10 AM 12/2/2001 11:13:59 AM
|
| FIRE-Final Inspection | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | NR |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 04/20/2001 at 14:49:07. Contact: ###-####. REinsp not ready 4/23/2001 12:11:15 PM
|
| BLD-Final | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/20/2001 at 14:50:49. Contact: ###-####. no fire sign off 4/23/2001 10:56:26 AM
|
| FIRE-Final Inspection | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | FAIL |
Joe Tawney
|
|
|
rich ###-#### Reinsp Fail AHU duct det and exit/Emerg light 4/19/2001 11:31:04 AM
|
| FIRE-Alarm Testing | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 4/12/2001 5:27:18 PM
|
| BLD-Other | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | FAIL |
Russ Owen
|
|
|
Added by Inspector: 407 On 4/11/2001 1:38:00 PM talked with owner on site, went over job card and requirements for obtaining a c/o , issued a c/n stating a certificate of occupancy has not been issued for the space, and posted red sticker( violation of Boise City Code #4-2-10:).
|
| BLD-Final | 3/19/2001 | 3/20/2001 | 3/20/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 09:50:55. Contact: ###-####.called contact no. told him they need all required signatures on card before calling for a final. 3/20/2001 11:09:16 AM
|
| BLD-Framing/Rough-in | 1/16/2001 | 1/17/2001 | 1/17/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 17:05:34. Contact: ###-####.c/n plumbing insp. brace wall rear screen work area. 1/17/2001 11:21:49 AM
|
| BLD-Framing/Rough-in | 1/16/2001 | 1/16/2001 | 1/16/2001 | P | CANC |
Tom Arcoraci
|
|
|
please call ###-#### no time left 1/16/2001 5:27:50 PM
|
| Issue PAID IN FULL permit | | | 12/21/2000 | | DONE |
|
|
|
|
| Routing - FIRE | 12/20/2000 | 12/20/2000 | 12/20/2000 | | PASS |
Bill Alexander
|
|
|
|
| Routing - PLAN CHECK | 12/20/2000 | 12/20/2000 | 12/20/2000 | | PASS |
|
|
|
Plans approved by fire analyst. Prepared for routing to permit desk for issuance.
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2000 | | PASS |
|
|
|
Routed to permit desk for issuance.
|
| Inspection Record Card- Bld | | | 12/20/2000 | | DONE |
|
|
|
|
| Inspection Record Card- Bld | | | 12/20/2000 | | DONE |
|
|
|
|
| Print Occupancy Form | | | 12/20/2000 | | DONE |
|
|
|
|
| Telephone call | | | 12/20/2000 | | DONE |
|
|
|
TALKED TO RANDY HEMMER TO VERIFY THAT PERMIT IS READY
|
| Plan assigned to (DRS) | 11/8/2000 | | 12/20/2000 | | PASS |
Dan Stuart
|
|
|
12/20/2000 15:09:57 DRS - activity updated through activity BLDA022 from case BLD00-03351.
|
| Routing - PLAN CHECK | 12/18/2000 | | 12/19/2000 | | PEND |
|
|
|
Pat Ellis took resubmittals to to dan s. 12/19/00 - Reusbmittals into plans & routed back to fire code analyst for review.
|
| Plan resubmittals received | | | 12/19/2000 | | DONE |
|
|
|
Received one copy of cover letter, one copy of United water flow data sheet, two revised sheet SP-1. Routed to Dan Stuart. KMM
|
| Routing - FIRE | 12/12/2000 | 12/18/2000 | 12/18/2000 | | FAIL |
Bill Alexander
|
|
|
Lack hydrant location and hydant flow verification.
|
| Plan Review Completed(1st rev) | | | 12/18/2000 | | FAIL |
|
|
|
|
| Plan resubmittals received | | | 12/13/2000 | | DONE |
|
|
|
Received three copies of revised sheets 0, A-1, A-2, one copy of response letter. Routed to Dan Stuart. KMM
|
| Plan resubmittals requested | | | 12/12/2000 | | |
|
|
|
need additional restroom for this tenant. Architect to provide location and design layout for accessiblity compliance.
|
| Telephone call | | | 12/11/2000 | | DONE |
|
|
|
Call to Cornel Larson concerning number of employees of Champs. He is not sure suggested I call Rich Graham, tenant. I also wanted to verify if their is any vehicle parking within the rear warehouse area.
|
| Telephone call | | | 12/11/2000 | | DONE |
|
|
|
Call to Rich Graham at Champs. Rich not immediately available. Talked with Jerry. Jerry will fax me copies of hazardous data sheets for chemicals uded in the screen printing process, says they have changed chemicals since the 1997 remodel of the current space on Franklin. Jerry also told me they had more than four employees. I informed him that this would require two restrooms, one for each sex per chapter 29 UBC. Jerry also told me that there is no vehicle parking in the interior. Jerry was to contact Mr. Graham and have him call me concerning who is responsible for additional restroom.
|
| Telephone call | | | 12/11/2000 | | DONE |
|
|
|
Call from Mr. Graham. Randy Hemmer is contact for additional restroom requirement.
|
| Telephone call | | | 12/11/2000 | | DONE |
|
|
|
Called Randy Hemmer to give him a heads up on need for second rrestroom based on tenant number of employees. I will follow this up with a written plan review comment report being mailed and faxed to the architect for response.
|
| Routing - PLAN CHECK | 11/9/2000 | | 12/11/2000 | | FAIL |
|
|
|
put in dan s bin. PE 12/11/00 - Reviewed plans. Need additioanl restroom for tenant. Called Architect, Tenant & building owner to notify. Sent copy of plan review report to architect for response.
|
| Routing - PUBLIC WORKS | 11/8/2000 | | 11/9/2000 | | PASS |
|
|
|
|
| Pending Assignment by MYS | 11/8/2000 | | 11/8/2000 | | DONE |
Marlene Southard
|
|
|
|
| Plans ACCEPTED BY PLAN TECH | | | 11/7/2000 | | DONE |
|
|
|
|
| Received Certificate of Value | | | 11/6/2000 | | DONE |
|
|
|
|
| Application received | | | 11/6/2000 | | |
|
|
|
|
| Recd Pcfee & Taken To Pln CK | | | 11/6/2000 | | DONE |
|
|
|
|