Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD00-03351
StatusFinaled
Name HEMMER INVESTMENTS L L C
Site Address 5880 W FRANKLIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
*CHAMPS, INC./ RICH GRAHAM* To remodel 5,862 sq.ft. of space at the west end of an existing building for a detail and screen print production tenant per approved plans on file. A "VANILLA FINISH" permit, BLD00-03152, was issued 11/29/00 for construction of tenant separation wall, new storefront entry & accessible restroom. THE SCOPE OF THIS PERMIT WILL COVER CONSTRUCTION OF INTERIOR, NON-BEARING WALLS W/ FIRE-CODE SHEETROCK COVER TO CREATE THREE OFFICES; A DISPLAY/SALES AREA, SCREEN PRINT PRODUCTIONS AREA, SUPPORT AREAS AND TWO FULLY; AND A SECOND ACCESSIBLE RESTROOM. A CERTIFICATE OF OCCUPANCY IS REQUIRED FOR THIS NEW TENANT BEFORE OCCUPANCY. (P.C.#952-00)drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes11/6/200011/6/20006/27/2001 DONE
Permanent occupancy  6/27/2001 DONE
Perm. Occ. Cert. #8732 issued 6-27-01 to Champs, Inc.
Permanent Occupancy 6/22/20016/22/2001 DONE
Details
BLD-Final6/22/20016/22/20016/22/2001PPASS
DetailsTom Arcoraci
Rich Graham ###-####
Temporary occupancy  5/30/2001 PART
Temp. Occ. Cert. #4550 issued 5-30-01 to Champs, Inc.
BLD-Final5/25/20015/29/20015/29/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/25/2001 at 10:27:14. Contact: ###-####. C/N Need Plumb and Electr signatures for Perm Occ, Letter of appr from Eng for holes cut thru existing concrete roof beams, Obtain Perm Occ status within 90 days of this notice. 5/29/2001 5:17:58 PM
FIRE-Final Inspection5/25/20015/25/20015/25/2001PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/25/2001 at 10:25:18. Contact: ###-####.
FIRE-Alarm Testing5/1/20015/2/20015/2/2001AFAIL
DetailsJoe Tawney
###-####. 5/2/2001 11:05:38 AM Reinsp Fail AHU duct detector 5/2/2001 11:06:06 AM
BLD-Final5/1/20015/2/20015/2/2001AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/01/2001 at 12:22:14. Contact: ###-####.need ceiling support system in embrodiary room reveiwed by 12/2/2001 11:06:48 AMarchitect of record also rest room signage and fire life safety. 12/2/2001 11:06:54 AM 12/2/2001 11:07:10 AM 12/2/2001 11:13:59 AM
FIRE-Final Inspection4/20/20014/23/20014/23/2001ANR
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 04/20/2001 at 14:49:07. Contact: ###-####. REinsp not ready 4/23/2001 12:11:15 PM
BLD-Final4/20/20014/23/20014/23/2001ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/20/2001 at 14:50:49. Contact: ###-####. no fire sign off 4/23/2001 10:56:26 AM
FIRE-Final Inspection4/18/20014/19/20014/19/2001AFAIL
DetailsJoe Tawney
rich ###-#### Reinsp Fail AHU duct det and exit/Emerg light 4/19/2001 11:31:04 AM
FIRE-Alarm Testing4/11/20014/12/20014/12/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued 4/12/2001 5:27:18 PM
BLD-Other4/11/20014/11/20014/11/2001PFAIL
DetailsRuss Owen
Added by Inspector: 407 On 4/11/2001 1:38:00 PM talked with owner on site, went over job card and requirements for obtaining a c/o , issued a c/n stating a certificate of occupancy has not been issued for the space, and posted red sticker( violation of Boise City Code #4-2-10:).
BLD-Final3/19/20013/20/20013/20/2001ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/19/2001 at 09:50:55. Contact: ###-####.called contact no. told him they need all required signatures on card before calling for a final. 3/20/2001 11:09:16 AM
BLD-Framing/Rough-in1/16/20011/17/20011/17/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/16/2001 at 17:05:34. Contact: ###-####.c/n plumbing insp. brace wall rear screen work area. 1/17/2001 11:21:49 AM
BLD-Framing/Rough-in1/16/20011/16/20011/16/2001PCANC
DetailsTom Arcoraci
please call ###-#### no time left 1/16/2001 5:27:50 PM
Issue PAID IN FULL permit  12/21/2000 DONE
Routing - FIRE12/20/200012/20/200012/20/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK12/20/200012/20/200012/20/2000 PASS
Plans approved by fire analyst. Prepared for routing to permit desk for issuance.
PLANS/APPL TAKEN TO FRONT DESK  12/20/2000 PASS
Routed to permit desk for issuance.
Inspection Record Card- Bld  12/20/2000 DONE
Inspection Record Card- Bld  12/20/2000 DONE
Print Occupancy Form  12/20/2000 DONE
Telephone call  12/20/2000 DONE
TALKED TO RANDY HEMMER TO VERIFY THAT PERMIT IS READY
Plan assigned to (DRS)11/8/2000 12/20/2000 PASS
DetailsDan Stuart
12/20/2000 15:09:57 DRS - activity updated through activity BLDA022 from case BLD00-03351.
Routing - PLAN CHECK12/18/2000 12/19/2000 PEND
Pat Ellis took resubmittals to to dan s. 12/19/00 - Reusbmittals into plans & routed back to fire code analyst for review.
Plan resubmittals received  12/19/2000 DONE
Received one copy of cover letter, one copy of United water flow data sheet, two revised sheet SP-1. Routed to Dan Stuart. KMM
Routing - FIRE12/12/200012/18/200012/18/2000 FAIL
DetailsBill Alexander
Lack hydrant location and hydant flow verification.
Plan Review Completed(1st rev)  12/18/2000 FAIL
Plan resubmittals received  12/13/2000 DONE
Received three copies of revised sheets 0, A-1, A-2, one copy of response letter. Routed to Dan Stuart. KMM
Plan resubmittals requested  12/12/2000  
need additional restroom for this tenant. Architect to provide location and design layout for accessiblity compliance.
Telephone call  12/11/2000 DONE
Call to Cornel Larson concerning number of employees of Champs. He is not sure suggested I call Rich Graham, tenant. I also wanted to verify if their is any vehicle parking within the rear warehouse area.
Telephone call  12/11/2000 DONE
Call to Rich Graham at Champs. Rich not immediately available. Talked with Jerry. Jerry will fax me copies of hazardous data sheets for chemicals uded in the screen printing process, says they have changed chemicals since the 1997 remodel of the current space on Franklin. Jerry also told me they had more than four employees. I informed him that this would require two restrooms, one for each sex per chapter 29 UBC. Jerry also told me that there is no vehicle parking in the interior. Jerry was to contact Mr. Graham and have him call me concerning who is responsible for additional restroom.
Telephone call  12/11/2000 DONE
Call from Mr. Graham. Randy Hemmer is contact for additional restroom requirement.
Telephone call  12/11/2000 DONE
Called Randy Hemmer to give him a heads up on need for second rrestroom based on tenant number of employees. I will follow this up with a written plan review comment report being mailed and faxed to the architect for response.
Routing - PLAN CHECK11/9/2000 12/11/2000 FAIL
put in dan s bin. PE 12/11/00 - Reviewed plans. Need additioanl restroom for tenant. Called Architect, Tenant & building owner to notify. Sent copy of plan review report to architect for response.
Routing - PUBLIC WORKS11/8/2000 11/9/2000 PASS
Pending Assignment by MYS11/8/2000 11/8/2000 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  11/7/2000 DONE
Received Certificate of Value  11/6/2000 DONE
Application received  11/6/2000  
Recd Pcfee & Taken To Pln CK  11/6/2000 DONE