BLD-Final | 10/31/2001 | 11/1/2001 | 11/1/2001 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Grading Inspection | 11/1/2001 | 11/1/2001 | 11/1/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading has been approved by the engineer and public works.
|
DOC - Permit Finaled | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 11/1/2001 12:11:19 PM
|
BLD-Framing/Rough-in | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PASS |
Steven Webb
|
|
|
Phil ###-#### INTERIOR SHEAR--OK 6/12/2001 12:39:35 PM
|
BLD-Framing/Rough-in | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Energy code compliance | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/25/2001 | 5/29/2001 | 5/29/2001 | P | PART |
Tony Young
|
|
|
###-####
c/n posted , ok to insulate 5/29/2001 4:02:07 PM
|
BLD-Framing/Rough-in | 5/10/2001 | 5/11/2001 | 5/11/2001 | A | PART |
Tony Young
|
|
|
shear wall phil ###-####
exterior shear only ok 5/11/2001 11:15:43 AM
|
BLD-Framing/Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | FAIL |
Tony Young
|
|
|
shear wall Phil ###-####
no plans, not nailed off properly 5/9/2001 10:04:52 AM
|
BLD-Foundation | 1/16/2001 | 1/16/2001 | 1/16/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### Donny no hds in place 1/16/2001 2:17:17 PM
|
Override - Parcel Holds | | | 1/16/2001 | | |
|
|
|
|
BLD-Grading Inspection | 1/8/2001 | 1/8/2001 | 1/8/2001 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by geotechnical engineer and footing inspection can be done.
|
BLD-Footing | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Tony Young
|
|
|
###-####
wip on portion of ftg, ok per plan, will call in for insp. on rest of footing later 1/8/2001 12:16:16 PM
|
Override - Parcel Holds | | | 1/8/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 1/8/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 12/28/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/28/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/21/2000 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2000 | | DONE |
|
|
|
|
Telephone call | | | 12/21/2000 | | DONE |
|
|
|
called permit ready
|
Override - Parcel Holds | | | 12/20/2000 | | |
|
|
|
|
Plan assigned to (SAM) | 11/30/2000 | | 12/20/2000 | | PASS |
Steve Munroe
|
|
|
12/20/2000 14:09:12 SAM - activity updated through activity BLDA022 from case BLD00-03409.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2000 | | DONE |
|
|
|
|
Pending Assignment by DJO | 11/13/2000 | | 12/5/2000 | | DONE |
Dan Overy
|
|
|
12/5/2000 09:33:59 SAM - activity updated through activity BLDA183 from case BLD00-03409.
|
Routing - PLANNING | 11/22/2000 | 11/22/2000 | 11/22/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/13/2000 | 11/13/2000 | 11/22/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/13/2000 | 11/13/2000 | 11/22/2000 | | DONE |
Rita DeYoung
|
|
|
approved as category 3
|
Application received | | | 11/13/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 11/22/2000 | 11/22/2000 | | | PEND |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/1/00 Called and talked to Jerry Teal about questions I have on the plans. He said he will get me two new sheets and some new calculations with a stamp. I called and left a message for Tim Johnson with Briggs to call me regarding this plan.
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/5/00 Tried to get a hold of the engineer again. I left him another message. I then called the builder and informed them that I am waiting for new drawing sheets from the architect and that I have not gotten a hold of the engineer.
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/7/00 Talked to Tim Johnson, the engineer, and discussed the areas I had questions on. He answered them, but there is some areas I need to get in contact with the architect on. Still waiting for plans from the architect that he said he would get to me last time I talked to him.
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/18/00 I recieved new sheets for the architect. I need the new foundation plan stamped by the engineer.
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
12/19/00 4:00 Called Jerry Teal, architect, and left a message for him to call me. I then called the builder and informed them that I left a message for the architect and what items I need from him. They said that they will also follow up with the architect.
|