Permit Information
Permit NumberBLD00-03409
StatusFinaled
Name HARRIS CONSTRUCTION
Site Address 160 N AL FRESCO PL
Project NameHILLSIDE
Customer Number 
ePlanReviewNo
Description
To construct a 5688 sq. ft. two story single family dwelling (3804 sq. ft. first floor/1884 sq. ft. second floor) with a attached 1406 sq. ft. three car garage and 272 sq. ft. of covered porch. Per approved plans, engineering/red-lining and requirement list. This lot is within a hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be required. PC#1015 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/200111/1/200111/1/2001APASS
DetailsTony Young
###-####
BLD-Grading Inspection11/1/200111/1/200111/1/2001 PASS
DetailsRita DeYoung
Final grading has been approved by the engineer and public works.
DOC - Permit Finaled11/1/200111/1/200111/1/2001PPASS
DetailsTony Young
Finaled by inspector at 11/1/2001 12:11:19 PM
BLD-Framing/Rough-in6/12/20016/12/20016/12/2001PPASS
DetailsSteven Webb
Phil ###-#### INTERIOR SHEAR--OK 6/12/2001 12:39:35 PM
BLD-Framing/Rough-in5/31/20016/1/20016/1/2001APASS
DetailsTony Young
###-####
BLD-Energy code compliance5/31/20016/1/20016/1/2001APASS
DetailsTony Young
###-####
BLD-Framing/Rough-in5/25/20015/29/20015/29/2001PPART
DetailsTony Young
###-####
c/n posted , ok to insulate 5/29/2001 4:02:07 PM
BLD-Framing/Rough-in5/10/20015/11/20015/11/2001APART
DetailsTony Young
shear wall phil ###-####
exterior shear only ok 5/11/2001 11:15:43 AM
BLD-Framing/Rough-in5/8/20015/9/20015/9/2001AFAIL
DetailsTony Young
shear wall Phil ###-####
no plans, not nailed off properly 5/9/2001 10:04:52 AM
BLD-Foundation1/16/20011/16/20011/16/2001PPART
DetailsTom Arcoraci
###-#### Donny no hds in place 1/16/2001 2:17:17 PM
Override - Parcel Holds  1/16/2001  
BLD-Grading Inspection1/8/20011/8/20011/8/2001 PASS
DetailsRita DeYoung
Footing subgrade has been approved by geotechnical engineer and footing inspection can be done.
BLD-Footing1/8/20011/8/20011/8/2001PPART
DetailsTony Young
###-####
wip on portion of ftg, ok per plan, will call in for insp. on rest of footing later 1/8/2001 12:16:16 PM
Override - Parcel Holds  1/8/2001  
Override - Parcel Holds  1/8/2001  
Override - Parcel Holds  12/28/2000  
Issue PAID IN FULL permit  12/28/2000 DONE
Override - Parcel Holds  12/21/2000  
Inspection Record Card- Bld  12/21/2000 DONE
Telephone call  12/21/2000 DONE
called permit ready
Override - Parcel Holds  12/20/2000  
Plan assigned to (SAM)11/30/2000 12/20/2000 PASS
DetailsSteve Munroe
12/20/2000 14:09:12 SAM - activity updated through activity BLDA022 from case BLD00-03409.
PLANS/APPL TAKEN TO FRONT DESK  12/20/2000 DONE
Pending Assignment by DJO11/13/2000 12/5/2000 DONE
DetailsDan Overy
12/5/2000 09:33:59 SAM - activity updated through activity BLDA183 from case BLD00-03409.
Routing - PLANNING11/22/200011/22/200011/22/2000 PASS
Routing - PUBLIC WORKS11/13/200011/13/200011/22/2000 PASS
Routing - PUBLIC WORKS GRADING11/13/200011/13/200011/22/2000 DONE
DetailsRita DeYoung
approved as category 3
Application received  11/13/2000  
Routing - PLAN CHECK11/22/200011/22/2000  PEND
Print Pending Permit.LaserJet4     
Plan Review Report     
Plan Reviewer's activity    PEND
12/1/00 Called and talked to Jerry Teal about questions I have on the plans. He said he will get me two new sheets and some new calculations with a stamp. I called and left a message for Tim Johnson with Briggs to call me regarding this plan.
Plan Reviewer's activity    PEND
12/5/00 Tried to get a hold of the engineer again. I left him another message. I then called the builder and informed them that I am waiting for new drawing sheets from the architect and that I have not gotten a hold of the engineer.
Plan Reviewer's activity    PEND
12/7/00 Talked to Tim Johnson, the engineer, and discussed the areas I had questions on. He answered them, but there is some areas I need to get in contact with the architect on. Still waiting for plans from the architect that he said he would get to me last time I talked to him.
Plan Reviewer's activity    PEND
12/18/00 I recieved new sheets for the architect. I need the new foundation plan stamped by the engineer.
Plan Reviewer's activity    PEND
12/19/00 4:00 Called Jerry Teal, architect, and left a message for him to call me. I then called the builder and informed them that I left a message for the architect and what items I need from him. They said that they will also follow up with the architect.