BLD-Final | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | PASS |
Dave Hannah
|
|
|
###-#### c.c #23814 issued 4/15/2003 4:32:52 PM
|
BLD-Final | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | DONE |
Dave Hannah
|
|
|
SHAWN ###-####
|
DOC - Permit Finaled | 4/15/2003 | 4/15/2003 | 4/15/2003 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 4/15/2003 4:33:32 PM
|
BLD-Grading Inspection | 4/15/2003 | 4/15/2003 | 4/15/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
Reopen Permit (ISS) | | | 4/15/2003 | | DONE |
|
|
|
PER GEORGE SLANE OK TO RE-OPEN PERMIT & SET UP INSP
|
BLD-Final | 3/27/2003 | 3/28/2003 | 3/28/2003 | A | NR |
Dave Hannah
|
|
|
###-#### shawn
|
BLD-Energy code compliance | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | PASS |
Dave Hannah
|
|
|
basement walls
|
(F) Reprint permit | | | 11/22/2002 | | DONE |
|
|
|
|
BLD-Conference | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | PASS |
Dave Hannah
|
|
|
for conference extentsion ok to extent permit work in progress 11/8/2002 4:19:10 PM
|
PostCard Mailed | | | 11/1/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Framing/Rough-in | 4/4/2002 | 4/4/2002 | 4/4/2002 | P | PART |
Tony Young
|
|
|
sheer wall ###-#### shawn
int shear 4/5/2002 9:15:37 AM
|
BLD-Energy code compliance | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | PASS |
Tony Young
|
|
|
###-#### BERT
received eng letter on clearance on fireplace chimney, // eng. approved as built because of solid masonary wall w/ airspace built around clay lined flue w/ brick around flue, air space between brick and solid masonary. 3/25/2002 1:42:52 PM
|
BLD-Framing/Rough-in | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | PART |
Tony Young
|
|
|
###-#### SHAWN
re-inspect ok except chimney clearance, ok to insulate 3/20/2002 12:21:12 PM
|
BLD-Conference | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PART |
Tony Young
|
|
|
chimney/ combustion materials 3/19/2002 10:55:28 AMGeorge S. agrees w/ my c/n on having 2" clearance from masonary chimney 3/19/2002 3:30:47 PM
|
BLD-Framing/Rough-in | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Tony Young
|
|
|
###-####
c/n posted, ok to insulate 3/18/2002 1:27:13 PM
|
BLD-Framing/Rough-in | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PART |
Tony Young
|
|
|
SHEER WALL AND FRAIMING SHAWN ###-####
ext. shear ok 12/14/2001 2:13:06 PM
|
BLD-Foundation | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 08:45:25. Contact: ###-####.
|
BLD-Footing | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PART |
Tony Young
|
|
|
###-#### ROBERT
porch, poured already 9/17/2001 1:37:37 PM
|
BLD-Foundation | 7/19/2001 | 7/20/2001 | 7/20/2001 | A | PART |
Tony Young
|
|
|
###-####
wip 7/20/2001 11:35:31 AM
|
BLD-Footing | 7/16/2001 | 7/17/2001 | 7/17/2001 | A | PART |
Tony Young
|
|
|
SHAWN-- ###-#### FT -LATE AM IF POSSIBLE
verbal corrections 7/17/2001 11:25:27 AM
|
BLD-Footing | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | PART |
Russ Owen
|
|
|
###-#### interior isolated footings basement. 1/13/2002 3:25:10 PM
|
BLD-Foundation | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PART |
Tony Young
|
|
|
###-####
basement walls pass, ok to pour 5/22/2001 12:02:03 PM
|
BLD-Footing | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PART |
Tony Young
|
|
|
Robert ###-#### late am please
veral corrections, depth of ftgs 5/7/2001 11:02:25 AM
|
BLD-Grading Inspection | 5/7/2001 | 5/7/2001 | 5/7/2001 | | PASS |
Rita DeYoung
|
|
|
Foundation subgrade has been approved by the engineer.
|
Print Occupancy Form | | | 12/14/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/14/2000 | | DONE |
|
|
|
|
Telephone call | | | 12/14/2000 | | DONE |
|
|
|
talked to shawn gave dollar amount
|
Issue PAID IN FULL permit | | | 12/14/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 12/11/2000 | 12/11/2000 | 12/13/2000 | | PASS |
Dan Overy
|
|
|
12/13/2000 11:45:07 DJO - activity updated through activity BLDA022 from case BLD00-03414.
|
Plan Reviewer's activity | | | 12/13/2000 | | DONE |
|
|
|
received stamped footing/column detail and nailing schedules by fax on 12-13-2000. permit ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2000 | | DONE |
|
|
|
|
Plan Review Report | | | 12/12/2000 | | PEND |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/11/2000 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 12/11/2000 | | PEND |
|
|
|
STARTED REVIEW ON 12-7-2000. CONTACTED ENGINEER, DESIGNER AND CONTRACTOR ABOUT ADDITIONAL INFORMATION THAT IS REQUIRED BEFORE ISSUANCE OF PERMIT. EXTERIOR FOOTING DETAIL AND SHEAR NAILING SCHEDULES TO BE ADDRESSED.
|
Routing - PLANNING | 11/22/2000 | 11/22/2000 | 11/28/2000 | | PASS |
|
|
|
roger took to susan riggs/susan passed appeal ends 12/12/2000/do not issue until then. per susan riggs. pe
|
Routing - PUBLIC WORKS | 11/14/2000 | 11/14/2000 | 11/22/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/14/2000 | 11/14/2000 | 11/22/2000 | | DONE |
Rita DeYoung
|
|
|
Approved as category 1. took to terry records 11/14/2000
|
Application received | | | 11/14/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 11/28/2000 | 11/28/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 11/14/2000 | | | | PEND |
Dan Overy
|
|
|
|