(ST LUKES-CENTRAL WING BASEMENT / SUB-BSMNT. MECH. RM)* To demolish & excavate a portion of the basement and sub-basement Central Wing mechanical room for upgrade of mechanical equipment for service to the soon to be remodeled West Wing of SLRMC. Work includes removal of structural portions of interior walls & suspended floors; installation of new support footings, columns, pilasters, noncombustible floor & roof system; all incompliance with fire-resistive construction and protection of openings & penetrations per Tbl. 6-A & section 602 for Type I-FR Construction and separation from other areas of the hospital per Table 3-C, 1-hour occupancy separation. Use of the areas have been reviewed as accessory, non-habitable, mechanical & electrical equipment service rooms. Note: This building is fully sprinkled as condition of hospital occupancy per chapter 9 UBC. THE EXIT SYSTEM SERVING THE GROUND LEVEL DINING AREA SHALL BE MAINTAINED SO AS NOT TO CREATE A DEAD END CORRIDOR SYSTEM. PC#00-976/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/8/200310/8/200310/8/2003 DONE
DetailsDave Hannah
wip 10/10/2003 1:17:04 PM
BLD-Aging Inspection8/6/20038/6/20038/6/2003 PASS
DetailsCarl Dependahl
west wing infrastructure...WIP 8/6/2003 4:54:04 PM
BLD-Conference6/5/20036/6/20036/5/2003APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 6/5/2003 at 8:03:06 AM. Contact: ###-####....wip...w/ Mike Cotner, proj mgr 6/5/2003 10:39:15 AM
BLD-Aging Inspection6/2/20036/2/20036/2/2003 PASS
DetailsCarl Dependahl
rest of west wing upgrade not done..wip re mech & struct. 6/3/2003 1:38:25 PM
BLD-Conference3/26/20033/31/20033/31/2003APASS
DetailsCarl Dependahl
Follow up from aging...w/ Mike Cotner, Proj. Mgr...re status 3/31/2003 9:28:44 AM
BLD-Conference3/26/20033/27/20033/27/2003APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 3/26/2003 at 1:26:51 PM. Contact: ###-####....work still in progress, HVAC wip, not ready for final, will need spec insp reports, etc. at that time. 3/28/2003 10:20:50 AM
BLD-Aging Inspection3/20/20033/20/20033/26/2003 DONE
DetailsCarl Dependahl
called SLRMC office 3/26/2003 11:50:36 AM
Inspection Record Card- Bld  2/21/2003 DONE
Case Summary (BLD)  2/7/2003  
BLD-Aging Inspection1/17/20031/17/20031/17/2003 PASS
DetailsCarl Dependahl
WIP...still need all reports. 1/17/2003 9:27:40 AM
BLD-Conference2/12/20022/12/20022/12/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/12/2002 6:31:28 PM need affidavits, insp reports...all other agcy ok's for final
BLD-Aging Inspection1/7/20021/7/20021/7/2002 NR
DetailsCarl Dependahl
bsmt/mech upgrade for west wing 1/7/2002 5:01:03 PM
Fee Review-notes11/17/200011/17/200012/12/2001 DONE
no other sub permits
BLD-Aging Inspection11/7/200111/7/200111/7/2001 NR
DetailsCarl Dependahl
demo bsmt/mech for west wing emodel. 11/7/2001 10:05:25 AM
BLD-Concrete9/6/20019/7/20019/7/2001APART
DetailsCarl Dependahl
concrete ###-####- john; equip pads, ok 9/7/2001 8:54:25 AM
BLD-Concrete8/29/20018/30/20018/30/2001APART
DetailsCarl Dependahl
concrete john -###-#### curbs at mech room roof deck, bar in place, MTI onsite. 8/30/2001 11:18:14 AM
BLD-Framing/Rough-in8/13/20018/14/20018/14/2001APART
DetailsCarl Dependahl
structural steel John ###-####; deck, studs in place ok, pend MTI report. 8/14/2001 10:31:25 AM
BLD-Conference8/14/20018/14/20018/14/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/14/2001 9:46:43 AM w/ John Schultz...need all spec insp reports...
BLD-Foundation7/23/20017/23/20017/23/2001PPART
DetailsJim Storey
###-#### placed with special insp. pending report. 7/23/2001 4:07:12 PM
Plan resubmittals received  7/6/2001 DONE
Received two copies of revised sheets S-4 S-5, S-6, with two copies of supplemental calculations. Routed to Carl D. KMM
BLD-Concrete6/19/20016/20/20016/20/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/19/2001 at 08:09:29. Contact: ###-####. pend S.I. report 6/20/2001 5:03:32 PM
Plan resubmittals received  5/31/2001 DONE
Received two copies of revised S-1 thru S-5 sheets. two copies of supplimental calc. Routed to Carl D. KMM
BLD-Conference5/9/20015/9/20015/14/2001PPASS
DetailsCarl Dependahl
w/ john schultz 5/14/2001 3:10:57 PM
Override - Parcel Holds  3/7/2001  
Issue & PRINT to be Invoiced  3/7/2001 DONE
Routing - PLAN CHECK3/5/20013/5/20013/5/2001 PASS
Resubmittals reviewed and incerted. Processing for issuance.
PLANS/APPL TAKEN TO FRONT DESK  3/5/2001 PASS
To permit desk for processing to issue.
Override - Parcel Holds  3/5/2001  
Inspection Record Card- Bld  3/5/2001 DONE
Print Occupancy Form  3/5/2001 DONE
Print Occupancy Form  3/5/2001 DONE
Print Occupancy Form  3/5/2001 DONE
Print Occupancy Form  3/5/2001 DONE
Print Occupancy Form  3/5/2001 DONE
Print Occupancy Form  3/5/2001 DONE
Print Occupancy Form  3/5/2001 DONE
Plan assigned to (DRS)11/17/2000 3/5/2001 PASS
DetailsDan Stuart
3/5/2001 14:29:13 DRS - activity updated through activity BLDA022 from case BLD00-03449.
Plan resubmittals received  2/28/2001 DONE
Received two copies of revised sheets A2.0, S-1, S-2, S-3, S-4, S-5. One copy of response letter. Routed to Dan S. KMM
Routing - PLUMBING2/9/2001 2/20/2001 PASS
Routing - FIRE2/6/2001 2/9/2001 PASS
Plan Review Completed(1st rev)  2/9/2001 FAIL
Routing - PLAN CHECK2/9/2001 2/9/2001  
ROUTED TO PLUMBING FOR REVIEW WHILE WAITING FOR ARCHITECTS RESPONSE.
Plan resubmittals requested  2/6/2001 FAIL
faxed and mailed copy of review comments to architect.
Routing - PLAN CHECK11/21/2000 2/6/2001 FAIL
12/22/00 Dan separated out the office copy and issue copy. He sent the issue copy to outside eng. Mr. Albanese will be giving him another copy of plans to route inhouse. KMM
2/6/01 - Preliminary plan review completed. (Gregg Ostrow, SLRMC project architect had asked that another hospital project be moved ahead of this project - LDR Suite remodel). Copy of review comments faxed & mailed to architect for response
Plan resubmittals requested  2/1/2001  
COPY OF STRUCTURAL ENGINEERS REVIEW REPORT AND REQUIRED RESUBMITTALS FAXED AND MAILED TO ART ALBANESE AS ARCHITECT OF RECORD WITH ATTACHED COVER LETTER.
Routing Off Site - STRUCTURAL12/26/2000 1/8/2001 PASS
Will send the issue copy out to outside eng. Mr. Albanese will bring in another copy of plans for in house routing. Please give to Dan S. when they arrive. KMM
1/8/01 - RECEIVED STRUCTURAL REVIEW REPORT FROM AHJ. RESUBMITTAL OF MINOR NATURE REQUIRED. CAN BE REVIEW BY PLAN CHECK DIVISION.
Routing - PUBLIC WORKS11/17/2000 11/21/2000 PASS
Pending Assignment by MYS11/17/2000 11/17/2000 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  11/17/2000 DONE
Received Certificate of Value  11/17/2000 DONE
Application received  11/17/2000  
Routing - PLAN CHECK2/21/2001