Case Summary (BLD) | | | 4/3/2014 | | DONE |
|
|
|
|
Fee Review-notes | 11/17/2000 | 11/17/2000 | 10/4/2001 | | DONE |
|
|
|
|
BLD-Final | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PART |
Tom Arcoraci
|
|
|
JUDE ###-#### -FN ok for perm occ when code enfor signs 8/14/2001 8:55:32 PM
|
Permanent Occupancy | | 8/15/2001 | 8/15/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/15/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8793 issued 8-15-01 to Franklin Building Supply (warehouse).
|
Code Occupancy Approval | | | 8/15/2001 | | PASS |
|
|
|
Meets compliance with CZC00-00092
|
FIRE-Final Inspection | 8/13/2001 | 8/13/2001 | 8/13/2001 | A | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 8/13/2001 1:22:11 PM
|
BLD-Final | 8/13/2001 | 8/13/2001 | 8/13/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### wayne --- frameing inspection.posted c/n on site. 8/13/2001 11:57:07 AM
|
FIRE-Final Inspection | 7/6/2001 | 7/9/2001 | 7/9/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 7/9/2001 4:15:07 PM
|
BLD-Aging Inspection | 5/30/2001 | 5/30/2001 | 5/30/2001 | | PART |
Russ Owen
|
|
|
expires 8/15/01. 12/30/2001 10:17:03 AM
|
BLD-Foundation | 3/19/2001 | 3/19/2001 | 3/19/2001 | P | PART |
Russ Owen
|
|
|
wants to pour at 3:00 \\###-####dock walls ok. 3/19/2001 4:29:39 PM
|
BLD-Footing | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PASS |
Russ Owen
|
|
|
###-#### footing for loading dock 3/15/2001 1:19:17 PM
|
BLD-Framing/Rough-in | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### please call him on your way out. ok to cover east office,west side has rest room which does not comply with size dem on plans. 3/14/2001 1:27:01 PM
|
BLD-Footing | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | PART |
Russ Owen
|
|
|
interior footing inspection wayne ###-####need clairification from architect. 2/20/2001 1:56:46 PM
|
Inspection Record Card- Bld | | | 2/16/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/16/2001 | | DONE |
|
|
|
|
Telephone call | | | 2/16/2001 | | DONE |
|
|
|
TALKED TO WAYNE TO VERIFY PLANS ARE READY
|
Issue PAID IN FULL permit | | | 2/16/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/12/2001 | | 2/15/2001 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2001 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 11/20/2000 | | 2/15/2001 | | PASS |
Jason Blais
|
|
|
2/15/2001 15:22:57 JCB - activity updated through activity BLDA022 from case BLD00-03451.
|
Routing - FIRE | 2/7/2001 | | 2/12/2001 | | PASS |
|
|
|
approved per partial site plan AT-1, attached and dated FEB-12-01,on 8.5x11" paper and made a part of contract byADDENDUM NO. 1, February 12, 2001.
|
Routing - PLAN CHECK | 1/22/2001 | | 2/7/2001 | | FAIL |
|
|
|
Reviewed resubmittal sheets. Additional engineering required. Also, written request for alternate method/approval required for storage mezzanine. (mezzanine is less than 7' in height in some areas and floor joists are good for only 50 psf live load) Tenant and architect requesting some relief. Or mezzanine space to have no use or occupancy. (attic space) Plans routed to Fire Dept. for second review.
|
Plan resubmittals received | | | 2/1/2001 | | DONE |
|
|
|
Received one copy of gete. report. Routed to Jason. KMM
|
Plan resubmittals received | | | 1/31/2001 | | DONE |
|
|
|
Received tow copies of sheets A-1, A-2, A-3, A-4, A-5, C-1, C-2. Two copies of 2nd. revised calculations. One copy voided revised calcs. One copy calcs.
Two copies of letter dated Nov. 17, 2000 and two copies of voided letter dated Nov. 6, 2000. One copy of letter reference Plan Analysis. Routed to Jason B. KMM
|
Routing - FIRE | 1/22/2001 | | 1/22/2001 | | FAIL |
|
|
|
received hydrant flow: OK; still need access info & sprinkler underground
|
Routing - PUBLIC WORKS | 1/12/2001 | | 1/18/2001 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 1/12/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 1/5/2001 | | 1/12/2001 | | FAIL |
Richard Dailey
|
|
|
Provide access info, & water supply
|
Plan resubmittals requested | | | 1/5/2001 | | |
|
|
|
Response and plan resubmittals required for further review.
|
Routing - PLAN CHECK | 12/7/2000 | | 1/5/2001 | | FAIL |
|
|
|
Plan review report sent and faxed to architect, engineer, and contractor. Plan resubmittals and response required. Plans routed to Fire Dept. for review.
|
Routing - PUBLIC WORKS | 12/4/2000 | | 12/7/2000 | | FAIL |
|
|
|
Requires drainage plan revision per Brian Murphy. 12/7/00 DAR
|
Routing - PLANNING | 11/20/2000 | | 12/4/2000 | | PASS |
|
|
|
Approved per CZC00-92.
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2000 | | DONE |
|
|
|
Received three sets of civil sheets, one copy of drainage calculations and one copy of O & M manual. put with plans. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 11/20/2000 | | FAIL |
|
|
|
REQUIRES THREE EXTRA CIVIL SETS, DRAINAGE CALCS. AND O & M MANUAL. FAXED ARCHITECT AND APPLICANT. ROUTED TO MARLENE TO ASSIGN PLANS. KMM KMM
|
Pending Assignment by MYS | 11/17/2000 | | 11/20/2000 | | DONE |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/17/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 11/17/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|