Permit Information
Permit NumberBLD00-03472
StatusFinaled
Name MICRON TECHNOLOGY PCS3332
Site Address 8000 S FEDERAL WAY
Project NameMIC3332
Customer NumberPCS3332
ePlanReviewNo
Description
MICRON BUILDING #15 - AMMONIA SEGREGATION SCRUBBER - (PCS15-003332) * TO CONSTRUCT AN APPROXIMATE 760 SQ. FT. AMMONIA SCRUBBER MECHANICAL PENTHOUSE ENCLOSURE AT THE ROOF OF BUILDING #15, BETWEEN GRID LINES 3&5 AND A&B. THE PENTHOUSE WILL BE CONSTRUCTED AS A PRE-ENGINEERED BUTLER METAL BUILDING ON A CONCRETE SLAB FLOOR OVER A STRUCTURAL STEEL FRAME. THIS PENTHOUSE WILL BE USED AS A MECHANICAL ENCLOSURE FOR TWO NEW EXHAUST SCRUBBER UNITS. THIS PERMIT ALSO INCLUDES THE CONSTRUCTION OF METAL ACCESS STAIRS. THIS PERMIT IS ALSO FOR THE REROUTING AND MODIFYING OF THE EXISTING PSP EXHAUST DUCT WITHIN THE BUILDING PER THE APPROVED PLANS. ALL CONSTRUCTION PER THE APROVED PLANS AND ATTACHED COMMENT LIST. #984-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes11/21/200011/21/20004/17/2002 DONE
Letter of compliance  1/11/2002 DONE
Letter of Compliance #22115 issued 1-11-02.
BLD-Final11/8/200111/13/200111/13/2001PPASS
DetailsJim Storey
###-#### final ok. 11/13/2001 3:34:24 PM
BLD-Final10/24/200110/26/200110/26/2001PCANC
DetailsRuss Owen
###-####Unable to gain access called contractor will recall. 10/26/2001 12:09:37 PM
BLD-Aging Inspection10/3/200110/3/200110/3/2001 PART
DetailsJim Storey
fire insp.8/2001 wip 10/3/2001 10:42:43 AM
FIRE-Final Inspection8/3/20018/3/20018/3/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 8/3/2001 1:48:54 PM
FIRE-Final Inspection6/20/20016/20/20016/20/2001PFAIL
DetailsRick Jackson
Added by Inspector: 409 On 6/20/2001 2:25:42 PM need city approved plans and alarms completed; need manual release for preaction system
BLD-Aging Inspection5/16/20015/16/20015/16/2001 FAIL
DetailsJim Storey
This is an aging activity no call for fire insp / no mech permit isued for this project on the project record / should have a framing next week. 5/16/2001 5:18:03 PM 5/16/2001 5:19:08 PM
(F) Reprint permit  4/26/2001 DONE
Print Occupancy Form  4/26/2001 DONE
BLD-Concrete1/23/20011/24/20011/24/2001PPASS
DetailsJim Storey
###-#### housekeeping curb for pannlized bld rebar ok / pending special insp. reports for all steel and strucral platform insp. performed earler. 1/24/2001 3:26:07 PM
BLD-Concrete1/23/20011/24/20011/24/2001PPASS
DetailsJim Storey
###-#### housekeeping curb for pannlized bld rebar ok / pending special insp. reports for all steel and strucral platform insp. performed earler. 1/24/2001 3:26:07 PM
Routing Off Site - STRUCTURAL1/16/2001 1/18/2001 PASS
Faxed engineer of record's response and additional calculations to the consulting engineer for review. JCM Received fax from consulting engineer approving final resubmittals. JCM
PLANS/APPL TAKEN TO FRONT DESK  1/18/2001 PASS
Print Occupancy Form  1/18/2001 DONE
Inspection Record Card- Bld  1/18/2001 DONE
Telephone call  1/18/2001 DONE
called permit ready
Issue & PRINT to be Invoiced  1/18/2001 DONE
Plan assigned to (JCM)11/21/2000 1/18/2001 PASS
DetailsJohn Menard
1/18/01 10:48:45 JCM - activity updated through activity BLDA022 from case BLD00-03472.
Routing - PLAN CHECK12/8/2000 1/18/2001 PASS
Plan resubmittals received  1/16/2001  
Received a faxed copy of additional structural calculations and response letter to consulting structural engineer's comment list requesting revisions. JCM
Plan resubmittals requested  1/11/2001  
Faxed Paul Marcolina a copy of the comment list from the consulting engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL12/27/2000 1/11/2001  
Sent Butler Building caculations to consulting engineer
Routing Off Site - STRUCTURAL11/28/2000 1/11/2001 FAIL
Sent set of plans to consultanting engineer via PDQ. 11/28/00 Received phone call from consulting engineer requesting additional plans and calculations for this project. Apparently plans and calculations were lost in transit to the engineer. JCM
Routing Off Site - STRUCTURAL1/9/2001 1/10/2001 FAIL
Sent one set of structural caculations to Mike Brown, Atwood, Hinzman, Jones that were prepared by Pinnacle Engineers. Sent them via PDQ. Received comment list from consulting engineer requesting revisions. JCM
Additional plans submitted  1/9/2001 DONE
Received 3 sets of structural caculations from Paul Marcolina of Micron. Forwarded two to John Menard and one to Atwood, Hinzman, Jones. 1/9/01 DAR
Plan resubmittals received  12/27/2000  
Received requested additional plans and calculations for the pre-engineered steel building. JCM
Plan resubmittals requested  12/19/2000  
Dave Radford called Micron to request additional plans and calculations for the pre-engineered steel building. These plans were to replace those that were lost. JCM
Routing - FIRE12/5/200012/8/200012/8/2000 DONE
DetailsBill Alexander
Plan Review Completed(1st rev)  12/8/2000 PASS
Plan Reviewer's activity  12/5/2000 PASS
PLANS REVIEWED AND APPROVED AS SUBMITTED WITH ATTACHED COMMENT LIST. JCM
Routing - PLAN CHECK11/27/2000 12/5/2000 PASS
took to john m.
Additional plans submitted  11/28/2000 DONE
Received a set of plans to send to outside engineering. Forwarded same to John Menard. 11/27/00 DAR
Routing - PLUMBING11/22/2000 11/27/2000 PASS
per plans and 97 upc
Routing - PUBLIC WORKS11/21/2000 11/22/2000 PASS
Plan assigned to (MYS)11/21/200011/21/200011/21/2000 DONE
DetailsMarlene Southard
Application received  11/21/2000  
Plans ACCEPTED BY PLAN TECH  11/21/2000 DONE
Called Paul Marcolina and advised him that we required a third set of plans to send to consultanting engineer. 11/21/00 DAR