Fee Review-notes | 11/21/2000 | 11/21/2000 | 4/17/2002 | | DONE |
|
|
|
|
Letter of compliance | | | 1/11/2002 | | DONE |
|
|
|
Letter of Compliance #22115 issued 1-11-02.
|
BLD-Final | 11/8/2001 | 11/13/2001 | 11/13/2001 | P | PASS |
Jim Storey
|
|
|
###-#### final ok. 11/13/2001 3:34:24 PM
|
BLD-Final | 10/24/2001 | 10/26/2001 | 10/26/2001 | P | CANC |
Russ Owen
|
|
|
###-####Unable to gain access called contractor will recall. 10/26/2001 12:09:37 PM
|
BLD-Aging Inspection | 10/3/2001 | 10/3/2001 | 10/3/2001 | | PART |
Jim Storey
|
|
|
fire insp.8/2001 wip 10/3/2001 10:42:43 AM
|
FIRE-Final Inspection | 8/3/2001 | 8/3/2001 | 8/3/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/3/2001 1:48:54 PM
|
FIRE-Final Inspection | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 6/20/2001 2:25:42 PM need city approved plans and alarms completed; need manual release for preaction system
|
BLD-Aging Inspection | 5/16/2001 | 5/16/2001 | 5/16/2001 | | FAIL |
Jim Storey
|
|
|
This is an aging activity no call for fire insp / no mech permit isued for this project on the project record / should have a framing next week. 5/16/2001 5:18:03 PM 5/16/2001 5:19:08 PM
|
(F) Reprint permit | | | 4/26/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/26/2001 | | DONE |
|
|
|
|
BLD-Concrete | 1/23/2001 | 1/24/2001 | 1/24/2001 | P | PASS |
Jim Storey
|
|
|
###-#### housekeeping curb for pannlized bld rebar ok / pending special insp. reports for all steel and strucral platform insp. performed earler. 1/24/2001 3:26:07 PM
|
BLD-Concrete | 1/23/2001 | 1/24/2001 | 1/24/2001 | P | PASS |
Jim Storey
|
|
|
###-#### housekeeping curb for pannlized bld rebar ok / pending special insp. reports for all steel and strucral platform insp. performed earler. 1/24/2001 3:26:07 PM
|
Routing Off Site - STRUCTURAL | 1/16/2001 | | 1/18/2001 | | PASS |
|
|
|
Faxed engineer of record's response and additional calculations to the consulting engineer for review. JCM Received fax from consulting engineer approving final resubmittals. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 1/18/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/18/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/18/2001 | | DONE |
|
|
|
called permit ready
|
Issue & PRINT to be Invoiced | | | 1/18/2001 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 11/21/2000 | | 1/18/2001 | | PASS |
John Menard
|
|
|
1/18/01 10:48:45 JCM - activity updated through activity BLDA022 from case BLD00-03472.
|
Routing - PLAN CHECK | 12/8/2000 | | 1/18/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/16/2001 | | |
|
|
|
Received a faxed copy of additional structural calculations and response letter to consulting structural engineer's comment list requesting revisions. JCM
|
Plan resubmittals requested | | | 1/11/2001 | | |
|
|
|
Faxed Paul Marcolina a copy of the comment list from the consulting engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 12/27/2000 | | 1/11/2001 | | |
|
|
|
Sent Butler Building caculations to consulting engineer
|
Routing Off Site - STRUCTURAL | 11/28/2000 | | 1/11/2001 | | FAIL |
|
|
|
Sent set of plans to consultanting engineer via PDQ. 11/28/00 Received phone call from consulting engineer requesting additional plans and calculations for this project. Apparently plans and calculations were lost in transit to the engineer. JCM
|
Routing Off Site - STRUCTURAL | 1/9/2001 | | 1/10/2001 | | FAIL |
|
|
|
Sent one set of structural caculations to Mike Brown, Atwood, Hinzman, Jones that were prepared by Pinnacle Engineers. Sent them via PDQ. Received comment list from consulting engineer requesting revisions. JCM
|
Additional plans submitted | | | 1/9/2001 | | DONE |
|
|
|
Received 3 sets of structural caculations from Paul Marcolina of Micron. Forwarded two to John Menard and one to Atwood, Hinzman, Jones. 1/9/01 DAR
|
Plan resubmittals received | | | 12/27/2000 | | |
|
|
|
Received requested additional plans and calculations for the pre-engineered steel building. JCM
|
Plan resubmittals requested | | | 12/19/2000 | | |
|
|
|
Dave Radford called Micron to request additional plans and calculations for the pre-engineered steel building. These plans were to replace those that were lost. JCM
|
Routing - FIRE | 12/5/2000 | 12/8/2000 | 12/8/2000 | | DONE |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 12/8/2000 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 12/5/2000 | | PASS |
|
|
|
PLANS REVIEWED AND APPROVED AS SUBMITTED WITH ATTACHED COMMENT LIST. JCM
|
Routing - PLAN CHECK | 11/27/2000 | | 12/5/2000 | | PASS |
|
|
|
took to john m.
|
Additional plans submitted | | | 11/28/2000 | | DONE |
|
|
|
Received a set of plans to send to outside engineering. Forwarded same to John Menard. 11/27/00 DAR
|
Routing - PLUMBING | 11/22/2000 | | 11/27/2000 | | PASS |
|
|
|
per plans and 97 upc
|
Routing - PUBLIC WORKS | 11/21/2000 | | 11/22/2000 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 11/21/2000 | 11/21/2000 | 11/21/2000 | | DONE |
Marlene Southard
|
|
|
|
Application received | | | 11/21/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2000 | | DONE |
|
|
|
Called Paul Marcolina and advised him that we required a third set of plans to send to consultanting engineer. 11/21/00 DAR
|