Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD00-03496
StatusFinaled
Name WEST COAST PAPER
Site Address 1050 W RIVER ST
Project NameWEST COAST PAPER
Customer Number 
ePlanReviewNo
Description
*WEST COAST PAPER WAREHOUSE & SALES* - WAREHOUSE MODIFICATION / EXPANSION / RETAIL SALES AREA INCREASE & WHEELCHAIR LIFT FOR ACCESSIBILITY. To incorporate the adjacent 4,943 sq. ft. tenant space, previously 1040 W River Street, Resource Center, Inc., as part of the West Coast Paper Warehouse Storage Area by removing approximately 146 feet of tenant separation wall. The existing west 1-hour tenant separation wall of 'Greenleaf Floral",1030 W River St., is extended 39 feet to the north, to meet the 4-hour Area Separation wall. A 3,330 sq. ft. rectangular shaped portion from the original West Coast tenant area is removed to become a portion of the Greenleaf Floral warehouse. This remodel results in an area increase of 1,613 sq. ft. to West Coast Paper Warehouse storage area, a new TOTAL of 32,771 sq. ft. The original 959 sq. ft. retail sales area (1994 permit) has been expanded to include the 944 s.f. and 2,504 sq. ft adjacent areas originally classified as warehouse stock room areas, a new total area of 4,407 sq. ft. retail sales. The occupancy use groups will remain the same as the original 1994 remodel permit for which a certificate of occupancy was issued, but the overall area,s of the warehouse & retail sales will increase. The total occupant load for the space will also increase.To upgrade the exit system from the 'SALES' area with two complying exit access & exit systems; to install directional exit signs and reverse swing of existing door(s) leading to exits, all as noted on approved plan. To install a 'wheelchair lift for accessibility as an alternate method, approved 5/30/01 by Mr. Hogland, Building Official. A NEW CERTIFICATE OF OCCUPANCY IS REQUIRED FOR THIS TENANT TO INDICATE THE INCREASED AREA AND THE NEW OCCUPANT LOADS SINCE THE 1994 C.O. NOTE: This building is fully fire sprinkled for allowable area increase. NOTE: A letter from tenant General Manager declares that there will be no high pile storage in this tenant space. PC#00-993/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 10/8/200310/8/2003 DONE
Permanent occupancy  10/8/2003 DONE
Perm. Occ. Cert. # 9835 issued 10-8-03 to West Coast Paper.
Permanent Occupancy 9/18/20039/18/2003 DONE
Details
BLD-Final9/17/20039/18/20039/18/2003APASS
DetailsJim Storey
###-#### sid.......please note the parcel hold say that this permit & bld02-02768 need to be finaled together l/c ok 9/18/2003 10:48:11 AM
FIRE-Final Inspection9/16/20039/17/20039/17/2003APASS
DetailsRick Jackson
sid , ###-#### call prior to inspection///MWL
Override - Parcel Holds  9/17/2003  
Override - Parcel Holds  9/16/2003  
FIRE-Final Inspection9/9/20039/10/20039/10/2003ACANC
DetailsRick Jackson
###-#### sid
Override - Parcel Holds  9/9/2003  
BLD-Aging Inspection6/30/20036/30/20036/30/2003 DONE
DetailsCarl Dependahl
called, need fire, work completed. 6/30/2003 9:34:17 AM
BLD-Final4/28/20034/28/20034/28/2003PNR
DetailsCarl Dependahl
###-#### chris needs to be finaled at same time as bld02-02768, need fire 1st... 4/28/2003 2:08:53 PM ...obtain fire 1st 4/28/2003 2:09:28 PM
Override - Parcel Holds  4/28/2003  
BLD-Conference4/9/20034/9/20034/9/2003PPASS
DetailsCarl Dependahl
need vents, fire insp, etc. for final. 4/11/2003 4:56:16 PM
BLD-Conference1/14/20031/15/20031/15/2003APASS
DetailsCarl Dependahl
chk progress ...most of work complete, vents for warehse not begun. 1/15/2003 4:47:56 PM
BLD-Conference2/13/20022/14/20022/14/2002APASS
DetailsCarl Dependahl
SID ###-####, need signatures, fix stairs, seal demising. 2/14/2002 12:23:57 PM
Issue PAID IN FULL permit  7/23/2001 DONE
Inspection Record Card- Bld  7/17/2001 DONE
Print Occupancy Form  7/17/2001 DONE
Print Occupancy Form  7/17/2001 DONE
Telephone call  7/17/2001 DONE
called Ryan Anderson ###-#### permit ready for pickup
Routing - PLAN CHECK7/11/20017/11/20017/16/2001 PASS
Inserted new plans and comments in response to 4/30/01 second set of plan review conditions. Approved as noted and attached plan review conditions.
PLANS/APPL TAKEN TO FRONT DESK  7/16/2001 PASS
To permit desk for issuance.
Received Certificate of Value  7/16/2001  
Received new C.V. - changed from $5,020.00 to $15,000.00 Initial with $3,000.00 electrical.
Plan assigned to (DRS)11/28/2000 7/16/2001 PASS
DetailsDan Stuart
7/16/2001 15:59:35 DRS - activity updated through activity BLDA022 from case BLD00-03496.
Plan resubmittals received  7/10/2001 DONE
Received two copies of revised sheets 1 of 1. one copy of letter from architect. Two copies of wheelchair lift spec., and two copies of ASME - PART XX. Routed to Dan Stuart. KMM
Meeting  6/27/2001  
10:30 a.m. W/ Ken DeHart & Cindee Amata, West Coast Paper; Cindi King & Pete Rockwell, Rockwell Architectural Planning; Ryan Anderson & Mr. Wolfe, Sundance Properties; Cori Barrera & Brad Dixon, Moffatt Thomas Attorney representing West Coast Paper; Marlene Southard & Dan Stuart, PDS Plan Check Div.; Teresa Sobatka, City Attorney, PDS; Bill Alexander & Sam Rogers, Fire Code Plan Check met to review remaining requirements for West Coast Paper at 1050 River St ( details for construction of second exit and accessible lift approved by Tim Hogland as an alternate, for the expanded tenant space and the increased retail sales area) under this permit and what is required to be submitted for the the tenant improvement & occupancy of a tenant space at Miller & 10th Street for West Coast Paper expansion for storage area. A separate application, plans, review and approval for a permit, and the issuance of a separate certificate of occupancy is required for the new space. Accessiblitity to the storage space appears to have been altered under a separate permit to Downtown Storage Center, 510 S. 11th (same building), BLD99-1128, and the alterations shown & noted on approved plans not completed. Mr. rockwell is to do an code analysis and provide plans for the prpopsed expansion project.
Waiting for Cert. of Value  6/27/2001  
New Certificate of Value required for additional work.
Routing - PLANNING5/2/2001 5/3/2001 PASS
Plan Reviewer's activity  5/1/2001 FAIL
Resubmittal sheet of 4/26/01 incerted into original plans as replacement sheet. Plans reviewed and found that the accessiblitlity issue for the new required second exit (a requirement based on the increase in area of the retail sales that required exit separation and 2 complying exits) an occupancy use change of the "S1" to "M". New entry & stair/ landing on the exterior of the building requires circulation of plans to Planning Div. for review and approval. Correction notice FAXED and Mailed to Peter Rockwell, architect and phone call to Ryan Anderson, Sundance Const. Routing plans to Planning.
Plan resubmittals requested  5/1/2001  
Faxed and Mailed copy of remaining corrections needing addressed for this project before permit can be issued to Peter Rockwell, Architect. The plans proposed a possible Wheelchair platform lift (not allowed as general solution for accessiblity under current code), and a new stair, landing and exit door on the East side of retail sales area to provide proper exiting, exit separation, exit signs and illumination with proper door hardware. Outstanding question involves code complying access to the retail sales area for those with physical disabilities. Reviewed by phone with Cindy at Rockwell Architects.
Plan resubmittals received  4/27/2001 DONE
Received two copies of revised sheet 1 of 1. One copy of coment review letter. Routed to Dan S. KMM
Telephone call  1/4/2001 DONE
Called and talked with Ryan Anderson, The Sundance Co., to see if the original stairs and landing had been removed from exterior of building at the location where the door had been removed and the wall constructed that will now be reopened to provide required second exit from the enlarged, higher occupant load sales areas. Ryan said they had been removed. I told him the new access way would need to meet current code to provide access for the handicapped to the sales area unles there is an existing accessible route that was not shown on the plans. I ask if the elevation from grade to the floor level was 63" based on the 9 stairs indicated on the latest plan submittals from Pete Rockwell. Ryan said he would have to check. I told him I would call Pete Rockwell or Cindi at Pete's office to see if they new if the ramp shown for access to the warehouse for vehicles was compliant for accessibility use with slope, landing at top & handrails along the sides. If not a plan with details for the accessible route to the newly to be reinstalled door would be required.
Plan resubmittals requested  1/4/2001 FAIL
Plans submitted for new second exit (to reopen previously infilled exterior door opening for second required exit) from the recently expanded retail sales areas to the exterior grade needs to be installed with an accessible ramp with intermediate landings per code for acvcessibility compliance unless an existing accessible compliant route already existis. None shown on plans. Have phoned and left voisce mail for Pete or Cindi and have reviewed with Ryan Anderson of The Sundance Co. Am sending a FAX to Pete Rockwell on incomplete plans & the additional; details and information required.
Plan resubmittals received  1/3/2001 FAIL
Floor plan resubmittals provided to show second exit for retail sales increased in area and occupant load. Door will be in same location as previous and the landings and ramps (stairs ok if current accessible compliant route exists - not shown on plans submitted) will be constructed to provide accessible route to the retail sales area. No details or discussion on accessible route provide with plans. Stairs are shown with a landing but these were no detailed nor are any railings. Plan resubmittals and architects review for code compliance is incomplete in the scope of the resubmittals.
Routing - FIRE12/5/200012/7/200012/7/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  12/7/2000 FAIL
Plans ACCEPTED BY PLAN TECH  11/28/2000 DONE
Received Certificate of Value  11/28/2000 DONE
Application received  11/27/2000  
Routing - PLAN CHECK12/7/200012/7/2000   
TOOK TO DAN S
Routing - PLAN CHECK11/28/200012/5/2000  FAIL
ROUTING TO FIRE ANALYST
Routing - PLAN CHECK5/3/2001