Permit Information
Permit NumberBLD00-03503
StatusFinaled
Name WOODSIDE HOMES INC
Site Address 5546 N ROSEPOINT WAY
Project Name 
Customer Number585-2800
ePlanReviewNo
Description
This project is to build a new 2-story 1534s.f. single family dwelling with 1179s.f. on the 1st level and 355s.f. on the upper level and a 440s.f. attached 2-car garage. all pe rthe approved plans and attached conditions..R-1b with R-1C setbacks per CU-40-97 ajb...PC# 1026...pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/13/20012/13/20012/13/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/13/2001 at 09:43:01. Contact: ###-####. C/C issued 2/13/2001 3:56:32 PM
DOC - Permit Finaled2/13/20012/13/20012/13/2001PPASS
DetailsJim Sly
Added by Inspector: 316 On 2/13/2001 3:55:33 PM
BLD-Energy code compliance1/22/20011/22/20011/22/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 01/22/2001 at 08:25:51. Contact: ###-####.
BLD-Framing/Rough-in1/19/20011/19/20011/19/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 01/19/2001 at 08:48:48. Contact: ###-####.
BLD-Framing/Rough-in1/17/20011/17/20011/17/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 01/17/2001 at 08:49:17. Contact: ###-####. Shear OK 1/17/2001 3:31:04 PM
BLD-Framing/Rough-in1/16/20011/16/20011/16/2001PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 01/16/2001 at 08:22:30. Contact: ###-####. NR 1/16/2001 3:21:36 PM
BLD-Foundation12/18/200012/18/200012/18/2000PPASS
DetailsJim Sly
STEVE 941- 2860 FOUND WALL
BLD-Footing12/14/200012/15/200012/15/2000APART
DetailsJim Sly
FT INSP STEVE ###-####
BLD-Footing12/14/200012/14/200012/14/2000PPART
DetailsDave Hannah
hugh ###-####
Issue PAID IN FULL permit  12/14/2000 DONE
(F) Reprint permit  12/12/2000 DONE
(F) Reprint permit  12/12/2000 DONE
Plan Review Report  12/12/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/12/2000 DONE
Inspection Record Card- Bld  12/12/2000 DONE
Telephone call  12/12/2000 DONE
called permit ready
Plan assigned to (PEP)12/6/2000 12/12/2000 PASS
DetailsPerry Paine
12/12/2000 11:20:37 PEP - activity updated through activity BLDA022 from case BLD00-03503.
Telephone call  12/8/2000 DONE
called and talked to the designer on the missing support for the upper floor/roof at the east siode of the upper floor
Case Summary (BLD)  12/6/2000 DONE
Telephone call  12/6/2000 DONE
Calle dand spoke to builder Hugh, he said that he will have the eng submit calcs and redline drawing fo rthe proper lot and block..9:23 a.m. pep
Pending Assignment by DJO11/28/2000 12/6/2000 DONE
DetailsDan Overy
12/6/2000 08:39:02 PEP - activity updated through activity BLDA176 from case BLD00-03503.
Telephone call  12/4/2000 DONE
called eng of record, the eng sheets have been altered by changing lot and block using white-out and re marking, cover sheet has been removed and wet stamp is not supplied. Eng said that stamp is to be req on his eng sheets, I called the builder at 3:00 but he has not returned my call review will be on hold until the info is submitted
Routing - PUBLIC WORKS11/28/200011/28/200012/1/2000 PASS
Routing - PLANNING11/30/200011/30/200011/30/2000 PASS
Revissed plans to meet garage requirement.
Routing - PLANNING11/28/200011/28/200011/28/2000 FAIL
Does not meet minimum garage width or depth. Called woodside homes. Need new site plans, floor plans, and foundation plans.
Application received  11/28/2000  
Routing - PLAN CHECK12/1/200012/1/2000  PEND