Case Summary (BLD) | | | 5/23/2002 | | |
|
|
|
|
Fee Review-notes | 11/28/2000 | 11/28/2000 | 5/24/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/1/2001 | | DONE |
|
|
|
|
BLD-Final | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PASS |
Tom Arcoraci
|
|
|
jeff ###-#### reinspection ok for perm 4/18/2001 10:28:11 AM
|
FIRE-Final Inspection | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PASS |
Joe Tawney
|
|
|
jeff 861-315 REinsp OK for permanant occupancy 4/18/2001 11:08:32 AM
|
Permanent Occupancy | | 4/18/2001 | 4/18/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/18/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8635 issued 4-18-01 to the J. R. Simplot Company.
|
FIRE-Final Inspection | 4/13/2001 | 4/16/2001 | 4/16/2001 | A | FAIL |
Joe Tawney
|
|
|
###-####. 4/16/2001 8:30:29 AM Reinsp Fail Spklr monitoring 4/16/2001 1:34:40 PM
|
BLD-Final | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | FAIL |
Tom Arcoraci
|
|
|
Jeff ###-#### no fire final 4/13/2001 5:09:42 PM
|
FIRE-Final Inspection | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | FAIL |
Joe Tawney
|
|
|
Jeff ###-#### Final Fail Alarm system 4/16/2001 8:26:22 AM
|
BLD-Final | 4/5/2001 | 4/6/2001 | 4/6/2001 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 16:57:57. Contact: ###-####.
|
BLD-Other | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 10:06:10. Contact: ###-####. 3/28/2001 11:11:25 AM 1 hr fire wall above ceiling grid both sides ok 3/28/2001 12:46:54 PM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 11:16:57. Contact: ###-####. wip ok to cover int walls 2/21/2001 11:18:52 AM
|
BLD-Framing/Rough-in | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | PART |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 2/21/2001 4:38:56 PM wip 1 hr walls 2/22/2001 8:35:40 AM
|
BLD-Conference | 2/15/2001 | 2/16/2001 | 2/16/2001 | P | PASS |
Tom Arcoraci
|
|
|
joe ###-#### need detail for 1hr change from arch 2/20/2001 10:01:42 AM
|
Issue PAID IN FULL permit | | | 1/30/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/29/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/29/2001 | | DONE |
|
|
|
|
Telephone call | | | 1/29/2001 | | DONE |
|
|
|
TALKED TO KATIE BUTLER TO VERIFY PLANS ARE READY
|
Routing - PLAN CHECK | 1/26/2001 | | 1/26/2001 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review. See conditions list.
|
Plan Review Completed(1st rev) | | | 1/26/2001 | | |
|
|
|
Failed first UBC plan review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2001 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 11/28/2000 | | 1/26/2001 | | PASS |
Carl Westfall
|
|
|
1/26/01 16:18:42 CJW - activity updated through activity BLDA022 from case BLD00-03505.
|
Routing - FIRE | 1/17/2001 | | 1/26/2001 | | PASS |
|
|
|
faxed conditions to architect
|
Plan resubmittals received | | | 1/24/2001 | | DONE |
|
|
|
Received two copies of revised sheets A.01, A1.1, A2.1, M1.0, M2.1 AND E2.0P. One copy of response to Plan Review letter and one copy of letter detailing chemicals to be used in Lab. Routed to Carl W. KMM
|
Routing - PLUMBING | 1/16/2001 | | 1/17/2001 | | PASS |
|
|
|
per plans and 97 upc
|
Routing - PLAN CHECK | 12/6/2000 | | 1/16/2001 | | |
|
|
|
Failed UBC plan review. Sent report to the architect.
|
Plan Reviewer's activity | | | 1/11/2001 | | |
|
|
|
Failed UBC plan review. With complete application, UBC plan review started January 11, 2001 and finished January 16, 2001. A response from the architect was required. See the conditions list.
|
Additional plans submitted | | | 1/10/2001 | | DONE |
|
|
|
Received small documents from CSHQA, forwarded same to Carl Westfall. 1/10/01 DAR This resubmittal made it possible to perform a UBC plan review. CJW
|
Plan resubmittals received | | | 12/15/2000 | | DONE |
|
|
|
Received two copies of revised sheet M1.0, P2.0 and P2.1. Routed to Carl W. KMM
|
Plan Reviewer's activity | | | 12/13/2000 | | |
|
|
|
Drawings were placed on HOLD. The plan review could not be done without information about the processes and quantities of hazardous materials present. A letter was sent to the architect. Until the required information is received, this project is on "hold".
|
Routing - PLUMBING | 11/30/2000 | | 12/5/2000 | | |
|
|
|
Failed first UPC review. All water piping to the lab, both hot and cold, shall be protected by an R.P. installed in accordance with the 1997 UPC, except the emergency shower which must be from the potable water supply. all water ouitlets associated with the lab shall be posted "CAUTION: NONPOTABLE WATER, DO NOT DRINK".
|
Routing - PLANNING | 12/5/2000 | | 12/5/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 11/28/2000 | | 11/30/2000 | | PASS |
|
|
|
|
Plan assigned to (MYS) | 11/28/2000 | 11/28/2000 | 11/28/2000 | | DONE |
Marlene Southard
|
|
|
|
Application received | | | 11/28/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/28/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/28/2000 | | DONE |
|
|
|
|