Permit Information
Permit NumberBLD00-03505
StatusFinaled
Name J R SIMPLOT COMPANY (BIOLAB)
Site Address 5369 W IRVING ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(J R SIMPLOT COMPANY BIOLAB) This building is fire sprinklered to allow hazardous materials that would not otherwise be allowed. To remodel a 1,800 square foot area within and existing 18,000 square foot building. A 1,437 square foot "lab block" made up of a radioactive lab, a molecular lab, a transformation lab, an equipment room and a small office is being created. The quantity of hazardous materials within the "lab block" shall not exceed the exempt quantities established by 1997 UBC Tables 3-D and 3-E. Selective nonstructural demolation is covered under this permit. Work is to include 1-hr occupancy separation walls, interior nonbearing walls, interior doors, modifications to the suspended ceiling system, mill work, interior finishes, an exhaust system, and equipment all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-997-00 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/23/2002  
Fee Review-notes11/28/200011/28/20005/24/2001 DONE
Case Summary (BLD)  5/1/2001 DONE
BLD-Final4/17/20014/18/20014/18/2001APASS
DetailsTom Arcoraci
jeff ###-#### reinspection ok for perm 4/18/2001 10:28:11 AM
FIRE-Final Inspection4/17/20014/18/20014/18/2001APASS
DetailsJoe Tawney
jeff 861-315 REinsp OK for permanant occupancy 4/18/2001 11:08:32 AM
Permanent Occupancy 4/18/20014/18/2001 DONE
Details
Permanent occupancy  4/18/2001 DONE
Perm. Occ. Cert. #8635 issued 4-18-01 to the J. R. Simplot Company.
FIRE-Final Inspection4/13/20014/16/20014/16/2001AFAIL
DetailsJoe Tawney
###-####. 4/16/2001 8:30:29 AM Reinsp Fail Spklr monitoring 4/16/2001 1:34:40 PM
BLD-Final4/13/20014/13/20014/13/2001PFAIL
DetailsTom Arcoraci
Jeff ###-#### no fire final 4/13/2001 5:09:42 PM
FIRE-Final Inspection4/13/20014/13/20014/13/2001PFAIL
DetailsJoe Tawney
Jeff ###-#### Final Fail Alarm system 4/16/2001 8:26:22 AM
BLD-Final4/5/20014/6/20014/6/2001PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/05/2001 at 16:57:57. Contact: ###-####.
BLD-Other3/27/20013/28/20013/28/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/27/2001 at 10:06:10. Contact: ###-####. 3/28/2001 11:11:25 AM 1 hr fire wall above ceiling grid both sides ok 3/28/2001 12:46:54 PM
BLD-Framing/Rough-in2/20/20012/21/20012/21/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/20/2001 at 11:16:57. Contact: ###-####. wip ok to cover int walls 2/21/2001 11:18:52 AM
BLD-Framing/Rough-in2/21/20012/21/20012/21/2001PPART
DetailsTom Arcoraci
Added by Inspector: 408 On 2/21/2001 4:38:56 PM wip 1 hr walls 2/22/2001 8:35:40 AM
BLD-Conference2/15/20012/16/20012/16/2001PPASS
DetailsTom Arcoraci
joe ###-#### need detail for 1hr change from arch 2/20/2001 10:01:42 AM
Issue PAID IN FULL permit  1/30/2001 DONE
Inspection Record Card- Bld  1/29/2001 DONE
Print Occupancy Form  1/29/2001 DONE
Telephone call  1/29/2001 DONE
TALKED TO KATIE BUTLER TO VERIFY PLANS ARE READY
Routing - PLAN CHECK1/26/2001 1/26/2001 PASS
Drawings approved, with conditions, after resubmittal review. See conditions list.
Plan Review Completed(1st rev)  1/26/2001  
Failed first UBC plan review.
PLANS/APPL TAKEN TO FRONT DESK  1/26/2001 PASS
Plan assigned to (CJW)11/28/2000 1/26/2001 PASS
DetailsCarl Westfall
1/26/01 16:18:42 CJW - activity updated through activity BLDA022 from case BLD00-03505.
Routing - FIRE1/17/2001 1/26/2001 PASS
faxed conditions to architect
Plan resubmittals received  1/24/2001 DONE
Received two copies of revised sheets A.01, A1.1, A2.1, M1.0, M2.1 AND E2.0P. One copy of response to Plan Review letter and one copy of letter detailing chemicals to be used in Lab. Routed to Carl W. KMM
Routing - PLUMBING1/16/2001 1/17/2001 PASS
per plans and 97 upc
Routing - PLAN CHECK12/6/2000 1/16/2001  
Failed UBC plan review. Sent report to the architect.
Plan Reviewer's activity  1/11/2001  
Failed UBC plan review. With complete application, UBC plan review started January 11, 2001 and finished January 16, 2001. A response from the architect was required. See the conditions list.
Additional plans submitted  1/10/2001 DONE
Received small documents from CSHQA, forwarded same to Carl Westfall. 1/10/01 DAR This resubmittal made it possible to perform a UBC plan review. CJW
Plan resubmittals received  12/15/2000 DONE
Received two copies of revised sheet M1.0, P2.0 and P2.1. Routed to Carl W. KMM
Plan Reviewer's activity  12/13/2000  
Drawings were placed on HOLD. The plan review could not be done without information about the processes and quantities of hazardous materials present. A letter was sent to the architect. Until the required information is received, this project is on "hold".
Routing - PLUMBING11/30/2000 12/5/2000  
Failed first UPC review. All water piping to the lab, both hot and cold, shall be protected by an R.P. installed in accordance with the 1997 UPC, except the emergency shower which must be from the potable water supply. all water ouitlets associated with the lab shall be posted "CAUTION: NONPOTABLE WATER, DO NOT DRINK".
Routing - PLANNING12/5/2000 12/5/2000 PASS
Routing - PUBLIC WORKS11/28/2000 11/30/2000 PASS
Plan assigned to (MYS)11/28/200011/28/200011/28/2000 DONE
DetailsMarlene Southard
Application received  11/28/2000  
Recd Pcfee & Taken To Pln CK  11/28/2000 DONE
Plans ACCEPTED BY PLAN TECH  11/28/2000 DONE