Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03516
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 1160 E EXCHANGE ST
Project NamePCS3302
Customer NumberPCS3302
ePlanReviewNo
Description
Micron (PCS3302) Exchange Street Warehouse * To modify existing warehouse building to accommodate equipment assembly area, high-piled storage and additional office area. To construct a new 2,952 sq.ft. mezzanine for office use within the existing building and to construct a 3,060 sq.ft., one story loading dock addition per approved plans and attachmenets, DRH97-00095, DRH95-00148 and DRH00-00207 PC#1015 This building is fully fire sprinklered for area. Note: At time of review hazardous materials proposed for use and storage did not exceed the maximum allowables in UBC Tables 3-D and 3-E.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/1/20037/1/20037/1/2003 DONE
Permanent Occupancy 8/3/20018/3/2001 DONE
Details
BLD-Final8/2/20018/3/20018/3/2001APASS
DetailsJim Storey
###-#### final ok. 8/3/2001 10:41:18 AM
Permanent occupancy  8/3/2001 DONE
Perm. Occ. Cert. #8781 issued 8-3-01 to the Micron Exchange Street Warehouse.
BLD-Final6/27/20016/29/20016/29/2001APART
DetailsJim Storey
fn jack-- ###-#### pending others. 6/29/2001 11:22:08 AM
FIRE-Final Inspection6/29/20016/29/20016/29/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 6/29/2001 10:34:15 AM
Temporary occupancy  6/11/2001 PART
Temp. Occ. Cert. #4557 issued 6-11-01 to Micron Technology, Inc.
Code Occupancy Approval  6/11/2001 FAIL
ALL WORK WAS DONE INSIDE PER PERMIT, THEY DID MOVE SOME TREES AND ADDED PONDS SO I WILL ONLY SIGN TEMPORARY UNTILL TREES REPLACED AND PONDS FINISHED.
BLD-Final6/7/20016/8/20016/8/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/07/2001 at 09:29:18. Contact: ###-####.temp occ ok for all areas but the high pile s 6/8/2001 5:43:45 PM toage in center of bldg. copy of occ. card siged to be flled down town . 6/8/2001 5:45:20 PM
FIRE-Final Inspection6/7/20016/8/20016/8/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/07/2001 at 13:49:56. Contact: ###-####. exit signs not working 6/8/2001 2:02:05 PM
FIRE-Alarm Testing6/7/20016/8/20016/8/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/07/2001 at 13:54:28. Contact: ###-####. need 60 hr batteries; detectors installed per plans; repair strobe; c/n issued 6/8/2001 2:01:49 PM
BLD-Framing/Rough-in6/5/20016/6/20016/6/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/05/2001 at 13:50:17. Contact: ###-####. ceilling ok for cover. 6/6/2001 3:14:30 PM
BLD-Framing/Rough-in6/1/20016/4/20016/4/2001APART
DetailsJim Storey
###-#### conf for temp occ. fire isues/ all others need final and need racking permit. 6/4/2001 10:39:40 AM
FIRE-Conference6/1/20016/4/20016/4/2001APART
DetailsRick Jackson
###-#### talked with Micron, Jim Storey and GC about sprinkler issues with curtain boards and occupancy requirements 6/4/2001 10:31:05 AM
BLD-Framing/Rough-in5/7/20015/8/20015/8/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/07/2001 at 09:09:13. Contact: ###-####. walls ok for cover and roof deck welding approved. 5/8/2001 3:47:28 PM
BLD-Framing/Rough-in5/3/20015/4/20015/4/2001ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/03/2001 at 13:42:59. Contact: ###-####...need elec & eng's statement for roof deck welds. 5/4/2001 11:40:38 AM
BLD-Framing/Rough-in4/30/20015/1/20015/1/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/30/2001 at 10:52:47. Contact: ###-####.
BLD-Framing/Rough-in4/26/20014/27/20014/27/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/26/2001 at 10:37:03. Contact: ###-####. struc. engn. tim to submit puddle size and perimtor spacing. spoke with tim on phone. 4/27/2001 3:35:54 PM
BLD-Other4/17/20014/18/20014/18/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/17/2001 at 15:41:06. Contact: ###-####. welding conections requier special insp. 4/18/2001 3:43:00 PM
BLD-Concrete4/9/20014/10/20014/10/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/09/2001 at 13:38:10. Contact: ###-####. grout pour ok / no shrink grout ok pour back at mez ok for cover. 4/10/2001 3:27:32 PM
BLD-Footing4/6/20014/9/20014/9/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/06/2001 at 15:40:55. Contact: ###-####. mez. deck and struc ok for placement./dock levelers ok to pour / massonary in fills rebar epoy drill depth ok 4/9/2001 9:16:21 AM
BLD-Footing4/5/20014/6/20014/6/2001ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/05/2001 at 15:58:54. Contact: ###-####. jach called rained out. 4/6/2001 9:15:00 AM
BLD-Footing4/2/20014/3/20014/3/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/02/2001 at 15:24:47. Contact: ###-####. pending special insp. report. 4/3/2001 2:03:05 PM 4/3/2001 4:21:54 PM
BLD-Framing/Rough-in3/29/20013/30/20013/30/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/29/2001 at 14:52:04. Contact: ###-####. walls ok for cover f and b occ area. 3/30/2001 9:13:11 AM
BLD-Footing3/28/20013/29/20013/29/2001PPASS
DetailsJim Storey
###-####
Issue & PRINT to be Invoiced  3/27/2001 DONE
Plan assigned to (MLO)2/21/2001 3/23/2001 PASS
DetailsMike Otto
3/23/2001 14:23:43 MLO - activity updated through activity BLDA022 from case BLD00-03516.
Routing - PLAN CHECK3/21/2001 3/23/2001 PASS
information on products to be stored in warehouse not provided and still unlcear on hazmat in warehouse. Put in call to P. Marcolina and forwarded plans to fire. MLO
Routing - FIRE3/22/2001 3/23/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/23/2001 DONE
Inspection Record Card- Bld  3/23/2001 DONE
Print Occupancy Form  3/23/2001 DONE
Plan resubmittals received  3/21/2001 DONE
received fax from P. Marcolina with hazmat list requested in plan review comments
Plan resubmittals received  3/16/2001 DONE
Received three copies of reviesed sheets A6.0, FP.1, FP.2 AND A2.2. Routed to Mike O. KMM
Routing Off Site - STRUCTURAL3/14/2001 3/15/2001 PASS
resubmitted plans contacted pdq to sent to outside eng. 3/14/2001/pe
Plan resubmittals received  3/14/2001 DONE
Received three copies of G2 specifications, A3.1 Door schedule, S1.1 Foundation and Footing Plans, S1.3 Foundation sections and details, S2.1 Mezzanine Floor Framing plan, S2.2 Expansion roof framing plan. Two copies of calculations and one cover response letter. Routed all to Mike O. KMM
Plan resubmittals received  3/12/2001 DONE
RECEIVED EMAIL FROM TIM ERNEST REGARDING ONE ITEM ON STRUCTURAL CORRECTION LIST. FORWARDED QUESTION TO ENGINEER FOR RESPONSE. MLO
Plan Reviewer's activity  3/9/2001 DONE
had call from Richard Kizer architect and he said he did not reveive fax that was sent on 3-8-01 for structural corrections. corrections refaxed to ###-#### at 9:40 AM MLO
Plan Reviewer's activity  3/9/2001 DONE
faxed copy of structural review to P. Marcolina at Micron as requested. MLO
Plan resubmittals requested  3/8/2001 FAIL
structural corrections.
Plan resubmittals received  3/8/2001 DONE
received e-mail from architect with responses to corrections. MLO
Routing - PLAN CHECK3/8/2001 3/8/2001 FAIL
corrections not satisfied with resubmittal. List of unresolved items faxed and mailed to architect. MLO
Plan resubmittals requested  3/8/2001 FAIL
unresolved corrections from UBC review 3-6-01. MLO
Routing Off Site - STRUCTURAL2/22/2001 3/8/2001 FAIL
Contacted PDQ to take plans to outside eng. received fax from consultant. Corrections faxed and mailed to architect. MLO
Routing - FIRE3/6/20013/7/20013/7/2001 FAIL
DetailsBill Alexander
UFC and FD issues of hydrants, water supply verification, manual smoke heat venting.
Plan Review Completed(1st rev)  3/7/2001 FAIL
Plan resubmittals requested  3/6/2001 FAII
UBC corrections
Routing - PLAN CHECK3/1/2001 3/6/2001 FAIL
corrections faxed and mailed to architect. MLO
Routing - PLUMBING2/28/2001 3/1/2001 PASS
water piping in mezzanine to comply with 97 upc
Routing - PUBLIC WORKS2/21/2001 2/28/2001 PASS
Routing - PLANNING2/28/2001 2/28/2001 PASS
Approved per DRH00-207 for exterior work; e.g., loading dock.
Plans ACCEPTED BY PLAN TECH  2/21/2001 PEND
Paul brought in 1. Three extra civil sheets
2. Two soils reports.
Still requires 1. Material amount of items to be stored.
2. Seismic bracing for racking.
These items will be brought in to Mike Otto by Paul as soon as he receives them. KMM
Plan routing begun/NEW & ADDTN  2/21/2001 DONE
Still requires 1. Letter to Mike O. about storage items and amounts.
2. Seismic bracing information. KMM
Plan resubmittals received  2/16/2001  
Received three stamped and signed FP sheets
Plans ACCEPTED BY PLAN TECH  2/16/2001 HOLD
Received 1. Three stamped and signed FP sheets.
2. One extra specs. book.
3. One extra struct. calcs.
Requires. 1. Full size three extra civil sheets. Paul gave me small sheets. sheets.
2. Geotec. soils report.
3. Hazardous Questionaire and list of stroage items
4. Seismic bracing for racking.
Called Paul and discussed above items. KMM
Telephone call  1/16/2001 DONE
Refaxed Paul Marcolina Checklist of items required for routing of plans. KMM
Telephone call  12/27/2000 DONE
Contacted Paul Marcolina about information needed to start routing. He stated that he has been in touch with the Exchange Street Warehouse people to get things going and remind them that routing cannot start until items are received. KMM
Plan routing begun/NEW & ADDTN  12/5/2000 HOLD
Plans ACCEPTED BY PLAN TECH  12/5/2000 HOLD
Requires 1. FP sheets need to be signed
2. Requires one extra spec's book
3. Requires soils report. Stating pressure of 3,000psf
4. Requires three extra civil sheets.
5. Requires one extra calc's book
6. What are they storing. If hazardous high pile storage, questionnaire is required.
7. Requires Eng. calcs for racking FP sheets not signed, they have rack layout.
Contacted Jim Ward / Paul Marcolina of these needs.
Received Certificate of Value  12/4/2000 DONE
Application received  11/29/2000