Permit Information
Permit NumberBLD00-03519
StatusFinaled
Name RIVER WALK APARTMENTS
Site Address 1689 W SHORELINE Unit: DR
Project NameRIVER WALK APARTMENTS
Customer Number 
ePlanReviewNo
Description
River Walk Apartments Parking Garage * To construct a new 33,000 sq.ft Type IFr, S-3 parking garage under a post tensioned slab meeting the three hour occupancy separation requirements per UBC Section 311.2.2.1. and Section 311.9.2.2. is being used to meet the open parking garge requirements for exterior wall opening and travel distances. NOTE : This structure is required to have Standpipes per UBC Table 9-A. This project is located in the 100 year flood plain. Special inspection is required for concree, soil bearing, welding, and anchor bolts greater than A325. All construction per the approved plans and CABO/ANSI A117.1. DRH00-00161, PC# 1000-00 Grading permit # is BLD00-03479. MJP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permit Ready to Issue  8/21/2012 DONE
CHANGE STATUS TO (FNL)  8/21/2012 DONE
DetailsRita DeYoung
Case Summary (BLD)  8/21/2012  
BLD-Final7/17/20027/17/20027/17/2002APASS
DetailsCarl Dependahl
rec'd eng's affidavit..ok
Letter of compliance  7/17/2002 DONE
Letter of Compliance #22547 issued 7-17-02.
BLD-Final6/17/20026/18/20026/18/2002AFAIL
DetailsCarl Dependahl
need eng's clarification & add'l statements re MTI's affidavit. 6/18/2002 11:34:36 AM
BLD-Final6/17/20026/17/20026/17/2002PNR
DetailsCarl Dependahl
SCOTT ###-####
BLD-Final6/14/20026/14/20026/14/2002PNR
DetailsCarl Dependahl
scott ###-#### fn will recall 6/14/2002 5:19:33 PM
BLD-Final6/12/20026/13/20026/13/2002AFAIL
DetailsJim Storey
repair exit sign and move handrail in center stair to 34 to 38 inches . 6/13/2002 2:21:06 PM
Fee Review-notes11/30/200011/30/20001/29/2002 DONE
BLD-Final1/16/20021/17/20021/17/2002APART
DetailsCarl Dependahl
###-####, rec'd eng's final report, ok for t/o 1/17/2002 1:25:28 PM
Temporary occupancy  1/17/2002 PART
Temp. Occ. Cert. #4705 issued 1-17-02 to the River Walk Apts. parking structure.
FIRE-Final Inspection1/16/20021/16/20021/16/2002PPASS
DetailsRick Jackson
Added by Inspector: 409 On 1/16/2002 2:01:31 PM
BLD-Final1/14/20021/14/20021/14/2002PNR
DetailsCarl Dependahl
###-####, need engs report, all ok's 1/14/2002 6:06:08 PM
BLD-Final1/10/20021/10/20021/10/2002PCANC
DetailsRuss Owen
###-####
BLD-Aging Inspection12/10/200112/10/200112/11/2001 NR
DetailsCarl Dependahl
wip 12/11/2001 9:58:32 AM
BLD-Aging Inspection10/8/200110/8/200110/8/2001 NR
DetailsCarl Dependahl
apts...wip. 10/8/2001 10:46:28 AM
BLD-Aging Inspection8/7/20018/7/20018/7/2001 PASS
DetailsCarl Dependahl
wip 8/7/2001 9:28:27 AM
BLD-Conference6/7/20016/7/20016/7/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/7/2001 1:49:28 PM met w/ bldr onsite, need eng's report
BLD-Concrete5/25/20015/30/20015/30/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/25/2001 at 12:09:08. Contact: ###-####. covered with special insp. pending report. 5/30/2001 10:08:03 AM
BLD-Concrete5/23/20015/25/20015/25/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/23/2001 at 13:04:13. Contact: (208) p.t. deck###-####...pending spec insp reports; eng'r made site visit 5/25/2001 11:41:46 AM
BLD-Concrete5/17/20015/21/20015/21/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/17/2001 at 09:44:38. Contact: ###-####... PT slab...need eng's statement re plbg pipes, removed from col. caps 5/21/2001 2:27:59 PM
BLD-Conference5/17/20015/18/20015/17/2001APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/17/2001 at 09:43:38. Contact: ###-####.--cancel per scott kimball
BLD-Conference5/16/20015/16/20015/16/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 5/16/2001 4:58:05 PM need eng's ok for pipes in p.t. slab & column cap, verify steel laps as req'd for compression?
BLD-Conference5/16/20015/16/20015/16/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 5/16/2001 4:58:05 PM need eng's ok for pipes in p.t. slab & column cap, verify steel laps as req'd for compression?
BLD-Concrete4/27/20014/27/20014/27/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/27/2001 10:20:56 AM slab at grade, NE corner; conf w/ owner: need eng'r & spec insp's affidavits for pt slab..decking/shoring wip prior to pour..req'd meeting w/ eng'r 5-7-01
BLD-Concrete4/19/20014/20/20014/20/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/19/2001 at 19:20:56. Contact: ###-####. placed with special insp.pending report. 4/20/2001 3:28:27 PM
BLD-Concrete4/17/20014/18/20014/18/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/17/2001 at 11:43:59. Contact: ###-####. placed with special insp. pending report. 4/18/2001 2:45:16 PM
BLD-Foundation4/12/20014/12/20014/12/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/12/2001 at 08:47:57. Contact: ###-####. pend report, walls. 4/12/2001 5:11:49 PM
BLD-Conference4/2/20014/2/20014/2/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/2/2001 6:28:43 PM w/ Gary Z. re plbg c/n.
Plan resubmittals received  4/2/2001 DONE
Received two sets of plan resubmittals from John Price, sheets P1.0, P2.0, forwarded same to Lee Rice. 4/2/01 DAR
BLD-Foundation3/29/20013/30/20013/30/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/29/2001 at 12:31:14. Contact: ###-####. placed with special insp. pending report. 3/30/2001 1:47:22 PM
Plan resubmittals received  3/29/2001 DONE
Received three copies of revised sheets C1.0, P1.0, P2.0 and one copy of cover letter. Routed to Gary Ziegler. KMM
BLD-Footing3/26/20013/27/20013/27/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/26/2001 at 11:51:43. Contact: ###-####. wip mti on site 3/27/2001 9:53:17 AM
BLD-Footing3/22/20013/23/20013/23/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/22/2001 at 17:39:34. Contact: ###-####. col's; requested eng'r observe & report re p.t. deck, & overall for concrete (as designed ) deck is also 3hr occ sep. 3/23/2001 9:42:47 AM
BLD-Footing3/21/20013/22/20013/22/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/21/2001 at 17:07:53. Contact: ###-####...cols; met w/ contractor & spec insp onsite. pend report 3/22/2001 3:25:48 PM
Plan resubmittals received  3/22/2001 DONE
Received two copies of revised plans C1.0, A2.0, A3.0.1 and A3.0.2. Attached are a revised site plan and garage plans showing the garage floor draining to a sand and grease trap that is tied to the sanitary sewer. Routed to Carl D. KMM
BLD-Footing3/20/20013/21/20013/21/2001APART
DetailsJim Storey
###-#### placed with special insp. pending report. 3/21/2001 4:33:49 PM
BLD-Conference3/19/20013/19/20013/19/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/19/2001 4:41:29 PM rec'd eng'g resub...called arch John Price; need insps for concrete. called bldr, has had mti onsite, need to request city insps
Plan resubmittals received  2/27/2001 DONE
Received two copies of revised sheets S1.1 & S1.2. Routed to Mike P. KMM
BLD-Footing2/22/20012/23/20012/23/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/22/2001 at 15:23:14. Contact: ###-####. ftgs; pend spec. insp. reports 2/23/2001 12:45:24 PM
(F) Reprint permit  2/20/2001 DONE
BLD-Footing2/16/20012/16/20012/16/2001PPART
DetailsTom Arcoraci
pouring at 12:00 as per bob a. put in inspection for footing Scott ###-#### wip 2/20/2001 9:58:19 AM
Plan Reviewer's activity  2/16/2001 PASS
Approved for foundation only.
PLANS/APPL TAKEN TO FRONT DESK  2/16/2001 DONE
Inspection Record Card- Bld  2/16/2001 DONE
Print Occupancy Form  2/16/2001 DONE
Issue PAID IN FULL permit  2/16/2001 DONE
Plan assigned to (M_P)11/30/2000 2/16/2001 PASS
DetailsMike Phillips
2/16/2001 09:42:53 M_P - activity updated through activity BLDA022 from case BLD00-03519.
CHANGE ISSUED DATE  2/16/2001  
Telephone call  2/7/2001 FAIL
Need to discuss exits on second and thierd floors.
Routing Off Site - STRUCTURAL1/17/2001 2/6/2001 PASS
contacted PDQ to take revised plans from 1/16/01 to outside eng. John stated that there are no revised struct. calcs. at this time. KMM
Plan resubmittals received  2/2/2001 DONE
Received two copies of sheets A1.0 from Susan Riggs who is reviewing plans now. She put the resubs with plans.KMM
Plan resubmittals received  2/2/2001  
2 copys revised sheet s5 took to mike phillips/pe
Routing - PLANNING1/31/2001 2/2/2001 PASS
Approved per DRH00-161 for structure only. Revised landscape plan per DR conditions must be submitted for Staff review and approval.
Plan resubmittals received  2/1/2001 DONE
Received plan resubmittals from Tamura and associates, John Price, Two sets of sheets of S1.1 and S1.2, forwarded same to Mike Phillips. 2/1/01 DAR
Routing - PUBLIC WORKS1/26/2001 1/31/2001 PASS
Plan Review Completed(1st rev)  1/26/2001 PEND
Routing - FIRE1/22/2001 1/26/2001 PASS
Route back to PW when out of fire. KMM
Routing - PLAN CHECK1/5/2001 1/22/2001  
Routing to fire.
Plan Reviewer's activity  1/22/2001 PEND
Waiting for others to approve prior to issuance of permit.
Plan resubmittals received  1/16/2001 DONE
Received two copies of revised sheets A0.0, S1,S2, S4, S5, S6. S0.1, S1.1, S1.2. Two copies of response to structural review. Contacted John Price requesting an additional set of these revised sheets for outside eng. Mike also wanted me to inquire about revised calculations. Will route one copy of revised sheets to outside eng. after I hear from John about the calcs. The other set was routed to Mike P. When third set comes in I will route to Mike P. to complete the in-house set. 1/16/01 PM received third set of revised plans from John Price. Routed to Mike P. John also stated that struct. had not been revised. KMM
Routing - PUBLIC WORKS1/4/2001 1/5/2001 FAIL
Requires drainage plan revisions per Brian M. KMM
Routing - PLAN CHECK12/27/2000 1/4/2001  
Routing Off Site - STRUCTURAL11/30/2000 1/4/2001 FAIL
Sent comments to architect, additional informaiton required for further review.
Routing - PLUMBING12/21/2000 12/27/2000 PASS
Routing - PLANNING12/4/2000 12/20/2000 FAIL
Route to PW when back from planning. April ready to sign off. KMM

Plans do not comply with Design Review conditions, specifically proposed trees, and plant material not identified on site plan.
Routing - PUBLIC WORKS11/30/2000 12/4/2000 FAIL
Requires drainage plan revision and O AND M plan, Requires proof of legal land division,sewer problems. 12/4/00 DAR
Plan routing begun/NEW & ADDTN  11/30/2000 DONE
Plans ACCEPTED BY PLAN TECH  11/30/2000 DONE
Received Certificate of Value  11/30/2000 DONE
Application received  11/30/2000  
Recd Pcfee & Taken To Pln CK  11/30/2000 DONE
Routing - PLAN CHECK2/5/2001