Permit Information
Permit NumberBLD00-03538
StatusFinaled
Name ADA COUNTY
Site Address 190 E FRONT ST
Project NameCOURTHOUSE-PARKING GARAGE
Customer Number 
ePlanReviewNo
Description
CIVIC PLAZA PUBLIC PARKING GARAGE- TO CONSTRUCT A NEW 109,660 SQ. FT., THREE TIER PARKING GARAGE WITH A 41,600 SQ. FT., BASEMENT. THIS PARKING GARAGE WILL HAVE 432 TOTAL PARKING SPACES. THIS BUILDING INCLUDES A 20,225 SQ. FT. AREA AT THE SOUTH SIDE OF THE GROUND LEVEL, THAT IS BEING CONSTUCTED AS A SHELL AREA FOR FUTURE FINISH AS RETAIL TENANT SPACE. THIS GARAGE IS BEING CONSTUCTED AS A POST TENSION CONCRETE STRUCTURE. THIS BUILDING IS FULLY FIRE SPRINKLED. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THE RETAIL SPACES FOR OCCUPANCY. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS BUILDING IS BEING CONSTRUCTED WITH A STRUCTURAL SUPPORT DECK FOR A POSSIBLE FUTURE EXPANSION. DRH00-00164/PC#1011-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  3/18/2002 DONE
Letter of Compliance #22311 issued 3-18-02.
BLD-Final3/15/20023/15/20023/15/2002APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/15/2002 9:48:54 AM Note: structural final is approved...ext landscape & paving deferred (ok'd by P&Z; "Roof"(3hr occupancy separation )firestops to be installed and protected from subsquent apt. construction atop parking structure.
BLD-Final3/13/20023/14/20023/14/2002ACANC
DetailsCarl Dependahl
###-#### MEL resched. per contractor. 3/14/2002 11:22:56 AM
BLD-Final3/14/20023/14/20023/14/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/14/2002 11:17:22 AM ###-####
BLD-Conference3/12/20023/13/20023/13/2002APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/12/2002 3:42:06 PM Mel ###-#### w/ Mike Phillips re future apts above.. 3hr .expansion joint firestop assy req'd, (by MK or apt. contractor?) 3/13/2002 3:49:27 PM
Override - Parcel Holds  3/13/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
BLD-Conference3/11/20023/12/20023/12/2002APASS
DetailsCarl Dependahl
###-#### MEL
Override - Parcel Holds  3/11/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
BLD-Conference3/7/20023/8/20023/8/2002APASS
DetailsCarl Dependahl
jack ###-#### for conf; glazing assy ok w/ 1" max sealant 3/8/2002 3:55:56 PM
BLD-Conference3/7/20023/7/20023/7/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/7/2002 3:08:30 PM w/ John Resseigh,CHSQA: 1" max. space for sealants (FD150,3M) at 2hr windows at shaft ok per Technical Glass Products.
Override - Parcel Holds  3/7/2002  
BLD-Conference3/5/20023/5/20023/5/2002APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/5/2002 9:34:52 AM W/ glazer, need specific info re fire sealant...send fax
BLD-Conference2/26/20022/26/20022/26/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/26/2002 9:35:44 AM w/ Tom Basel, Comm'l Glass...still need listing for firestop annular space at fire windows
(F) Reprint permit  2/14/2002 DONE
(F) Reprint permit  2/12/2002 DONE
BLD-Final2/11/20022/11/20022/11/2002PFAIL
DetailsCarl Dependahl
fn =jack- ###-#### ...keep c/n 2/11/2002 5:14:03 PM
BLD-Final2/8/20022/11/20022/11/2002AFAIL
DetailsCarl Dependahl
###-#### JACK need masonry ok & glazing/firestop specs 2/11/2002 12:38:54 PM
Override - Parcel Holds  2/11/2002  
Override - Parcel Holds  2/8/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
Fee Review-notes12/1/200012/1/20002/5/2002 DONE
final certs
BLD-Conference1/30/20021/30/20021/30/2002APART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/30/2002 11:51:23 AM w/ Jack/ mcalvaine...awaiting eng's report re masonry reports/approval
BLD-Other1/28/20021/28/20021/28/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/28/2002 12:38:58 PM ext glazing system "fix" installed ok
BLD-Final1/24/20021/25/20021/25/2002PPART
DetailsCarl Dependahl
###-####; rec'd engs spec for glazing frames, wip; rec'd eng's ok for guards...stamped; keep c/n, ok for t/o. 1/25/2002 4:09:13 PM
BLD-Final1/23/20021/24/20021/24/2002ANR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/23/2002 6:14:44 PM mel ###-#### 9-10 am keep c/n, need stamped letters, gla 1/24/2002 12:00:10 PM zing issues 1/24/2002 12:00:26 PM
Code Occupancy Approval1/24/20021/24/20021/24/2002APASS
DetailsWm. Michael Meloy
Scheduled by Inspector: WMM On 1/24/2002 10:18:13 AM Inspection noted completion of all items, except the proponed ones. Staffed with Tempra Wilson who said OK to final. Incompleted items are covered by other CUP's. 1/24/2002 1:59:58 PM
BLD-Final1/24/20021/24/20021/24/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/24/2002 11:58:16 AM ###-####...keep c/n re gla 1/24/2002 5:09:28 PM zing & engs approval letters 1/24/2002 5:10:02 PM
Override - Parcel Holds  1/24/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
Override - Parcel Holds  1/24/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
BLD-Conference1/22/20021/23/20021/23/2002APASS
DetailsCarl Dependahl
###-#### mel...keep c/n, need all signatures and eng's, arch's reports. 1/24/2002 9:43:24 AM
Override - Parcel Holds  1/22/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide: only conf.
Override - Parcel Holds  1/22/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
BLD-Conference1/17/20021/17/20021/17/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/17/2002 3:53:13 PM w/ John Rose' of chsqa re c/n...will have glazing attachment checked; pursue prior corrections, verify door ratings
BLD-Conference1/16/20021/16/20021/16/2002PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 1/16/2002 12:23:35 PM c/n issued, need affidavit, complete all corretions, do not conceal w/ o reinsp
BLD-Final1/14/20021/14/20021/14/2002PFAIL
DetailsCarl Dependahl
###-####, need all other oks...eng's final reports, etc. 1/14/2002 2:14:19 PM
Override - Parcel Holds  1/14/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a final occupancy permit the parking structure to the east shall be completed. Per Tempra K. Wilson X3836. (11/21/2001-Carol Cherry) Reason for OverRide:
FIRE-Final Inspection1/11/20021/11/20021/11/2002PPASS
DetailsRick Jackson
JACK ###-####
BLD-Framing/Rough-in1/11/20021/11/20021/11/2002PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 1/11/2002 5:09:34 PM need manuf's attachment schedule for glazing walls at elevator lobbies
BLD-Final1/8/20021/10/20021/10/2002PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/08/2002 at 12:52:37. Contact: ###-####. fire failled left phone measage to have contractor to call back if insp. was needed. no call returned at end of work day. 1/10/2002 4:42:41 PM
FIRE-Final Inspection1/10/20021/10/20021/10/2002PFAIL
DetailsRick Jackson
Scheduled by Inspector: 409 On 1/10/2002 12:04:13 PM c/n issued; exit signs; sprinkler head with tape on it; stairs cleaned of scaffolding etc. 1/10/2002 12:08:17 PM
BLD-Final1/3/20021/3/20021/3/2002PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/03/2002 at 10:39:10. Contact: ###-####....keep c/n, need fire ok, too. 1/3/2002 6:16:22 PM
BLD-Final12/28/20011/2/20021/2/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/28/2001 at 14:29:01. Contact: ###-####. c/n, need eng's report for struct & cable rails, attachment for exterior glazing, seal enclosure for stairs,firestops, fire & other insps. 1/3/2002 8:08:22 AM
BLD-Framing/Rough-in12/28/200112/31/200112/31/2001ACANC
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 5:41:51 PM Mike
BLD-Framing/Rough-in12/28/200112/31/200112/31/2001ACANC
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 5:41:51 PM Mike
BLD-Framing/Rough-in12/28/200112/31/200112/31/2001AFAIL
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 5:41:51 PM Mike; keep c/n, complete elev/stair enclosures, show eng's ok for p.t. decks, etc. 12/31/2001 5:43:05 PM
BLD-Framing/Rough-in12/28/200112/31/200112/31/2001ACANC
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 5:41:51 PM Mike
BLD-Conference12/28/200112/28/200112/28/2001PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
BLD-Conference12/28/200112/28/200112/28/2001PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
BLD-Conference12/28/200112/28/200112/28/2001PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
BLD-Conference12/28/200112/28/200112/28/2001PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
BLD-Conference12/28/200112/28/200112/28/2001PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/28/2001 10:20:20 AM w/ state elev insp...no temp occ 12/28/2001 5:39:49 PM
BLD-Framing/Rough-in12/20/200112/21/200112/21/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/20/2001 at 08:19:37. Contact: ###-####....see c/n, need eng's letter/ok 12/21/2001 11:58:25 AM
BLD-Final12/20/200112/21/200112/21/2001ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/20/2001 at 08:20:37. Contact: ###-####.
BLD-Framing/Rough-in12/21/200112/21/200112/21/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/21/2001 7:01:47 PM c/n issued, complete stair shafts, rails, glazing, rec'd const. joint firestop info, will review...need spec. insp/eng's reports.
BLD-Conference12/11/200112/11/200112/11/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/11/2001 9:44:03 AM w/ John R.(?) arch w/ CHSQA re occ sep...1hr sep preferred/ req'd w/ shell as office tenant(McAlvaine) wants temp occ...
BLD-Framing/Rough-in12/11/200112/11/200112/11/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/11/2001 at 09:40:36. Contact: ###-####...wip, need wrap beams at upper level, ok to infill deck, seal shafts 12/11/2001 6:24:17 PM
Additional plans submitted  12/5/2001 DONE
Received two copies of additional plans sheets SNE-1 (northeast corner details). Routed to Carl D. kmm
BLD-Conference11/27/200111/27/200111/27/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/27/2001 11:13:18 AM need specs for expansion joint & firestops at occ. sep.
BLD-Framing/Rough-in11/19/200111/19/200111/19/2001PPART
DetailsDave Hannah
###-#### MIKE crew has installed ultra block first part of a two part systm on east stair tower basement to second floor and west stair tower basement to third floor ok to cover with culking the second part 11/19/2001 3:58:07 PM
Override - Parcel Holds  11/19/2001 DONE
DetailsDarla L Downs
Parcel Tag Notes: Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836. Reason for OverRide: JUST FOR AN INSPECTION
BLD-Concrete11/15/200111/16/200111/16/2001PPART
DetailsCarl Dependahl
mike- ###-#### concrete; last segment, upper floor deck pending spec insp re 11/16/2001 5:37:24 PM
BLD-Framing/Rough-in11/15/200111/16/200111/16/2001APART
DetailsCarl Dependahl
fire proofing insp--mike ###-####...ultra bond safing installed at stairs, need sealants & expansion joint firestop at occ. sep. 11/16/2001 5:35:25 PM
BLD-Concrete11/9/200111/9/200111/9/2001PPART
DetailsCarl Dependahl
###-#### pt deck, pend reports. 11/9/2001 4:36:59 PM
BLD-Footing11/9/200111/9/200111/9/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/9/2001 4:36:33 PM w/ arch and Robin Carnes at site re stair enclosure...no extra penetrations allowed; provide 2hr assy for hydraulic line.
BLD-Concrete10/29/200111/2/200111/2/2001PPART
DetailsRuss Owen
###-#### MIKE s-i required pending rep. 11/2/2001 12:23:14 PM
BLD-Framing/Rough-in10/31/200111/2/200111/2/2001ANR
DetailsRuss Owen
###-#### MIKE REBAR
BLD-Wall cover11/1/200111/2/200111/2/2001ANR
DetailsRuss Owen
Scheduled by Inspector: 407 On 11/1/2001 5:13:48 PM
BLD-Energy code compliance10/31/200111/1/200111/1/2001ACANC
DetailsRuss Owen
###-#### MIKE
Override - Parcel Holds  10/31/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836.
BLD-Concrete10/29/200110/30/200110/30/2001APART
DetailsRuss Owen
###-#### MIKE . Pending mti report. 10/31/2001 9:08:47 AM
Override - Parcel Holds  10/29/2001 DONE
DetailsDarla L Downs
Parcel Tag Notes: Prior to issuance of a temporary or final occupancy permit for the first tenant, the parking structure shall be completed. Per Tempra K. Wilson X3836.
BLD-Concrete10/17/200110/19/200110/19/2001PPART
DetailsCarl Dependahl
mike-- ###-#### concrete ; 10/19/2001 4:40:40 PM
BLD-Concrete10/17/200110/17/200110/17/2001PPART
DetailsCarl Dependahl
concrete ###-#### - mike upper pt deck...pend mti report 10/17/2001 4:08:04 PM
Override - Parcel Holds  10/17/2001  
Override - Parcel Holds  10/17/2001  
BLD-Concrete10/9/200110/12/200110/12/2001PPART
DetailsCarl Dependahl
###-#### MIKE cols' & p.t. deck pend mti report 10/12/2001 4:01:30 PM
BLD-Concrete10/9/200110/11/200110/11/2001PPART
DetailsJim Storey
###-#### MIKE covered with special insp reports pending 10/11/2001 2:58:52 PM
BLD-Concrete10/9/200110/10/200110/10/2001PPART
DetailsCarl Dependahl
###-#### MIKE...cols at upper deck, pend report 10/10/2001 2:55:12 PM
BLD-Concrete10/10/200110/10/200110/10/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/10/2001 9:07:00 AM west end, upper deck & col's ok pend MTI reports...met onsite w/supt.
Override - Parcel Holds  10/9/2001 DONE
DetailsDarla L Downs
Parcel Tag Notes: Do not issue permits for CUP01-120. The appeal period ends 10/11/01 @5:00pm. Questions call Dave 3743 or Carol 3838.
BLD-Concrete10/3/200110/5/200110/5/2001PPART
DetailsCarl Dependahl
###-####
BLD-Concrete10/3/200110/4/200110/4/2001APART
DetailsCarl Dependahl
###-####...c/n issued re spec insp for masonry...ok pend report 10/4/2001 12:14:31 PM
Override - Parcel Holds  10/3/2001  
Override - Parcel Holds  10/3/2001  
BLD-Concrete9/28/200110/1/200110/1/2001APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 9/28/2001 4:41:20 PM partial, panel 11, pend report 10/1/2001 5:03:53 PM
BLD-Concrete9/28/200110/1/200110/1/2001PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 9/28/2001 5:10:15 PM pt deck panel 11, pend report 10/1/2001 6:21:27 PM
BLD-Concrete9/25/20019/28/20019/28/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/25/2001 at 17:35:13. Contact: ###-####. parking struct. p 9/28/2001 5:10:50 PM end report 9/28/2001 5:11:02 PM
BLD-Concrete9/25/20019/27/20019/27/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/25/2001 at 17:34:18. Contact: ###-####.pend insp report 9/27/2001 2:50:21 PM
BLD-Concrete9/25/20019/26/20019/26/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/25/2001 at 17:33:26. Contact: ###-####. mcalvaine at parking struct; pt deck under spec insp...masonry? 9/26/2001 3:33:21 PM
BLD-Conference9/21/20019/21/20019/21/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/21/2001 5:50:49 PM w/ supt.need verify spec insps/engs ok for pt deck & masonry
BLD-Conference8/21/20018/21/20018/21/2001PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 8/21/2001 9:46:14 AM mel ###-####; walk thru; pt deck pend SI report & eng's ok. 8/21/2001 4:35:52 PM
BLD-Concrete8/14/20018/15/20018/15/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/14/2001 at 12:39:03. Contact: ###-####....wip, p.t deck ok pend spec insp report. 8/15/2001 2:54:55 PM
BLD-Concrete7/23/20017/25/20017/25/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/23/2001 at 11:10:48. Contact: ###-####. placed w/si pending report. 7/25/2001 4:32:54 PM
BLD-Concrete7/23/20017/24/20017/24/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/23/2001 at 11:09:56. Contact: ###-####. first floor pan deck and one column nw corner 7/24/2001 12:03:10 PM
BLD-Concrete7/3/20017/5/20017/5/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/03/2001 at 07:44:06. Contact: ###-####. placed with special insp, pending report 7/5/2001 10:33:29 AM. 7/5/2001 10:33:32 AM
BLD-Concrete6/7/20016/7/20016/7/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/7/2001 4:36:37 PM pt deck, need 2nd mat steel, wip
BLD-Concrete6/4/20016/5/20016/5/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/04/2001 at 15:56:51. Contact: ###-####...p.t deck center portion, looks ok. pending MTI report 6/5/2001 1:33:52 PM
BLD-Concrete5/31/20015/31/20015/31/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/31/2001 at 07:55:39. Contact: ###-####...1st deck, west 1/2...P.T. tendons, bar in place, appears ok pending spec. insp's report... consulted w/ Robin re rfi's 5/31/2001 3:40:36 PM
BLD-Concrete5/10/20015/14/20015/14/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/10/2001 at 10:59:39. Contact: . col's, walls, pending report. 5/14/2001 11:40:47 AM
BLD-Concrete5/10/20015/11/20015/11/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/10/2001 at 10:58:51. Contact: .pending insp report 5/11/2001 2:55:22 PM
BLD-Concrete5/10/20015/10/20015/10/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/10/2001 4:17:31 PM COL'S, PEND SPEC INSP REPORT
BLD-Concrete5/10/20015/10/20015/10/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/10/2001 at 10:58:09. Contact: .pend mti reports 5/11/2001 10:21:56 AM
BLD-Concrete5/3/20015/3/20015/3/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/3/2001 2:00:17 PM col's at S.E. corner...appear ok, pending insp reports.
BLD-Concrete4/30/20014/30/20014/30/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/30/2001 4:21:00 PM Wip; PEND REPORTS; walls to deck...2hr req'd...looks ok
BLD-Concrete4/12/20014/18/20014/23/2001PPART
DetailsCarl Dependahl
###-#### MIKE wip...pend reports 4/23/2001 10:55:23 AM
BLD-Concrete4/12/20014/20/20014/20/2001PPART
DetailsJim Storey
MIKE ###-#### placed with special insp.pending report. 4/20/2001 3:21:24 PM
BLD-Concrete4/12/20014/19/20014/19/2001PPART
DetailsJim Storey
MIKE ###-#### pws pending report. 4/19/2001 3:01:23 PM
BLD-Concrete4/12/20014/17/20014/17/2001PPART
DetailsCarl Dependahl
MIKE ###-####; cols, wall ok pend report 4/17/2001 5:37:07 PM
BLD-Concrete4/12/20014/16/20014/16/2001PPART
DetailsCarl Dependahl
MIKE ###-####; walls 1st level. cols all E-W gridlines WIP, appears ok pend spec insp reports 4/16/2001 4:37:37 PM
BLD-Concrete4/12/20014/13/20014/13/2001PPART
DetailsCarl Dependahl
MIKE ###-####...wip, pend insp report 4/13/2001 2:30:53 PM
BLD-Concrete4/12/20014/12/20014/12/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/12/2001 9:16:24 AM pend report; call all insps
BLD-Concrete4/12/20014/12/20014/12/2001PPART
DetailsCarl Dependahl
MIKE ###-####; pend spec insp report. 4/12/2001 6:13:57 PM
BLD-Concrete4/9/20014/9/20014/9/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/9/2001 6:20:11 PM WIP, col's & ftg's
BLD-Conference4/4/20014/4/20014/4/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/4/2001 11:47:00 AM w/ Proj. mgr Bob Gridley & Robin Carnes; fnd insps under spec insp Mike Spiker w/ MTI
BLD-Concrete3/26/20013/29/20013/29/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/26/2001 at 16:31:25. Contact: ###-####. wip 3/29/2001 1:40:36 PM
BLD-Concrete3/26/20013/28/20013/28/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/26/2001 at 16:30:30. Contact: ###-####. placed w/specia insp. pendingreport. 3/28/2001 2:14:34 PM
BLD-Concrete3/26/20013/27/20013/27/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/26/2001 at 16:29:41. Contact: ###-####. wip spec insp 3/27/2001 1:45:15 PM
BLD-Footing3/23/20013/23/20013/23/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/23/2001 8:27:07 AM north slope shot-creted to prevent sluff...ok non struct. per supt. WIP on north ftgs, mti onsite
BLD-Footing3/19/20013/20/20013/20/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/19/2001 at 15:04:58. Contact: ###-####.
BLD-Footing3/15/20013/16/20013/16/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/15/2001 at 16:34:27. Contact: ###-####.pend insp report 3/16/2001 3:42:39 PM
BLD-Footing3/13/20013/14/20013/14/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/13/2001 at 14:09:55. Contact: ###-####. placed with special insp. pending report. 3/14/2001 9:37:54 AM
BLD-Footing3/7/20013/9/20013/9/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/07/2001 at 13:08:13. Contact: ###-####. B & K ftgs at west 1/2 south wall line 3/9/2001 12:43:04 PM
(F) Reprint permit  3/7/2001 DONE
Print Occupancy Form  3/6/2001 DONE
Inspection Record Card- Bld  3/6/2001 DONE
Telephone call  3/6/2001 DONE
called permit ready and need ACHD
Issue PAID IN FULL permit  3/6/2001 DONE
Routing Off Site - STRUCTURAL2/22/2001 3/5/2001 PASS
Received an e-mail from the consulting engineer approving the final resubmitted structural plan sheets. JCM
Plan Reviewer's activity  3/5/2001 PASS
Fianl resubmitted revisions have been reviewed and approved. There is an alternate letter that is being submitted later as a deferred submittal. JCM
PLANS/APPL TAKEN TO FRONT DESK  3/5/2001 PASS
Plan assigned to (JCM)12/4/2000 3/5/2001 PASS
DetailsJohn Menard
3/5/01 16:26:33 JCM - activity updated through activity BLDA022 from case BLD00-03538.
Routing Off Site - STRUCTURAL2/22/2001 2/22/2001 DONE
Routed resubmitted plans of 2/21/01 to outside eng. KMM
Plan resubmittals received  2/21/2001 DONE
Received two copies of revised drawings- Architectural, civil, structural & electrical.
One copy of response letter and attachment from Carl Walker. One copy of response letter from CSHQA structural engineer.
Requires additional copy of resubmitted plans. Contacted John Reseigh at ###-####, of this need. John will come in and get a set to make copies. KMM
2/22/01 Received additional copy of plans. Routed both to John M. KMM
Plan resubmittals received  2/14/2001 DONE
Received a copy of proposal for handling any temporary ground water from the Civic Plaza Parking Garage excavation. Routed to Brian M. and put copy with plans. KMM
Plan Reviewer's activity  2/9/2001  
E-mailed the architect to advise him that all of the required responses to the structural comment list had not been submitted and requested the submittal of the outstanding items. JCM
Routing - FIRE2/6/2001 2/9/2001 PASS
Plan resubmittals received  2/6/2001 DONE
Received one copy of ACI Report #423.3R-96 in response to number 30 of the review comments. Routed to John M. KMM
Plan resubmittals requested  2/6/2001  
Mailed the architect of record a letter requesting additional revisions. JCM
Routing - PLAN CHECK12/27/2000 2/6/2001  
Plan resubmittals received  2/5/2001 DONE
Received plan resubmittals from CSHQA two sets and small documents, forwarded same to John Menard. 2/5/01 DAR
Routing Off Site - STRUCTURAL2/5/2001 2/5/2001  
sent resubs to consultanting structural engineer via PDQ. 2/5/01 DAR
Plan resubmittals received  2/5/2001 DONE
Received plan resubmittals from CSHQA , forwarded same to John Menard. 2/5/01 DAR
Plan resubmittals requested  1/5/2001  
Faxed the architect of record a copy of the comment list from the consulting engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL12/5/2000 1/3/2001 FAIL
contacted PDQ to take plans to outside eng. KMM Received comment list from the consulting structural engineer requesting revisions. JCM
Routing - FIRE12/19/200012/22/200012/27/2000 FAIL
DetailsBill Alexander
12/20/00 Fed exed plans to Floyd. KMM 12/27/00 Received plans back from Floyd and routed to Fire. KMM

Lack fire department access and roof access.
Plan Review Completed(1st rev)  12/27/2000 FAIL
DetailsBill Alexander
Routing - PLAN CHECK12/13/2000 12/19/2000  
Plan resubmittals requested  12/19/2000  
MAILED THE ARCHITECT OF RECORD A COPY OF THE COMMENT LIST REQUESTING REVISIONS. JCM
Routing - PLUMBING12/12/2000 12/13/2000 PASS
secure approval from electrical inspector for pumped discharge piping in electrical room, provide a vent downstream of interceptor discharge diptube, donot tie to any interceptor vapor vent, foundation drainage piping within the perimeter of the building shall be installed by a licensed plumbing contractor.
Routing - PLANNING12/11/2000 12/12/2000 PASS
Approve per DRH00-164.
Routing - PUBLIC WORKS12/4/2000 12/11/2000 PASS
Plans ACCEPTED BY PLAN TECH  12/4/2000 DONE
Received Certificate of Value  12/4/2000 DONE
Plan routing begun/NEW & ADDTN  12/4/2000 DONE
Application received  12/1/2000  
Recd Pcfee & Taken To Pln CK  12/1/2000 DONE