FIRE-Final Inspection | 8/31/2001 | 9/4/2001 | 9/4/2001 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 15:01:42. Contact: ###-####.
|
BLD-Final | 8/31/2001 | 9/4/2001 | 9/4/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 15:03:45. Contact: ###-####.
c of c issued 9/4/2001 10:56:36 AM
|
DOC - Permit Finaled | 9/4/2001 | 9/4/2001 | 9/4/2001 | A | PASS |
Tony Young
|
|
|
Finaled by inspector at 9/4/2001 10:56:48 AM
|
BLD-Grading Inspection | 8/30/2001 | 8/30/2001 | 8/30/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage complete according to approved plan.
|
BLD-Final | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | NR |
Tony Young
|
|
|
fn occ doug- ###-####
|
BLD-Energy code compliance | 3/23/2001 | 3/26/2001 | 3/26/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/23/2001 at 14:52:56. Contact: ###-####.
c/n ok, still need to see sheet rock shear 3/26/2001 10:03:13 AM
|
BLD-Framing/Rough-in | 3/21/2001 | 3/22/2001 | 3/22/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/21/2001 at 14:50:09. Contact: ###-####.ok to insulate c/n on site 3/22/2001 4:16:39 PM
|
BLD-Wall cover | 3/20/2001 | 3/21/2001 | 3/21/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 14:57:44. Contact: ###-####. shear nailing ok to cover ext walls 3/21/2001 11:39:31 AM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 22:21:04. Contact: .
2/21/2001 2:25:43 PM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 11:08:21. Contact: ###-####.
|
BLD-Foundation | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 12/27/2000 10:14:03 AM
wip 12/28/2000 9:50:59 AM
|
BLD-Foundation | 12/22/2000 | 12/27/2000 | 12/27/2000 | A | PART |
Tony Young
|
|
|
BOB ###-#### FOUN WALL
soil rpt. ok, wip 12/27/2000 10:09:46 AM
|
BLD-Footing | 12/26/2000 | 12/27/2000 | 12/27/2000 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Footing | 12/26/2000 | 12/27/2000 | 12/27/2000 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Footing | 12/22/2000 | 12/26/2000 | 12/26/2000 | P | NR |
Tony Young
|
|
|
BOB ###-#### FT
12/26/2000 1:39:53 PM
|
Plan assigned to (DJO) | 12/12/2000 | 12/12/2000 | 12/21/2000 | | PASS |
Dan Overy
|
|
|
12/21/2000 09:32:02 DJO - activity updated through activity BLDA022 from case BLD00-03541.
|
Plan assigned to (DJO) | 12/12/2000 | 12/12/2000 | 12/21/2000 | | PASS |
Dan Overy
|
|
|
12/21/2000 09:32:02 DJO - activity updated through activity BLDA022 from case BLD00-03541.
|
Plan Reviewer's activity | | | 12/21/2000 | | DONE |
|
|
|
ok to issue per terry records.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/21/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/21/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 12/20/2000 | | PEND |
|
|
|
12-20-2000 plans still have missing bearing issues. have talked with dakota design and will red-line additional footing pads. will issue permit when soils issues are ok. terry records is checking out site.
|
Plan Reviewer's activity | | | 12/19/2000 | | PEND |
|
|
|
12-19-2000 received revision sheets and will incorporate into plans
|
Plan Reviewer's activity | | | 12/14/2000 | | PEND |
|
|
|
fax received from lee harrison addressing concrete design and tall walls. 12-14-2000. will issue permit when revised plans are received from dakota design
|
Case Summary (BLD) | | | 12/14/2000 | | PEND |
|
|
|
|
Plan Review Report | | | 12/14/2000 | | PEND |
|
|
|
|
Pending Assignment by DJO | 12/1/2000 | | 12/14/2000 | | PEND |
Dan Overy
|
|
|
12/14/2000 09:50:11 DJO - activity updated through activity BLDA169 from case BLD00-03541.
|
Plan Reviewer's activity | | | 12/13/2000 | | PEND |
|
|
|
12-13-2000. after reviewing plans additional information will be required. contacted builder and due to the weather conditions, project is being rescheduled for 12-18-2000. have contacted dakota design and will red-line missing section call-outs. addendums will be resubmitted concerning missing bearing, bearing alignement and detail for 2nd floor frame at linen closet. after phone conversation with lee harrison (structural engineer), re-inforcing for footings can be red-lined on stamped foundation plan. addendums will be submitted addressing design strength for concrete and tall wall framing.
|
Plans ACCEPTED BY PLAN CHECK | | | 12/12/2000 | | |
|
|
|
|
Plan Reviewer's activity | | | 12/12/2000 | | PEND |
|
|
|
started initial review pm 12-12-2000. spoke with doug (builder) on same date about possibilities of permit issuance by 12-14-2000. advised builder that if there were no problems after furthur review that perhaps this dead line could be met.
|
Plan Reviewer's activity | | | 12/12/2000 | | PEND |
|
|
|
started initial review. additional information will be required before issuance of permit. bearing problems at foundation level, lack of re-inforcing detail and call-out, floor bearing problems, overheight wall design, etc. have left message with designer.
|
Plans ACCEPTED BY PLAN CHECK | | | 12/12/2000 | | PEND |
|
|
|
|
Routing - PLANNING | 12/4/2000 | 12/4/2000 | 12/5/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/1/2000 | 12/1/2000 | 12/4/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 12/1/2000 | 12/1/2000 | 12/4/2000 | | DONE |
Rita DeYoung
|
|
|
Approved as Category 3
|
Application received | | | 12/1/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 12/5/2000 | 12/5/2000 | | | PEND |
|
|
|
|
Office Staff conference/action | | | | | PEND |
|
|
|
doug called 12/18/2000 i called him back and told him dan was still waiting for revised plans from dakota design. pe
|